X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0504262807000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0504262807000
 
| Well ID: 0504262807000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.34328000000004977, -113.74164299999995364 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.343280, -113.741643 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-28-050-26W4/0
 
| Location: 00/07-28-050-26W4/0
 +
|-
 +
| Location Alias: 00/07-28-50-26 W4M
 +
|-
 +
| Location Alias 2: 00/07-28-050-26 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 050
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 28
 +
|-
 +
| County/Municipality: [[Devon,_Alberta|Devon]]
 
|-
 
|-
 
| Well Name: IMP 62 LEDUC 7-28MU-50-26
 
| Well Name: IMP 62 LEDUC 7-28MU-50-26
 +
|-
 +
| Operator Name: [[Imperial Oil Resources Limited]]
 +
|-
 +
| License Number: B0002088
 
|-
 
|-
 
| License Date: 1948-04-12
 
| License Date: 1948-04-12
 
|-
 
|-
| Final Drilling Date: 1948-06-21
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1948-05-17
 +
|-
 +
| Final Drill Date: 1948-06-21
 +
|-
 +
| Well Total Depth: 1621.20 m
 +
|-
 +
| Surface Hole Latitude: 53.343280
 +
|-
 +
| Surface Hole Longitude: -113.741643
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1948-04-12
 +
| Obtained License
 +
|-
 +
| 1948-06-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1948-06-18
 +
| Production Casing Operation Performed
 +
|-
 +
| 1948-06-21
 +
| Finished Drilling
 +
|-
 +
| 1948-06-21
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1948-06-21
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1948-06-22
 +
| Well Began Production
 +
|-
 +
| 1948-06-22
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Total Depth: 1621.2m
+
| 1948-06-22
 +
| Well Mode changed to Flowing
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1960-10-20
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Status: Abandoned Zone
+
| 1960-10-24
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Well Type: Not Applicable
+
| 1960-10-24
 +
| Well Mode changed to Flowing
 
|-
 
|-
| Configuration: Vertical
+
| 1960-11-08
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Latitude: 53.34328000000004977
+
| 1965-11-30
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 
|-
 
|-
| Longitude: -113.74164299999995364
+
| 1965-12-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
 +
| 1965-12-02
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1965-12-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1968-04-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1968-04-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1968-04-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1972-08-10
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1972-09-13
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1972-09-13
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1981-04-21
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1981-04-24
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1981-04-27
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1981-04-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-04-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-01-08
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-01-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1987-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-01-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-01-15
 +
| Perforation Treatment Performed - Chemical Squeeze
 +
|-
 +
| 1990-01-12
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1990-01-12
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1992-08-14
 +
| Well Log Performed
 +
|-
 +
| 1996-06-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-06-17
 +
| Plug Back Performed
 +
|-
 +
| 1996-06-17
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1996-06-17
 +
| Well Log Performed
 +
|-
 +
| 1996-06-17
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1996-07-24
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1948-06-21
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1615.10
 +
| style="text-align: right;" | 1618.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-10-20
 +
| Perforation
 +
| style="text-align: right;" | 1282.60
 +
| style="text-align: right;" | 1294.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1960-11-08
 +
| Acid Treatment
 +
| style="text-align: right;" | 1282.60
 +
| style="text-align: right;" | 1294.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-11-30
 +
| Acid Wash
 +
| style="text-align: right;" | 1287.20
 +
| style="text-align: right;" | 1294.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-12-01
 +
| Acid Treatment
 +
| style="text-align: right;" | 1287.20
 +
| style="text-align: right;" | 1294.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-12-02
 +
| Acid Treatment
 +
| style="text-align: right;" | 1282.60
 +
| style="text-align: right;" | 1286.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-12-06
 +
| Acid Treatment
 +
| style="text-align: right;" | 1286.30
 +
| style="text-align: right;" | 1290.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1968-04-01
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1282.60
 +
| style="text-align: right;" | 1294.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1972-08-10
 +
| Cement Plug
 +
| style="text-align: right;" | 1618.20
 +
| style="text-align: right;" | 1618.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-04-21
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1615.10
 +
| style="text-align: right;" | 1621.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-04-24
 +
| Cement Plug
 +
| style="text-align: right;" | 1615.80
 +
| style="text-align: right;" | 1621.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-04-27
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1615.10
 +
| style="text-align: right;" | 1615.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-04-29
 +
| Perforation
 +
| style="text-align: right;" | 1615.60
 +
| style="text-align: right;" | 1615.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1981-04-30
 +
| Acid Treatment
 +
| style="text-align: right;" | 1615.60
 +
| style="text-align: right;" | 1615.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1987-01-08
 +
| Acid Treatment
 +
| style="text-align: right;" | 1615.10
 +
| style="text-align: right;" | 1615.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1987-01-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1615.10
 +
| style="text-align: right;" | 1615.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1987-01-13
 +
| Perforation
 +
| style="text-align: right;" | 1613.70
 +
| style="text-align: right;" | 1613.90
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1987-01-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 1613.70
 +
| style="text-align: right;" | 1613.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1987-01-15
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 1613.70
 +
| style="text-align: right;" | 1613.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-06-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1592.00
 +
| style="text-align: right;" | 1600.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-06-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1262.00
 +
| style="text-align: right;" | 1270.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 240
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 192
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 492
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1971
 +
| style="text-align: right;" | 144
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1972
 +
| style="text-align: right;" | 2736
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1973
 +
| style="text-align: right;" | 8629
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1974
 +
| style="text-align: right;" | 8493
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1975
 +
| style="text-align: right;" | 2576
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1976
 +
| style="text-align: right;" | 592
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1980
 +
| style="text-align: right;" | 312
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1981
 +
| style="text-align: right;" | 5524
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1982
 +
| style="text-align: right;" | 7943
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1983
 +
| style="text-align: right;" | 8543
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1984
 +
| style="text-align: right;" | 8605
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1985
 +
| style="text-align: right;" | 8105
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1986
 +
| style="text-align: right;" | 8187
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1987
 +
| style="text-align: right;" | 7765
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 8294
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 7937
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1990
 +
| style="text-align: right;" | 268
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 13:48, 12 July 2020

Well Details

Well ID: 0504262807000
Loading map...
Location: 00/07-28-050-26W4/0
Location Alias: 00/07-28-50-26 W4M
Location Alias 2: 00/07-28-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 28
County/Municipality: Devon
Well Name: IMP 62 LEDUC 7-28MU-50-26
Operator Name: Imperial Oil Resources Limited
License Number: B0002088
License Date: 1948-04-12
License Status: Abandoned
Spud Date: 1948-05-17
Final Drill Date: 1948-06-21
Well Total Depth: 1621.20 m
Surface Hole Latitude: 53.343280
Surface Hole Longitude: -113.741643

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-04-12 Obtained License
1948-06-13 Drill Stem Test Performed
1948-06-18 Production Casing Operation Performed
1948-06-21 Finished Drilling
1948-06-21 Perforation Treatment Performed - Open-Hole Completion
1948-06-21 Well Mode changed to Drilled and Cased
1948-06-22 Well Began Production
1948-06-22 Well Fluid changed to Crude Oil
1948-06-22 Well Mode changed to Flowing
1960-10-20 Perforation Treatment Performed - Jet Perforation
1960-10-24 Well Fluid changed to Crude Oil
1960-10-24 Well Mode changed to Flowing
1960-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-30 Perforation Treatment Performed - Acid Wash - No Pressure
1965-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-01 Perforation Treatment Performed - Cement Squeeze
1968-04-01 Well Fluid changed to Crude Oil
1968-04-01 Well Mode changed to Flowing
1972-08-10 Perforation Treatment Performed - Cement Plug
1972-09-13 Well Fluid changed to Crude Oil
1972-09-13 Well Mode changed to Pumping
1981-04-21 Perforation Treatment Performed - Open-Hole Completion
1981-04-24 Perforation Treatment Performed - Cement Plug
1981-04-27 Perforation Treatment Performed - Open-Hole Completion
1981-04-29 Perforation Treatment Performed - Jet Perforation
1981-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-09 Perforation Treatment Performed - Cement Squeeze
1987-01-13 Perforation Treatment Performed - Jet Perforation
1987-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-15 Perforation Treatment Performed - Chemical Squeeze
1990-01-12 Well Fluid changed to Crude Oil
1990-01-12 Well Mode changed to Suspended
1992-08-14 Well Log Performed
1996-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-17 Plug Back Performed
1996-06-17 Well Fluid changed to Crude Oil
1996-06-17 Well Log Performed
1996-06-17 Well Mode changed to Abandoned Zone
1996-07-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-06-21 Open Hole/Barefoot Completion 1615.10 1618.80 0
1960-10-20 Perforation 1282.60 1294.80 7
1960-11-08 Acid Treatment 1282.60 1294.80 0
1965-11-30 Acid Wash 1287.20 1294.80 0
1965-12-01 Acid Treatment 1287.20 1294.80 0
1965-12-02 Acid Treatment 1282.60 1286.90 0
1965-12-06 Acid Treatment 1286.30 1290.80 0
1968-04-01 Cement Squeeze 1282.60 1294.80 0
1972-08-10 Cement Plug 1618.20 1618.80 0
1981-04-21 Open Hole/Barefoot Completion 1615.10 1621.20 0
1981-04-24 Cement Plug 1615.80 1621.20 0
1981-04-27 Open Hole/Barefoot Completion 1615.10 1615.80 0
1981-04-29 Perforation 1615.60 1615.70 7
1981-04-30 Acid Treatment 1615.60 1615.70 0
1987-01-08 Acid Treatment 1615.10 1615.80 0
1987-01-09 Cement Squeeze 1615.10 1615.80 0
1987-01-13 Perforation 1613.70 1613.90 3
1987-01-14 Acid Treatment 1613.70 1613.90 0
1987-01-15 Chemical Squeeze 1613.70 1613.90 0
1996-06-17 Packing Device Capped w/Cement 1592.00 1600.00 0
1996-06-17 Packing Device Capped w/Cement 1262.00 1270.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 240 0.0 0.0 0.0
1968 192 0.0 0.0 0.0
1970 492 0.0 0.0 0.0
1971 144 0.0 0.0 0.0
1972 2736 0.0 0.0 0.0
1973 8629 0.0 0.0 0.0
1974 8493 0.0 0.0 0.0
1975 2576 0.0 0.0 0.0
1976 592 0.0 0.0 0.0
1980 312 0.0 0.0 0.0
1981 5524 0.0 0.0 0.0
1982 7943 0.0 0.0 0.0
1983 8543 0.0 0.0 0.0
1984 8605 0.0 0.0 0.0
1985 8105 0.0 0.0 0.0
1986 8187 0.0 0.0 0.0
1987 7765 0.0 0.0 0.0
1988 8294 0.0 0.0 0.0
1989 7937 0.0 0.0 0.0
1990 268 0.0 0.0 0.0

For data sources see[5]

References