X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0596092514006"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0596092514006
 
| Well ID: 0596092514006
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.133197, -119.21708 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.133197, -119.21708 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/14-25-059-09W6/6
 
| Location: 00/14-25-059-09W6/6
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/14-25-059-09 W6/06
 
| Location Alias 2: 00/14-25-059-09 W6/06
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 059
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 09
 +
|-
 +
| Section: 25
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
Line 17: Line 27:
 
| Well Name: PANTERRA RES GRDCACH 14-25-59-9
 
| Well Name: PANTERRA RES GRDCACH 14-25-59-9
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Pieridae Alberta Production Ltd.]]
 
|-
 
|-
 
| License Number: 0217303
 
| License Number: 0217303
Line 29: Line 39:
 
| Final Drill Date: 1999-09-08
 
| Final Drill Date: 1999-09-08
 
|-
 
|-
| Well Total Depth: 4493 m
+
| Well Total Depth: 4493.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.133197
 
| Surface Hole Latitude: 54.133197
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1998-08-31
 +
| Obtained License
 +
|-
 +
| 1998-11-30
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1999-01-07
 +
| Well Log Performed
 +
|-
 +
| 1999-01-16
 +
| Plug Back Performed
 +
|-
 +
| 1999-01-21
 +
| Direction Drilling Operation Performed - Sidetrack Fish
 +
|-
 +
| 1999-01-24
 +
| Plug Back Performed
 +
|-
 +
| 1999-01-27
 +
| Direction Drilling Operation Performed - Sidetrack Fish
 +
|-
 +
| 1999-07-15
 +
| Well Log Performed
 +
|-
 +
| 1999-07-25
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 1999-08-01
 +
| Well Log Performed
 +
|-
 +
| 1999-09-08
 +
| Finished Drilling
 +
|-
 +
| 1999-09-08
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1999-09-10
 +
| Well Log Performed
 +
|-
 +
| 1999-09-11
 +
| Well Log Performed
 +
|-
 +
| 1999-09-17
 +
| Well Log Performed
 +
|-
 +
| 1999-09-23
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1999-10-05
 +
| Rig Released
 +
|-
 +
| 1999-10-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-10-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1999-10-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1999-10-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-10-24
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1999-10-24
 +
| Plug Back Performed
 +
|-
 +
| 1999-10-26
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1999-10-26
 +
| Plug Back Performed
 +
|-
 +
| 1999-10-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-10-29
 +
| Plug Back Performed
 +
|-
 +
| 1999-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-11-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1999-11-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1999-11-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-11-30
 +
| Plug Back Performed
 +
|-
 +
| 1999-12-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-12-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-12-08
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-12-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-12-10
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-12-10
 +
| Perforation Treatment Performed - Chemical Squeeze
 +
|-
 +
| 1999-12-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-12-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-12-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-01-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-01-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-01-05
 +
| Plug Back Performed
 +
|-
 +
| 2000-01-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-01-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-01-12
 +
| Plug Back Performed
 +
|-
 +
| 2000-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-01-13
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2000-01-18
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-01-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-01-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-01-24
 +
| Plug Back Performed
 +
|-
 +
| 2000-01-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2000-01-26
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-02-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2000-02-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-03-01
 +
| Well Structure changed to Commingled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 259:
 
|-
 
|-
 
| 1999-01-21
 
| 1999-01-21
| style="text-align: right;" | 1925
+
| style="text-align: right;" | 1925.00
 
| Sidetrack fish
 
| Sidetrack fish
 
|-
 
|-
 
| 1999-01-27
 
| 1999-01-27
| style="text-align: right;" | 1915
+
| style="text-align: right;" | 1915.00
 
| Sidetrack fish
 
| Sidetrack fish
 
|-
 
|-
Line 74: Line 270:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 87: Line 283:
 
| 1999-10-09
 
| 1999-10-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 4243
+
| style="text-align: right;" | 4243.00
| style="text-align: right;" | 4266
+
| style="text-align: right;" | 4266.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-10-13
 
| 1999-10-13
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 4243
+
| style="text-align: right;" | 4243.00
| style="text-align: right;" | 4266
+
| style="text-align: right;" | 4266.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-10-17
 
| 1999-10-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 4243
+
| style="text-align: right;" | 4243.00
| style="text-align: right;" | 4266
+
| style="text-align: right;" | 4266.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-10-21
 
| 1999-10-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 4306
+
| style="text-align: right;" | 4306.00
| style="text-align: right;" | 4309
+
| style="text-align: right;" | 4309.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-10-21
 
| 1999-10-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 4469
+
| style="text-align: right;" | 4469.00
| style="text-align: right;" | 4472
+
| style="text-align: right;" | 4472.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-10-24
 
| 1999-10-24
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 4297
+
| style="text-align: right;" | 4297.00
| style="text-align: right;" | 4493
+
| style="text-align: right;" | 4493.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-10-26
 
| 1999-10-26
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 4266
+
| style="text-align: right;" | 4266.00
| style="text-align: right;" | 4297
+
| style="text-align: right;" | 4297.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-10-29
 
| 1999-10-29
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 4123.4
+
| style="text-align: right;" | 4123.40
| style="text-align: right;" | 4175
+
| style="text-align: right;" | 4175.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-10-30
 
| 1999-10-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3801
+
| style="text-align: right;" | 3801.00
| style="text-align: right;" | 3802
+
| style="text-align: right;" | 3802.00
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
|-
 
|-
 
| 1999-10-30
 
| 1999-10-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3804.5
+
| style="text-align: right;" | 3804.50
| style="text-align: right;" | 3805
+
| style="text-align: right;" | 3805.00
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
|-
 
|-
 
| 1999-10-30
 
| 1999-10-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3812
+
| style="text-align: right;" | 3812.00
| style="text-align: right;" | 3815
+
| style="text-align: right;" | 3815.00
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
|-
 
|-
 
| 1999-10-30
 
| 1999-10-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3819
+
| style="text-align: right;" | 3819.00
| style="text-align: right;" | 3832.3
+
| style="text-align: right;" | 3832.30
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
|-
 
|-
 
| 1999-11-09
 
| 1999-11-09
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3801
+
| style="text-align: right;" | 3801.00
| style="text-align: right;" | 3832.3
+
| style="text-align: right;" | 3832.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-11-17
 
| 1999-11-17
| Fracture  
+
| Fracture
| style="text-align: right;" | 3801
+
| style="text-align: right;" | 3801.00
| style="text-align: right;" | 3832.3
+
| style="text-align: right;" | 3832.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-11-30
 
| 1999-11-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3622
+
| style="text-align: right;" | 3622.00
| style="text-align: right;" | 3630
+
| style="text-align: right;" | 3630.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-12-01
 
| 1999-12-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3078
+
| style="text-align: right;" | 3078.00
| style="text-align: right;" | 3091
+
| style="text-align: right;" | 3091.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1999-12-06
 
| 1999-12-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3126
+
| style="text-align: right;" | 3126.00
| style="text-align: right;" | 3126.3
+
| style="text-align: right;" | 3126.30
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1999-12-08
 
| 1999-12-08
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3078
+
| style="text-align: right;" | 3078.00
| style="text-align: right;" | 3126.3
+
| style="text-align: right;" | 3126.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-12-09
 
| 1999-12-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2350
+
| style="text-align: right;" | 2350.00
| style="text-align: right;" | 2350.3
+
| style="text-align: right;" | 2350.30
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1999-12-09
 
| 1999-12-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3055
+
| style="text-align: right;" | 3055.00
| style="text-align: right;" | 3055.3
+
| style="text-align: right;" | 3055.30
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1999-12-10
 
| 1999-12-10
| Chemical Squeeze  
+
| Chemical Squeeze
| style="text-align: right;" | 3055
+
| style="text-align: right;" | 3055.00
| style="text-align: right;" | 3055.3
+
| style="text-align: right;" | 3055.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-12-10
 
| 1999-12-10
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3055
+
| style="text-align: right;" | 3055.00
| style="text-align: right;" | 3055.3
+
| style="text-align: right;" | 3055.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-12-12
 
| 1999-12-12
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2350
+
| style="text-align: right;" | 2350.00
| style="text-align: right;" | 2350.3
+
| style="text-align: right;" | 2350.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-12-12
 
| 1999-12-12
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2350
+
| style="text-align: right;" | 2350.00
| style="text-align: right;" | 2350.3
+
| style="text-align: right;" | 2350.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-12-18
 
| 1999-12-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3078
+
| style="text-align: right;" | 3078.00
| style="text-align: right;" | 3091
+
| style="text-align: right;" | 3091.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1999-12-20
 
| 1999-12-20
| Fracture  
+
| Fracture
| style="text-align: right;" | 3078
+
| style="text-align: right;" | 3078.00
| style="text-align: right;" | 3091
+
| style="text-align: right;" | 3091.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-01-05
 
| 2000-01-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3045
+
| style="text-align: right;" | 3045.00
| style="text-align: right;" | 3053
+
| style="text-align: right;" | 3053.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-01-05
 
| 2000-01-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3014
+
| style="text-align: right;" | 3014.00
| style="text-align: right;" | 3023
+
| style="text-align: right;" | 3023.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 2000-01-07
 
| 2000-01-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 3014
+
| style="text-align: right;" | 3014.00
| style="text-align: right;" | 3023
+
| style="text-align: right;" | 3023.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-01-12
 
| 2000-01-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2996
+
| style="text-align: right;" | 2996.00
| style="text-align: right;" | 3004
+
| style="text-align: right;" | 3004.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-01-13
 
| 2000-01-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
| style="text-align: right;" | 2480
+
| style="text-align: right;" | 2480.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 2000-01-18
 
| 2000-01-18
| Fracture  
+
| Fracture
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
| style="text-align: right;" | 2480
+
| style="text-align: right;" | 2480.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-01-24
 
| 2000-01-24
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2457
+
| style="text-align: right;" | 2457.00
| style="text-align: right;" | 2465
+
| style="text-align: right;" | 2465.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-01-24
 
| 2000-01-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2433
+
| style="text-align: right;" | 2433.00
| style="text-align: right;" | 2442
+
| style="text-align: right;" | 2442.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2000-01-26
 
| 2000-01-26
| Fracture  
+
| Fracture
| style="text-align: right;" | 2433
+
| style="text-align: right;" | 2433.00
| style="text-align: right;" | 2442
+
| style="text-align: right;" | 2442.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-02-04
 
| 2000-02-04
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2350
+
| style="text-align: right;" | 2350.00
| style="text-align: right;" | 2350.5
+
| style="text-align: right;" | 2350.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-02-08
 
| 2000-02-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
| style="text-align: right;" | 2480
+
| style="text-align: right;" | 2480.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
Line 311: Line 507:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 13:06, 12 July 2020

Well Details

Well ID: 0596092514006
Loading map...
Location: 00/14-25-059-09W6/6
Location Alias: 00/14-25-59-09 W6M
Location Alias 2: 00/14-25-059-09 W6/06
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 09
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: PANTERRA RES GRDCACH 14-25-59-9
Operator Name: Pieridae Alberta Production Ltd.
License Number: 0217303
License Date: 1998-08-31
License Status: Suspension
Spud Date: 1998-11-14
Final Drill Date: 1999-09-08
Well Total Depth: 4493.00 m
Surface Hole Latitude: 54.133197
Surface Hole Longitude: -119.21708

For data sources see[1][2]

Well History

Date Event
1998-08-31 Obtained License
1998-11-30 Surface Casing Operation Performed
1999-01-07 Well Log Performed
1999-01-16 Plug Back Performed
1999-01-21 Direction Drilling Operation Performed - Sidetrack Fish
1999-01-24 Plug Back Performed
1999-01-27 Direction Drilling Operation Performed - Sidetrack Fish
1999-07-15 Well Log Performed
1999-07-25 Intermediate Casing Operation Performed
1999-08-01 Well Log Performed
1999-09-08 Finished Drilling
1999-09-08 Well Mode changed to Drilled and Cased
1999-09-10 Well Log Performed
1999-09-11 Well Log Performed
1999-09-17 Well Log Performed
1999-09-23 Liner Casing Operation Performed
1999-10-05 Rig Released
1999-10-09 Perforation Treatment Performed - Jet Perforation
1999-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-21 Perforation Treatment Performed - Jet Perforation
1999-10-24 Perforation Treatment Performed - Cement Plug
1999-10-24 Plug Back Performed
1999-10-26 Perforation Treatment Performed - Cement Plug
1999-10-26 Plug Back Performed
1999-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-29 Plug Back Performed
1999-10-30 Perforation Treatment Performed - Jet Perforation
1999-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-17 Perforation Treatment Performed - Fractured
1999-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-30 Plug Back Performed
1999-12-01 Perforation Treatment Performed - Jet Perforation
1999-12-06 Perforation Treatment Performed - Jet Perforation
1999-12-08 Perforation Treatment Performed - Cement Squeeze
1999-12-09 Perforation Treatment Performed - Jet Perforation
1999-12-10 Perforation Treatment Performed - Cement Squeeze
1999-12-10 Perforation Treatment Performed - Chemical Squeeze
1999-12-12 Perforation Treatment Performed - Cement Squeeze
1999-12-18 Perforation Treatment Performed - Jet Perforation
1999-12-20 Perforation Treatment Performed - Fractured
2000-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-05 Perforation Treatment Performed - Jet Perforation
2000-01-05 Plug Back Performed
2000-01-07 Perforation Treatment Performed - Fractured
2000-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-12 Plug Back Performed
2000-01-13 Perforation Treatment Performed - Jet Perforation
2000-01-13 Well Mode changed to Drilled and Cased
2000-01-18 Perforation Treatment Performed - Fractured
2000-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-24 Perforation Treatment Performed - Jet Perforation
2000-01-24 Plug Back Performed
2000-01-24 Well Mode changed to Drilled and Cased
2000-01-26 Perforation Treatment Performed - Fractured
2000-02-04 Perforation Treatment Performed - Cement Squeeze
2000-02-08 Perforation Treatment Performed - Jet Perforation
2001-03-01 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-01-21 1925.00 Sidetrack fish
1999-01-27 1915.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-10-09 Perforation 4243.00 4266.00 13
1999-10-13 Acid Treatment 4243.00 4266.00 0
1999-10-17 Acid Treatment 4243.00 4266.00 0
1999-10-21 Perforation 4306.00 4309.00 13
1999-10-21 Perforation 4469.00 4472.00 13
1999-10-24 Cement Plug 4297.00 4493.00 0
1999-10-26 Cement Plug 4266.00 4297.00 0
1999-10-29 Packing Device Capped w/Cement 4123.40 4175.00 0
1999-10-30 Perforation 3801.00 3802.00 16
1999-10-30 Perforation 3804.50 3805.00 16
1999-10-30 Perforation 3812.00 3815.00 16
1999-10-30 Perforation 3819.00 3832.30 16
1999-11-09 Acid Treatment 3801.00 3832.30 0
1999-11-17 Fracture 3801.00 3832.30 0
1999-11-30 Packing Device Capped w/Cement 3622.00 3630.00 0
1999-12-01 Perforation 3078.00 3091.00 18
1999-12-06 Perforation 3126.00 3126.30 18
1999-12-08 Cement Squeeze 3078.00 3126.30 0
1999-12-09 Perforation 2350.00 2350.30 18
1999-12-09 Perforation 3055.00 3055.30 18
1999-12-10 Chemical Squeeze 3055.00 3055.30 0
1999-12-10 Cement Squeeze 3055.00 3055.30 0
1999-12-12 Cement Squeeze 2350.00 2350.30 0
1999-12-12 Cement Squeeze 2350.00 2350.30 0
1999-12-18 Perforation 3078.00 3091.00 18
1999-12-20 Fracture 3078.00 3091.00 0
2000-01-05 Packing Device Capped w/Cement 3045.00 3053.00 0
2000-01-05 Perforation 3014.00 3023.00 18
2000-01-07 Fracture 3014.00 3023.00 0
2000-01-12 Packing Device Capped w/Cement 2996.00 3004.00 0
2000-01-13 Perforation 2469.00 2480.00 18
2000-01-18 Fracture 2469.00 2480.00 0
2000-01-24 Packing Device Capped w/Cement 2457.00 2465.00 0
2000-01-24 Perforation 2433.00 2442.00 17
2000-01-26 Fracture 2433.00 2442.00 0
2000-02-04 Cement Squeeze 2350.00 2350.50 0
2000-02-08 Perforation 2469.00 2480.00 17

For data sources see[5]



References