X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0314263101002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0314263101002
 
| Well ID: 0314263101002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.69530400000002146, -113.66960899999997991 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.695304, -113.669609 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/01-31-031-26W4/2
 
| Location: 00/01-31-031-26W4/2
 +
|-
 +
| Location Alias: 00/01-31-31-26 W4M
 +
|-
 +
| Location Alias 2: 00/01-31-031-26 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 031
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 31
 +
|-
 +
| County/Municipality: [[Kneehill County,_Alberta|Kneehill County]]
 
|-
 
|-
 
| Well Name: EMBER WORKMAN 1-31-31-26
 
| Well Name: EMBER WORKMAN 1-31-31-26
 +
|-
 +
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0333068
 
|-
 
|-
 
| License Date: 2005-06-16
 
| License Date: 2005-06-16
 
|-
 
|-
| Final Drilling Date: 2005-11-24
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2005-11-23
 +
|-
 +
| Final Drill Date: 2005-11-24
 +
|-
 +
| Well Total Depth: 1094.00 m
 +
|-
 +
| Surface Hole Latitude: 51.695304
 +
|-
 +
| Surface Hole Longitude: -113.669609
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-06-16
 +
| Obtained License
 +
|-
 +
| 2005-11-23
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2005-11-24
 +
| Finished Drilling
 +
|-
 +
| 2005-11-24
 +
| Well Log Performed
 +
|-
 +
| 2005-11-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2005-11-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 2005-11-25
 +
| Rig Released
 +
|-
 +
| 2005-12-01
 +
| Well Log Performed
 +
|-
 +
| 2005-12-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-12-05
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2005-12-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-12-13
 +
| Well Log Performed
 +
|-
 +
| 2005-12-22
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-03-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-03-19
 +
| Well Log Performed
 +
|-
 +
| 2006-03-22
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-06-01
 +
| Well Began Production
 +
|-
 +
| 2006-06-01
 +
| Well Fluid changed to Gas
 
|-
 
|-
| Total Depth: 1094.0m
+
| 2006-06-01
 +
| Well Mode changed to Flowing
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2007-01-14
 +
| Well Log Performed
 
|-
 
|-
| Status: Not Applicable
+
| 2007-01-14
 +
| Well Structure changed to Commingled
 
|-
 
|-
| Well Type: Not Applicable
+
| 2007-02-11
 +
| Well Log Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2007-02-15
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Latitude: 51.69530400000002146
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -113.66960899999997991
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2005-12-03
 +
| Perforation
 +
| style="text-align: right;" | 339.00
 +
| style="text-align: right;" | 340.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2005-12-05
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 339.00
 +
| style="text-align: right;" | 340.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-12-13
 +
| Perforation
 +
| style="text-align: right;" | 215.00
 +
| style="text-align: right;" | 216.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2005-12-22
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 215.00
 +
| style="text-align: right;" | 216.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 311.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 326.20
 +
| style="text-align: right;" | 326.70
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 402.00
 +
| style="text-align: right;" | 403.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 435.40
 +
| style="text-align: right;" | 435.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 442.00
 +
| style="text-align: right;" | 443.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 538.00
 +
| style="text-align: right;" | 543.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 551.20
 +
| style="text-align: right;" | 552.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 555.00
 +
| style="text-align: right;" | 557.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 559.00
 +
| style="text-align: right;" | 560.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 564.00
 +
| style="text-align: right;" | 564.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 579.00
 +
| style="text-align: right;" | 580.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 605.50
 +
| style="text-align: right;" | 606.20
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 625.10
 +
| style="text-align: right;" | 625.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 629.20
 +
| style="text-align: right;" | 629.70
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 648.80
 +
| style="text-align: right;" | 650.30
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 652.80
 +
| style="text-align: right;" | 654.30
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 666.60
 +
| style="text-align: right;" | 667.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 686.40
 +
| style="text-align: right;" | 686.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 292.10
 +
| style="text-align: right;" | 295.10
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 698.10
 +
| style="text-align: right;" | 699.70
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 701.90
 +
| style="text-align: right;" | 702.40
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 704.30
 +
| style="text-align: right;" | 704.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 710.00
 +
| style="text-align: right;" | 711.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 716.40
 +
| style="text-align: right;" | 716.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 721.30
 +
| style="text-align: right;" | 722.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 885.00
 +
| style="text-align: right;" | 889.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 927.00
 +
| style="text-align: right;" | 929.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 201.00
 +
| style="text-align: right;" | 202.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-19
 +
| Perforation
 +
| style="text-align: right;" | 205.00
 +
| style="text-align: right;" | 208.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-22
 +
| Fracture
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 929.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-03-22
 +
| Fracture
 +
| style="text-align: right;" | 201.00
 +
| style="text-align: right;" | 208.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-02-15
 +
| Cement Squeeze
 +
| style="text-align: right;" | 201.00
 +
| style="text-align: right;" | 208.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 432
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 15:48, 11 July 2020

Well Details

Well ID: 0314263101002
Loading map...
Location: 00/01-31-031-26W4/2
Location Alias: 00/01-31-31-26 W4M
Location Alias 2: 00/01-31-031-26 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 26
Section: 31
County/Municipality: Kneehill County
Well Name: EMBER WORKMAN 1-31-31-26
Operator Name: Ember Resources Inc.
License Number: 0333068
License Date: 2005-06-16
License Status: Issued
Spud Date: 2005-11-23
Final Drill Date: 2005-11-24
Well Total Depth: 1094.00 m
Surface Hole Latitude: 51.695304
Surface Hole Longitude: -113.669609

For data sources see[1][2]

Well History

Date Event
2005-06-16 Obtained License
2005-11-23 Surface Casing Operation Performed
2005-11-24 Finished Drilling
2005-11-24 Well Log Performed
2005-11-24 Well Mode changed to Drilled and Cased
2005-11-25 Production Casing Operation Performed
2005-11-25 Rig Released
2005-12-01 Well Log Performed
2005-12-03 Perforation Treatment Performed - Jet Perforation
2005-12-05 Perforation Treatment Performed - Remedial Casing
2005-12-13 Perforation Treatment Performed - Jet Perforation
2005-12-13 Well Log Performed
2005-12-22 Perforation Treatment Performed - Remedial Casing
2006-03-19 Perforation Treatment Performed - Jet Perforation
2006-03-19 Well Log Performed
2006-03-22 Perforation Treatment Performed - Fractured
2006-06-01 Well Began Production
2006-06-01 Well Fluid changed to Gas
2006-06-01 Well Mode changed to Flowing
2007-01-14 Well Log Performed
2007-01-14 Well Structure changed to Commingled
2007-02-11 Well Log Performed
2007-02-15 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-03 Perforation 339.00 340.00 14
2005-12-05 Remedial Casing Cementing 339.00 340.00 0
2005-12-13 Perforation 215.00 216.00 14
2005-12-22 Remedial Casing Cementing 215.00 216.00 0
2006-03-19 Perforation 310.00 311.00 17
2006-03-19 Perforation 326.20 326.70 17
2006-03-19 Perforation 402.00 403.00 17
2006-03-19 Perforation 435.40 435.90 17
2006-03-19 Perforation 442.00 443.00 17
2006-03-19 Perforation 538.00 543.00 17
2006-03-19 Perforation 551.20 552.00 17
2006-03-19 Perforation 555.00 557.00 17
2006-03-19 Perforation 559.00 560.00 17
2006-03-19 Perforation 564.00 564.50 17
2006-03-19 Perforation 579.00 580.00 17
2006-03-19 Perforation 605.50 606.20 17
2006-03-19 Perforation 625.10 625.90 17
2006-03-19 Perforation 629.20 629.70 17
2006-03-19 Perforation 648.80 650.30 17
2006-03-19 Perforation 652.80 654.30 17
2006-03-19 Perforation 666.60 667.90 17
2006-03-19 Perforation 686.40 686.90 17
2006-03-19 Perforation 292.10 295.10 17
2006-03-19 Perforation 698.10 699.70 17
2006-03-19 Perforation 701.90 702.40 17
2006-03-19 Perforation 704.30 704.90 17
2006-03-19 Perforation 710.00 711.00 17
2006-03-19 Perforation 716.40 716.90 17
2006-03-19 Perforation 721.30 722.00 17
2006-03-19 Perforation 885.00 889.00 17
2006-03-19 Perforation 927.00 929.00 17
2006-03-19 Perforation 201.00 202.00 17
2006-03-19 Perforation 205.00 208.00 17
2006-03-22 Fracture 310.00 929.00 0
2006-03-22 Fracture 201.00 208.00 0
2007-02-15 Cement Squeeze 201.00 208.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 432 0.0 0.0 0.0

For data sources see[5]

References