X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0716081206004"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0716081206004
 
| Well ID: 0716081206004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.133781, -119.093741 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.133781, -119.093741 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-12-071-08W6/4
 
| Location: 00/06-12-071-08W6/4
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-12-071-08 W6/04
 
| Location Alias 2: 00/06-12-071-08 W6/04
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 071
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 08
 +
|-
 +
| Section: 12
 
|-
 
|-
 
| County/Municipality: [[County of Grande Prairie No. 1,_Alberta|County of Grande Prairie No. 1]]
 
| County/Municipality: [[County of Grande Prairie No. 1,_Alberta|County of Grande Prairie No. 1]]
 
|-
 
|-
| Well Name: TIDEWATER ELM 6-12-71-8
+
| Well Name: PIPE ELM 6-12-71-8
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Pipestone Energy Corp.]]
 
|-
 
|-
 
| License Number: 0127051
 
| License Number: 0127051
Line 29: Line 39:
 
| Final Drill Date: 1987-07-15
 
| Final Drill Date: 1987-07-15
 
|-
 
|-
| Well Total Depth: 2325 m
+
| Well Total Depth: 2325.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 55.133781
 
| Surface Hole Latitude: 55.133781
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1987-06-25
 +
| Obtained License
 +
|-
 +
| 1987-06-28
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1987-07-15
 +
| Finished Drilling
 +
|-
 +
| 1987-07-15
 +
| Well Log Performed
 +
|-
 +
| 1987-07-15
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1987-07-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1987-07-17
 +
| Well Log Performed
 +
|-
 +
| 1987-07-18
 +
| Drill Stem Test Performed
 +
|-
 +
| 1987-07-20
 +
| Production Casing Operation Performed
 +
|-
 +
| 1987-07-20
 +
| Rig Released
 +
|-
 +
| 1987-07-26
 +
| Well Log Performed
 +
|-
 +
| 1987-07-28
 +
| Well Log Performed
 +
|-
 +
| 1987-07-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-07-31
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1987-08-21
 +
| Well Log Performed
 +
|-
 +
| 1987-08-22
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1987-08-22
 +
| Plug Back Performed
 +
|-
 +
| 1987-08-22
 +
| Well Log Performed
 +
|-
 +
| 1987-08-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-08-23
 +
| Well Log Performed
 +
|-
 +
| 1987-08-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-08-27
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1987-09-02
 +
| Well Log Performed
 +
|-
 +
| 1987-09-03
 +
| Well Log Performed
 +
|-
 +
| 1987-09-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-09-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2004-06-11
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2004-06-11
 +
| Plug Back Performed
 +
|-
 +
| 2004-06-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-06-13
 +
| Plug Back Performed
 +
|-
 +
| 2004-06-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2004-06-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-06-14
 +
| Well Log Performed
 +
|-
 +
| 2004-06-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-06-15
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2004-06-15
 +
| Plug Back Performed
 +
|-
 +
| 2004-06-15
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2004-06-20
 +
| Well Abandoned
 +
|-
 +
| 2004-06-20
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 213:
 
| 1987-07-29
 
| 1987-07-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2220.5
+
| style="text-align: right;" | 2220.50
| style="text-align: right;" | 2222.5
+
| style="text-align: right;" | 2222.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-07-29
 
| 1987-07-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2223.8
+
| style="text-align: right;" | 2223.80
| style="text-align: right;" | 2226.5
+
| style="text-align: right;" | 2226.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-07-31
 
| 1987-07-31
| Fracture  
+
| Fracture
| style="text-align: right;" | 2220.5
+
| style="text-align: right;" | 2220.50
| style="text-align: right;" | 2226.5
+
| style="text-align: right;" | 2226.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-08-22
 
| 1987-08-22
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2207
+
| style="text-align: right;" | 2207.00
| style="text-align: right;" | 2215
+
| style="text-align: right;" | 2215.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-08-23
 
| 1987-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2001
+
| style="text-align: right;" | 2001.00
| style="text-align: right;" | 2006.5
+
| style="text-align: right;" | 2006.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-08-23
 
| 1987-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2007.5
+
| style="text-align: right;" | 2007.50
| style="text-align: right;" | 2009
+
| style="text-align: right;" | 2009.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-08-23
 
| 1987-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2011.5
+
| style="text-align: right;" | 2011.50
| style="text-align: right;" | 2018.5
+
| style="text-align: right;" | 2018.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-08-23
 
| 1987-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2022
+
| style="text-align: right;" | 2022.00
| style="text-align: right;" | 2031
+
| style="text-align: right;" | 2031.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-08-23
 
| 1987-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2033
+
| style="text-align: right;" | 2033.00
| style="text-align: right;" | 2042
+
| style="text-align: right;" | 2042.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-08-24
 
| 1987-08-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1969.5
+
| style="text-align: right;" | 1969.50
| style="text-align: right;" | 1974.5
+
| style="text-align: right;" | 1974.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-08-27
 
| 1987-08-27
| Fracture  
+
| Fracture
| style="text-align: right;" | 1969.5
+
| style="text-align: right;" | 1969.50
| style="text-align: right;" | 1974.5
+
| style="text-align: right;" | 1974.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-09-04
 
| 1987-09-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1582
+
| style="text-align: right;" | 1582.00
| style="text-align: right;" | 1590.5
+
| style="text-align: right;" | 1590.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-09-05
 
| 1987-09-05
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1582
+
| style="text-align: right;" | 1582.00
| style="text-align: right;" | 1590.5
+
| style="text-align: right;" | 1590.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-06-11
 
| 2004-06-11
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1976.5
+
| style="text-align: right;" | 1976.50
| style="text-align: right;" | 1993
+
| style="text-align: right;" | 1993.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-06-13
 
| 2004-06-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1937.5
+
| style="text-align: right;" | 1937.50
| style="text-align: right;" | 1945.5
+
| style="text-align: right;" | 1945.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-06-13
 
| 2004-06-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1565.5
+
| style="text-align: right;" | 1565.50
| style="text-align: right;" | 1573.5
+
| style="text-align: right;" | 1573.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-06-14
 
| 2004-06-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 467
+
| style="text-align: right;" | 467.00
| style="text-align: right;" | 469
+
| style="text-align: right;" | 469.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-06-14
 
| 2004-06-14
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 467
+
| style="text-align: right;" | 467.00
| style="text-align: right;" | 469
+
| style="text-align: right;" | 469.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-06-15
 
| 2004-06-15
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 459.5
+
| style="text-align: right;" | 459.50
| style="text-align: right;" | 475
+
| style="text-align: right;" | 475.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-06-15
 
| 2004-06-15
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 438
+
| style="text-align: right;" | 438.00
| style="text-align: right;" | 454
+
| style="text-align: right;" | 454.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 196: Line 335:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 11:13, 13 July 2020

Well Details

Well ID: 0716081206004
Loading map...
Location: 00/06-12-071-08W6/4
Location Alias: 00/06-12-71-08 W6M
Location Alias 2: 00/06-12-071-08 W6/04
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 08
Section: 12
County/Municipality: County of Grande Prairie No. 1
Well Name: PIPE ELM 6-12-71-8
Operator Name: Pipestone Energy Corp.
License Number: 0127051
License Date: 1987-06-25
License Status: Abandoned
Spud Date: 1987-06-27
Final Drill Date: 1987-07-15
Well Total Depth: 2325.00 m
Surface Hole Latitude: 55.133781
Surface Hole Longitude: -119.093741

For data sources see[1][2]

Well History

Date Event
1987-06-25 Obtained License
1987-06-28 Surface Casing Operation Performed
1987-07-15 Finished Drilling
1987-07-15 Well Log Performed
1987-07-15 Well Mode changed to Drilled and Cased
1987-07-17 Drill Stem Test Performed
1987-07-17 Well Log Performed
1987-07-18 Drill Stem Test Performed
1987-07-20 Production Casing Operation Performed
1987-07-20 Rig Released
1987-07-26 Well Log Performed
1987-07-28 Well Log Performed
1987-07-29 Perforation Treatment Performed - Jet Perforation
1987-07-31 Perforation Treatment Performed - Fractured
1987-08-21 Well Log Performed
1987-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-08-22 Plug Back Performed
1987-08-22 Well Log Performed
1987-08-23 Perforation Treatment Performed - Jet Perforation
1987-08-23 Well Log Performed
1987-08-24 Perforation Treatment Performed - Jet Perforation
1987-08-27 Perforation Treatment Performed - Fractured
1987-09-02 Well Log Performed
1987-09-03 Well Log Performed
1987-09-04 Perforation Treatment Performed - Jet Perforation
1987-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-11 Perforation Treatment Performed - Cement Plug
2004-06-11 Plug Back Performed
2004-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-13 Plug Back Performed
2004-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-14 Perforation Treatment Performed - Jet Perforation
2004-06-14 Well Log Performed
2004-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-15 Perforation Treatment Performed - Cement Plug
2004-06-15 Plug Back Performed
2004-06-15 Well Mode changed to Abandoned Zone
2004-06-20 Well Abandoned
2004-06-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-07-29 Perforation 2220.50 2222.50 13
1987-07-29 Perforation 2223.80 2226.50 13
1987-07-31 Fracture 2220.50 2226.50 0
1987-08-22 Packing Device Capped w/Cement 2207.00 2215.00 0
1987-08-23 Perforation 2001.00 2006.50 13
1987-08-23 Perforation 2007.50 2009.00 13
1987-08-23 Perforation 2011.50 2018.50 13
1987-08-23 Perforation 2022.00 2031.00 13
1987-08-23 Perforation 2033.00 2042.00 13
1987-08-24 Perforation 1969.50 1974.50 13
1987-08-27 Fracture 1969.50 1974.50 0
1987-09-04 Perforation 1582.00 1590.50 13
1987-09-05 Acid Treatment 1582.00 1590.50 0
2004-06-11 Cement Plug 1976.50 1993.00 0
2004-06-13 Packing Device Capped w/Cement 1937.50 1945.50 0
2004-06-13 Packing Device Capped w/Cement 1565.50 1573.50 0
2004-06-14 Perforation 467.00 469.00 17
2004-06-14 Acid Treatment 467.00 469.00 0
2004-06-15 Packing Device Capped w/Cement 459.50 475.00 0
2004-06-15 Cement Plug 438.00 454.00 0

For data sources see[4]



References