X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0595163603003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0595163603003
 
| Well ID: 0595163603003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.140211, -116.265437 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.140211, -116.265437 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-36-059-16W5/3
 
| Location: 00/03-36-059-16W5/3
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/03-36-059-16 W5/03
 
| Location Alias 2: 00/03-36-059-16 W5/03
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 059
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 16
 +
|-
 +
| Section: 36
 
|-
 
|-
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
Line 17: Line 27:
 
| Well Name: BIRCHILL WINDFALL 3-36-59-16
 
| Well Name: BIRCHILL WINDFALL 3-36-59-16
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[TAQA North Ltd.]]
 
|-
 
|-
 
| License Number: 0276475
 
| License Number: 0276475
Line 29: Line 39:
 
| Final Drill Date: 2002-12-29
 
| Final Drill Date: 2002-12-29
 
|-
 
|-
| Well Total Depth: 2620 m
+
| Well Total Depth: 2620.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.140211
 
| Surface Hole Latitude: 54.140211
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2002-11-22
 +
| Obtained License
 +
|-
 +
| 2002-12-08
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2002-12-24
 +
| Well Log Performed
 +
|-
 +
| 2002-12-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 2002-12-29
 +
| Finished Drilling
 +
|-
 +
| 2002-12-29
 +
| Well Log Performed
 +
|-
 +
| 2002-12-29
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2002-12-30
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2002-12-30
 +
| Rig Released
 +
|-
 +
| 2005-10-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2005-10-08
 +
| Plug Back Performed
 +
|-
 +
| 2005-10-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-10-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2005-10-12
 +
| Plug Back Performed
 +
|-
 +
| 2005-10-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-10-14
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2005-10-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-08-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-08-26
 +
| Plug Back Performed
 +
|-
 +
| 2011-08-26
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2011-08-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-08-27
 +
| Plug Back Performed
 +
|-
 +
| 2011-08-27
 +
| Well Log Performed
 +
|-
 +
| 2011-08-28
 +
| Well Log Performed
 +
|-
 +
| 2011-08-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-08-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-08-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-09-01
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2011-09-02
 +
| Well Log Performed
 +
|-
 +
| 2011-09-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-09-06
 +
| Well Log Performed
 +
|-
 +
| 2011-09-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-09-07
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-09-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-09-09
 +
| Well Log Performed
 +
|-
 +
| 2011-09-10
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-09-15
 +
| Well Log Performed
 +
|-
 +
| 2011-09-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-09-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-09-18
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-09-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-09-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-09-21
 +
| Well Log Performed
 +
|-
 +
| 2011-09-22
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-09-22
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-10-07
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 234:
 
| 2002-12-30
 
| 2002-12-30
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 2495
+
| style="text-align: right;" | 2495.00
| style="text-align: right;" | 2620
+
| style="text-align: right;" | 2620.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-10-08
 
| 2005-10-08
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
| style="text-align: right;" | 2479
+
| style="text-align: right;" | 2479.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-10-10
 
| 2005-10-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1949.5
+
| style="text-align: right;" | 1949.50
| style="text-align: right;" | 1952
+
| style="text-align: right;" | 1952.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-12
 
| 2005-10-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1932
+
| style="text-align: right;" | 1932.00
| style="text-align: right;" | 1940
+
| style="text-align: right;" | 1940.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-10-13
 
| 2005-10-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1881
+
| style="text-align: right;" | 1881.00
| style="text-align: right;" | 1883
+
| style="text-align: right;" | 1883.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-13
 
| 2005-10-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1885
+
| style="text-align: right;" | 1885.00
| style="text-align: right;" | 1887
+
| style="text-align: right;" | 1887.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-14
 
| 2005-10-14
| Fracture  
+
| Fracture
| style="text-align: right;" | 1881
+
| style="text-align: right;" | 1881.00
| style="text-align: right;" | 1887
+
| style="text-align: right;" | 1887.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-10-17
 
| 2005-10-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1689
+
| style="text-align: right;" | 1689.00
| style="text-align: right;" | 1690
+
| style="text-align: right;" | 1690.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-08-26
 
| 2011-08-26
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1858.5
+
| style="text-align: right;" | 1858.50
| style="text-align: right;" | 1866.5
+
| style="text-align: right;" | 1866.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-08-27
 
| 2011-08-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1667
+
| style="text-align: right;" | 1667.00
| style="text-align: right;" | 1676
+
| style="text-align: right;" | 1676.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-08-29
 
| 2011-08-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 843
+
| style="text-align: right;" | 843.00
| style="text-align: right;" | 847
+
| style="text-align: right;" | 847.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-08-29
 
| 2011-08-29
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 847
+
| style="text-align: right;" | 847.00
| style="text-align: right;" | 850
+
| style="text-align: right;" | 850.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-08-31
 
| 2011-08-31
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 843
+
| style="text-align: right;" | 843.00
| style="text-align: right;" | 847
+
| style="text-align: right;" | 847.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-01
 
| 2011-09-01
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 723
+
| style="text-align: right;" | 723.00
| style="text-align: right;" | 843
+
| style="text-align: right;" | 843.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-06
 
| 2011-09-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 707
+
| style="text-align: right;" | 707.00
| style="text-align: right;" | 710
+
| style="text-align: right;" | 710.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-09-07
 
| 2011-09-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 702
+
| style="text-align: right;" | 702.00
| style="text-align: right;" | 703
+
| style="text-align: right;" | 703.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-07
 
| 2011-09-07
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 707
+
| style="text-align: right;" | 707.00
| style="text-align: right;" | 710
+
| style="text-align: right;" | 710.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-09
 
| 2011-09-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 675
+
| style="text-align: right;" | 675.00
| style="text-align: right;" | 678
+
| style="text-align: right;" | 678.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-09-10
 
| 2011-09-10
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 675
+
| style="text-align: right;" | 675.00
| style="text-align: right;" | 678
+
| style="text-align: right;" | 678.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-17
 
| 2011-09-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 679
+
| style="text-align: right;" | 679.00
| style="text-align: right;" | 682
+
| style="text-align: right;" | 682.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-09-17
 
| 2011-09-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 694
+
| style="text-align: right;" | 694.00
| style="text-align: right;" | 697
+
| style="text-align: right;" | 697.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-09-18
 
| 2011-09-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 674
+
| style="text-align: right;" | 674.00
| style="text-align: right;" | 686
+
| style="text-align: right;" | 686.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-18
 
| 2011-09-18
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 694
+
| style="text-align: right;" | 694.00
| style="text-align: right;" | 697
+
| style="text-align: right;" | 697.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-21
 
| 2011-09-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 478
+
| style="text-align: right;" | 478.00
| style="text-align: right;" | 479
+
| style="text-align: right;" | 479.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-21
 
| 2011-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 475
+
| style="text-align: right;" | 475.00
| style="text-align: right;" | 478
+
| style="text-align: right;" | 478.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-09-21
 
| 2011-09-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 661
+
| style="text-align: right;" | 661.00
| style="text-align: right;" | 670
+
| style="text-align: right;" | 670.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-22
 
| 2011-09-22
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 460
+
| style="text-align: right;" | 460.00
| style="text-align: right;" | 468
+
| style="text-align: right;" | 468.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-09-22
 
| 2011-09-22
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 475
+
| style="text-align: right;" | 475.00
| style="text-align: right;" | 478
+
| style="text-align: right;" | 478.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 244: Line 404:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 08:59, 12 July 2020

Well Details

Well ID: 0595163603003
Loading map...
Location: 00/03-36-059-16W5/3
Location Alias: 00/03-36-59-16 W5M
Location Alias 2: 00/03-36-059-16 W5/03
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 16
Section: 36
County/Municipality: Woodlands County
Well Name: BIRCHILL WINDFALL 3-36-59-16
Operator Name: TAQA North Ltd.
License Number: 0276475
License Date: 2002-11-22
License Status: Abandoned
Spud Date: 2002-12-07
Final Drill Date: 2002-12-29
Well Total Depth: 2620.00 m
Surface Hole Latitude: 54.140211
Surface Hole Longitude: -116.265437

For data sources see[1][2]

Well History

Date Event
2002-11-22 Obtained License
2002-12-08 Surface Casing Operation Performed
2002-12-24 Well Log Performed
2002-12-25 Production Casing Operation Performed
2002-12-29 Finished Drilling
2002-12-29 Well Log Performed
2002-12-29 Well Mode changed to Drilled and Cased
2002-12-30 Perforation Treatment Performed - Open-Hole Completion
2002-12-30 Rig Released
2005-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-08 Plug Back Performed
2005-10-10 Perforation Treatment Performed - Jet Perforation
2005-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-12 Plug Back Performed
2005-10-13 Perforation Treatment Performed - Jet Perforation
2005-10-14 Perforation Treatment Performed - Fractured
2005-10-17 Perforation Treatment Performed - Jet Perforation
2011-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-26 Plug Back Performed
2011-08-26 Well Mode changed to Abandoned Zone
2011-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-27 Plug Back Performed
2011-08-27 Well Log Performed
2011-08-28 Well Log Performed
2011-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-29 Perforation Treatment Performed - Jet Perforation
2011-08-31 Perforation Treatment Performed - Cement Squeeze
2011-09-01 Perforation Treatment Performed - Cement Plug
2011-09-02 Well Log Performed
2011-09-06 Perforation Treatment Performed - Jet Perforation
2011-09-06 Well Log Performed
2011-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-07 Perforation Treatment Performed - Cement Squeeze
2011-09-09 Perforation Treatment Performed - Jet Perforation
2011-09-09 Well Log Performed
2011-09-10 Perforation Treatment Performed - Cement Squeeze
2011-09-15 Well Log Performed
2011-09-17 Perforation Treatment Performed - Jet Perforation
2011-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-18 Perforation Treatment Performed - Cement Squeeze
2011-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-21 Perforation Treatment Performed - Jet Perforation
2011-09-21 Well Log Performed
2011-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-22 Perforation Treatment Performed - Cement Squeeze
2011-10-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-30 Open Hole/Barefoot Completion 2495.00 2620.00 0
2005-10-08 Packing Device Capped w/Cement 2469.00 2479.00 0
2005-10-10 Perforation 1949.50 1952.00 17
2005-10-12 Packing Device Capped w/Cement 1932.00 1940.00 0
2005-10-13 Perforation 1881.00 1883.00 17
2005-10-13 Perforation 1885.00 1887.00 17
2005-10-14 Fracture 1881.00 1887.00 0
2005-10-17 Perforation 1689.00 1690.00 17
2011-08-26 Packing Device Capped w/Cement 1858.50 1866.50 0
2011-08-27 Packing Device Capped w/Cement 1667.00 1676.00 0
2011-08-29 Perforation 843.00 847.00 17
2011-08-29 Packing Device Capped w/Cement 847.00 850.00 0
2011-08-31 Cement Squeeze 843.00 847.00 0
2011-09-01 Cement Plug 723.00 843.00 0
2011-09-06 Perforation 707.00 710.00 17
2011-09-07 Packing Device Capped w/Cement 702.00 703.00 0
2011-09-07 Cement Squeeze 707.00 710.00 0
2011-09-09 Perforation 675.00 678.00 17
2011-09-10 Cement Squeeze 675.00 678.00 0
2011-09-17 Perforation 679.00 682.00 17
2011-09-17 Perforation 694.00 697.00 17
2011-09-18 Packing Device Capped w/Cement 674.00 686.00 0
2011-09-18 Cement Squeeze 694.00 697.00 0
2011-09-21 Packing Device Capped w/Cement 478.00 479.00 0
2011-09-21 Perforation 475.00 478.00 17
2011-09-21 Packing Device Capped w/Cement 661.00 670.00 0
2011-09-22 Packing Device Capped w/Cement 460.00 468.00 0
2011-09-22 Cement Squeeze 475.00 478.00 0

For data sources see[4]



References