X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0594231111004"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0594231111004
 
| Well ID: 0594231111004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.088944, -113.341351 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.088944, -113.341351 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/11-11-059-23W4/4
 
| Location: 00/11-11-059-23W4/4
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/11-11-059-23 W4/04
 
| Location Alias 2: 00/11-11-059-23 W4/04
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 059
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 11
 
|-
 
|-
 
| County/Municipality: [[Thorhild County,_Alberta|Thorhild County]]
 
| County/Municipality: [[Thorhild County,_Alberta|Thorhild County]]
Line 17: Line 27:
 
| Well Name: CONOCO REDWATER 11-11-59-23
 
| Well Name: CONOCO REDWATER 11-11-59-23
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Pine Cliff Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0055258
 
| License Number: 0055258
Line 29: Line 39:
 
| Final Drill Date: 1975-10-28
 
| Final Drill Date: 1975-10-28
 
|-
 
|-
| Well Total Depth: 885.4 m
+
| Well Total Depth: 885.40 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.088944
 
| Surface Hole Latitude: 54.088944
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1975-10-07
 +
| Obtained License
 +
|-
 +
| 1975-10-27
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-10-28
 +
| Finished Drilling
 +
|-
 +
| 1975-10-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1975-10-30
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-10-31
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-11-01
 +
| Production Casing Operation Performed
 +
|-
 +
| 1976-06-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-06-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-06-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-10-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1993-10-12
 +
| Plug Back Performed
 +
|-
 +
| 1993-10-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-10-14
 +
| Well Began Production
 +
|-
 +
| 1993-10-14
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1993-10-14
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1993-11-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-11-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1993-11-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-11-30
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1993-11-30
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1994-02-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1994-02-28
 +
| Well Abandoned
 +
|-
 +
| 1994-02-28
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1994-02-28
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 174:
 
| 1976-06-04
 
| 1976-06-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 841.2
+
| style="text-align: right;" | 841.20
| style="text-align: right;" | 842.8
+
| style="text-align: right;" | 842.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1976-06-07
 
| 1976-06-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 833.9
+
| style="text-align: right;" | 833.90
| style="text-align: right;" | 835.5
+
| style="text-align: right;" | 835.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1976-06-14
 
| 1976-06-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 803.8
+
| style="text-align: right;" | 803.80
| style="text-align: right;" | 806.5
+
| style="text-align: right;" | 806.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-10-12
 
| 1993-10-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 830
+
| style="text-align: right;" | 830.00
| style="text-align: right;" | 838
+
| style="text-align: right;" | 838.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-10-12
 
| 1993-10-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 819
+
| style="text-align: right;" | 819.00
| style="text-align: right;" | 827
+
| style="text-align: right;" | 827.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-10-12
 
| 1993-10-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 790
+
| style="text-align: right;" | 790.00
| style="text-align: right;" | 798
+
| style="text-align: right;" | 798.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-10-13
 
| 1993-10-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 525.5
+
| style="text-align: right;" | 525.50
| style="text-align: right;" | 526.1
+
| style="text-align: right;" | 526.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-11-19
 
| 1993-11-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 527.3
+
| style="text-align: right;" | 527.30
| style="text-align: right;" | 527.8
+
| style="text-align: right;" | 527.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-11-20
 
| 1993-11-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 525.5
+
| style="text-align: right;" | 525.50
| style="text-align: right;" | 527.8
+
| style="text-align: right;" | 527.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-11-23
 
| 1993-11-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 525
+
| style="text-align: right;" | 525.00
| style="text-align: right;" | 526.1
+
| style="text-align: right;" | 526.10
 
| style="text-align: right;" | 26
 
| style="text-align: right;" | 26
 
|-
 
|-
 
| 1993-11-23
 
| 1993-11-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 526.1
+
| style="text-align: right;" | 526.10
| style="text-align: right;" | 526.4
+
| style="text-align: right;" | 526.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-02-28
 
| 1994-02-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 512
+
| style="text-align: right;" | 512.00
| style="text-align: right;" | 520
+
| style="text-align: right;" | 520.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 148: Line 248:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 181: Line 295:
 
| 1993
 
| 1993
 
| style="text-align: right;" | 744
 
| style="text-align: right;" | 744
| style="text-align: right;" | 398.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 189: Line 303:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 06:21, 12 July 2020

Well Details

Well ID: 0594231111004
Loading map...
Location: 00/11-11-059-23W4/4
Location Alias: 00/11-11-59-23 W4M
Location Alias 2: 00/11-11-059-23 W4/04
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 23
Section: 11
County/Municipality: Thorhild County
Well Name: CONOCO REDWATER 11-11-59-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0055258
License Date: 1975-10-07
License Status: Abandoned
Spud Date: 1975-10-23
Final Drill Date: 1975-10-28
Well Total Depth: 885.40 m
Surface Hole Latitude: 54.088944
Surface Hole Longitude: -113.341351

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-07 Obtained License
1975-10-27 Drill Stem Test Performed
1975-10-28 Finished Drilling
1975-10-28 Well Mode changed to Drilled and Cased
1975-10-30 Drill Stem Test Performed
1975-10-31 Drill Stem Test Performed
1975-11-01 Production Casing Operation Performed
1976-06-04 Perforation Treatment Performed - Jet Perforation
1976-06-07 Perforation Treatment Performed - Jet Perforation
1976-06-14 Perforation Treatment Performed - Jet Perforation
1993-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-12 Plug Back Performed
1993-10-13 Perforation Treatment Performed - Jet Perforation
1993-10-14 Well Began Production
1993-10-14 Well Fluid changed to Gas
1993-10-14 Well Mode changed to Flowing
1993-11-19 Perforation Treatment Performed - Jet Perforation
1993-11-20 Perforation Treatment Performed - Cement Squeeze
1993-11-23 Perforation Treatment Performed - Jet Perforation
1993-11-30 Well Fluid changed to Gas
1993-11-30 Well Mode changed to Suspended
1994-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-28 Well Abandoned
1994-02-28 Well Fluid changed to Gas
1994-02-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-04 Perforation 841.20 842.80 13
1976-06-07 Perforation 833.90 835.50 13
1976-06-14 Perforation 803.80 806.50 13
1993-10-12 Packing Device Capped w/Cement 830.00 838.00 0
1993-10-12 Packing Device Capped w/Cement 819.00 827.00 0
1993-10-12 Packing Device Capped w/Cement 790.00 798.00 0
1993-10-13 Perforation 525.50 526.10 13
1993-11-19 Perforation 527.30 527.80 13
1993-11-20 Cement Squeeze 525.50 527.80 0
1993-11-23 Perforation 525.00 526.10 26
1993-11-23 Perforation 526.10 526.40 13
1994-02-28 Packing Device Capped w/Cement 512.00 520.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 744 0.0 0.0 0.0

For data sources see[5]

References