X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0576063215002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0576063215002
 
| Well ID: 0576063215002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.971608, -118.857573 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.971608, -118.857573 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/15-32-057-06W6/2
 
| Location: 00/15-32-057-06W6/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/15-32-057-06 W6/02
 
| Location Alias 2: 00/15-32-057-06 W6/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 057
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 06
 +
|-
 +
| Section: 32
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
Line 17: Line 27:
 
| Well Name: CNRL FINDLEY 15-32-57-6
 
| Well Name: CNRL FINDLEY 15-32-57-6
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
 
| License Number: 0061703
 
| License Number: 0061703
Line 29: Line 39:
 
| Final Drill Date: 1977-09-01
 
| Final Drill Date: 1977-09-01
 
|-
 
|-
| Well Total Depth: 3886.2 m
+
| Well Total Depth: 3886.20 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.971608
 
| Surface Hole Latitude: 53.971608
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1976-12-17
 +
| Obtained License
 +
|-
 +
| 1976-12-19
 +
| Direction Drilling Operation Performed - 98
 +
|-
 +
| 1977-06-04
 +
| Well Log Performed
 +
|-
 +
| 1977-07-08
 +
| Well Log Performed
 +
|-
 +
| 1977-09-01
 +
| Finished Drilling
 +
|-
 +
| 1977-09-02
 +
| Well Log Performed
 +
|-
 +
| 1977-09-03
 +
| Well Log Performed
 +
|-
 +
| 1977-09-06
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1977-09-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-09-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-09-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1977-10-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-10-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1977-10-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1977-10-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-10-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-10-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-10-18
 +
| Well Log Performed
 +
|-
 +
| 1977-10-24
 +
| Well Log Performed
 +
|-
 +
| 1977-10-26
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1977-10-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1977-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-11-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1977-11-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-11-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1977-11-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-11-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-11-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-11-14
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1977-11-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-11-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-11-19
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-11-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1977-11-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-12-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1978-01-25
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1981-06-18
 +
| Well Log Performed
 +
|-
 +
| 2000-11-03
 +
| Well Log Performed
 +
|-
 +
| 2000-11-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-11-04
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2000-11-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-01-01
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 214:
 
|-
 
|-
 
| 1976-12-19
 
| 1976-12-19
| style="text-align: right;" | 3106
+
| style="text-align: right;" | 3106.50
 
| Conversion
 
| Conversion
 
|-
 
|-
Line 70: Line 221:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 234:
 
| 1977-09-27
 
| 1977-09-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3520.1
+
| style="text-align: right;" | 3520.10
| style="text-align: right;" | 3526.2
+
| style="text-align: right;" | 3526.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-09-30
 
| 1977-09-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3511.3
+
| style="text-align: right;" | 3511.30
| style="text-align: right;" | 3511.3
+
| style="text-align: right;" | 3511.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-10-01
 
| 1977-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3405.8
+
| style="text-align: right;" | 3405.80
| style="text-align: right;" | 3406.4
+
| style="text-align: right;" | 3406.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-10-04
 
| 1977-10-04
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3405.8
+
| style="text-align: right;" | 3405.80
| style="text-align: right;" | 3406.4
+
| style="text-align: right;" | 3406.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-10-04
 
| 1977-10-04
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3405.8
+
| style="text-align: right;" | 3405.80
| style="text-align: right;" | 3406.4
+
| style="text-align: right;" | 3406.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-10-11
 
| 1977-10-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3411
+
| style="text-align: right;" | 3411.00
| style="text-align: right;" | 3418.9
+
| style="text-align: right;" | 3418.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-10-16
 
| 1977-10-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3411
+
| style="text-align: right;" | 3411.00
| style="text-align: right;" | 3418.9
+
| style="text-align: right;" | 3418.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-10-26
 
| 1977-10-26
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3411
+
| style="text-align: right;" | 3411.00
| style="text-align: right;" | 3418.9
+
| style="text-align: right;" | 3418.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-10-30
 
| 1977-10-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3400
+
| style="text-align: right;" | 3400.00
| style="text-align: right;" | 3400
+
| style="text-align: right;" | 3400.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-10-30
 
| 1977-10-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3182.7
+
| style="text-align: right;" | 3182.70
| style="text-align: right;" | 3183.3
+
| style="text-align: right;" | 3183.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-11-01
 
| 1977-11-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3182.7
+
| style="text-align: right;" | 3182.70
| style="text-align: right;" | 3183.3
+
| style="text-align: right;" | 3183.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-11-02
 
| 1977-11-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3113.8
+
| style="text-align: right;" | 3113.80
| style="text-align: right;" | 3114.4
+
| style="text-align: right;" | 3114.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-11-03
 
| 1977-11-03
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3113.8
+
| style="text-align: right;" | 3113.80
| style="text-align: right;" | 3114.4
+
| style="text-align: right;" | 3114.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-11-08
 
| 1977-11-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3159.6
+
| style="text-align: right;" | 3159.60
| style="text-align: right;" | 3167.2
+
| style="text-align: right;" | 3167.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-11-08
 
| 1977-11-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3132.4
+
| style="text-align: right;" | 3132.40
| style="text-align: right;" | 3134
+
| style="text-align: right;" | 3134.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-11-09
 
| 1977-11-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3121.5
+
| style="text-align: right;" | 3121.50
| style="text-align: right;" | 3126
+
| style="text-align: right;" | 3126.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-11-14
 
| 1977-11-14
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3104.4
+
| style="text-align: right;" | 3104.40
| style="text-align: right;" | 3112
+
| style="text-align: right;" | 3112.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-11-14
 
| 1977-11-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3066.6
+
| style="text-align: right;" | 3066.60
| style="text-align: right;" | 3074.5
+
| style="text-align: right;" | 3074.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-11-20
 
| 1977-11-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3066.6
+
| style="text-align: right;" | 3066.60
| style="text-align: right;" | 3074.5
+
| style="text-align: right;" | 3074.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-11-21
 
| 1977-11-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3031.5
+
| style="text-align: right;" | 3031.50
| style="text-align: right;" | 3036.1
+
| style="text-align: right;" | 3036.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-11-21
 
| 1977-11-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3041.3
+
| style="text-align: right;" | 3041.30
| style="text-align: right;" | 3044.6
+
| style="text-align: right;" | 3044.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1977-12-16
 
| 1977-12-16
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3031.5
+
| style="text-align: right;" | 3031.50
| style="text-align: right;" | 3044.6
+
| style="text-align: right;" | 3044.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-11-04
 
| 2000-11-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2597
+
| style="text-align: right;" | 2597.00
| style="text-align: right;" | 2603
+
| style="text-align: right;" | 2603.00
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
|-
 
|-
 
| 2000-11-08
 
| 2000-11-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2503.5
+
| style="text-align: right;" | 2503.50
| style="text-align: right;" | 2509.5
+
| style="text-align: right;" | 2509.50
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
|-
 
|-
Line 229: Line 380:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 13:28, 11 July 2020

Well Details

Well ID: 0576063215002
Loading map...
Location: 00/15-32-057-06W6/2
Location Alias: 00/15-32-57-06 W6M
Location Alias 2: 00/15-32-057-06 W6/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 6
Range: 06
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL FINDLEY 15-32-57-6
Operator Name: Canadian Natural Resources Limited
License Number: 0061703
License Date: 1976-12-17
License Status: Suspension
Spud Date: 1976-12-19
Final Drill Date: 1977-09-01
Well Total Depth: 3886.20 m
Surface Hole Latitude: 53.971608
Surface Hole Longitude: -118.857573

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-17 Obtained License
1976-12-19 Direction Drilling Operation Performed - 98
1977-06-04 Well Log Performed
1977-07-08 Well Log Performed
1977-09-01 Finished Drilling
1977-09-02 Well Log Performed
1977-09-03 Well Log Performed
1977-09-06 Liner Casing Operation Performed
1977-09-27 Perforation Treatment Performed - Jet Perforation
1977-09-28 Drill Stem Test Performed
1977-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-01 Perforation Treatment Performed - Jet Perforation
1977-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-04 Perforation Treatment Performed - Cement Squeeze
1977-10-11 Drill Stem Test Performed
1977-10-11 Perforation Treatment Performed - Jet Perforation
1977-10-16 Perforation Treatment Performed - Jet Perforation
1977-10-18 Well Log Performed
1977-10-24 Well Log Performed
1977-10-26 Perforation Treatment Performed - Cement Squeeze
1977-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-30 Perforation Treatment Performed - Jet Perforation
1977-11-01 Perforation Treatment Performed - Cement Squeeze
1977-11-02 Perforation Treatment Performed - Jet Perforation
1977-11-03 Perforation Treatment Performed - Cement Squeeze
1977-11-08 Perforation Treatment Performed - Jet Perforation
1977-11-09 Perforation Treatment Performed - Jet Perforation
1977-11-11 Drill Stem Test Performed
1977-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-14 Perforation Treatment Performed - Jet Perforation
1977-11-16 Drill Stem Test Performed
1977-11-19 Drill Stem Test Performed
1977-11-20 Perforation Treatment Performed - Cement Squeeze
1977-11-21 Perforation Treatment Performed - Jet Perforation
1977-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-25 Well Mode changed to Drilled and Cased
1981-06-18 Well Log Performed
2000-11-03 Well Log Performed
2000-11-04 Perforation Treatment Performed - Jet Perforation
2000-11-04 Well Mode changed to Drilled and Cased
2000-11-08 Perforation Treatment Performed - Jet Perforation
2006-01-01 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1976-12-19 3106.50 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-27 Perforation 3520.10 3526.20 13
1977-09-30 Packing Device Capped w/Cement 3511.30 3511.30 0
1977-10-01 Perforation 3405.80 3406.40 13
1977-10-04 Acid Treatment 3405.80 3406.40 0
1977-10-04 Cement Squeeze 3405.80 3406.40 0
1977-10-11 Perforation 3411.00 3418.90 13
1977-10-16 Perforation 3411.00 3418.90 13
1977-10-26 Cement Squeeze 3411.00 3418.90 0
1977-10-30 Packing Device Capped w/Cement 3400.00 3400.00 0
1977-10-30 Perforation 3182.70 3183.30 13
1977-11-01 Cement Squeeze 3182.70 3183.30 0
1977-11-02 Perforation 3113.80 3114.40 13
1977-11-03 Cement Squeeze 3113.80 3114.40 0
1977-11-08 Perforation 3159.60 3167.20 13
1977-11-08 Perforation 3132.40 3134.00 13
1977-11-09 Perforation 3121.50 3126.00 13
1977-11-14 Packing Device Capped w/Cement 3104.40 3112.00 0
1977-11-14 Perforation 3066.60 3074.50 13
1977-11-20 Cement Squeeze 3066.60 3074.50 0
1977-11-21 Perforation 3031.50 3036.10 13
1977-11-21 Perforation 3041.30 3044.60 13
1977-12-16 Acid Treatment 3031.50 3044.60 0
2000-11-04 Perforation 2597.00 2603.00 16
2000-11-08 Perforation 2503.50 2509.50 16

For data sources see[5]



References