X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0565161801003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0565161801003
 
| Well ID: 0565161801003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.834687, -116.356073 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.834687, -116.356073 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/01-18-056-16W5/3
 
| Location: 00/01-18-056-16W5/3
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/01-18-056-16 W5/03
 
| Location Alias 2: 00/01-18-056-16 W5/03
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 056
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 16
 +
|-
 +
| Section: 18
 
|-
 
|-
 
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
 
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
Line 17: Line 27:
 
| Well Name: ISH GROAT 1-18-56-16
 
| Well Name: ISH GROAT 1-18-56-16
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Ish Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0114728
 
| License Number: 0114728
Line 29: Line 39:
 
| Final Drill Date: 1985-06-26
 
| Final Drill Date: 1985-06-26
 
|-
 
|-
| Well Total Depth: 3009 m
+
| Well Total Depth: 3009.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.834687
 
| Surface Hole Latitude: 53.834687
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-05-21
 +
| Obtained License
 +
|-
 +
| 1985-05-26
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-05-28
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 1985-06-11
 +
| Well Log Performed
 +
|-
 +
| 1985-06-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-06-12
 +
| Well Log Performed
 +
|-
 +
| 1985-06-24
 +
| Kick Occurred
 +
|-
 +
| 1985-06-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-06-26
 +
| Finished Drilling
 +
|-
 +
| 1985-06-26
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-06-27
 +
| Well Log Performed
 +
|-
 +
| 1985-06-29
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-06-30
 +
| Rig Released
 +
|-
 +
| 1986-01-22
 +
| Well Log Performed
 +
|-
 +
| 1986-01-24
 +
| Well Log Performed
 +
|-
 +
| 1986-01-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-01-26
 +
| Well Log Performed
 +
|-
 +
| 1986-01-29
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1986-01-29
 +
| Well Log Performed
 +
|-
 +
| 1986-01-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-02-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1994-02-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-02-27
 +
| Plug Back Performed
 +
|-
 +
| 1994-02-27
 +
| Well Log Performed
 +
|-
 +
| 1994-03-02
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-03-05
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1994-03-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-03-08
 +
| Well Log Performed
 +
|-
 +
| 1994-03-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-03-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-03-07
 +
| Well Log Performed
 +
|-
 +
| 2000-03-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2000-03-14
 +
| Well Log Performed
 +
|-
 +
| 2000-03-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-03-15
 +
| Well Log Performed
 +
|-
 +
| 2000-03-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2000-03-17
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2000-03-21
 +
| Well Log Performed
 +
|-
 +
| 2000-03-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-03-22
 +
| Well Log Performed
 +
|-
 +
| 2000-03-23
 +
| Well Log Performed
 +
|-
 +
| 2000-03-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2000-03-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-03-29
 +
| Well Log Performed
 +
|-
 +
| 2000-03-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-03-30
 +
| Well Log Performed
 +
|-
 +
| 2000-03-30
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2000-04-01
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2004-05-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2004-06-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-06-09
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 238:
 
|-
 
|-
 
| 1985-05-28
 
| 1985-05-28
| style="text-align: right;" | 536
+
| style="text-align: right;" | 536.00
 
+
| Deviate (5 - 79 degrees)
 
|-
 
|-
 
|}
 
|}
Line 70: Line 245:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 258:
 
| 1986-01-25
 
| 1986-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2948.5
+
| style="text-align: right;" | 2948.50
| style="text-align: right;" | 2949
+
| style="text-align: right;" | 2949.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-01-29
 
| 1986-01-29
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2948.5
+
| style="text-align: right;" | 2948.50
| style="text-align: right;" | 2949
+
| style="text-align: right;" | 2949.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1986-01-30
 
| 1986-01-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2942.5
+
| style="text-align: right;" | 2942.50
| style="text-align: right;" | 2944
+
| style="text-align: right;" | 2944.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-02-27
 
| 1994-02-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2899
+
| style="text-align: right;" | 2899.00
| style="text-align: right;" | 2907
+
| style="text-align: right;" | 2907.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-02-27
 
| 1994-02-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1950
+
| style="text-align: right;" | 1950.00
| style="text-align: right;" | 1951
+
| style="text-align: right;" | 1951.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1994-02-27
 
| 1994-02-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2004
+
| style="text-align: right;" | 2004.00
| style="text-align: right;" | 2205
+
| style="text-align: right;" | 2205.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1994-03-02
 
| 1994-03-02
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1950
+
| style="text-align: right;" | 1950.00
| style="text-align: right;" | 1951
+
| style="text-align: right;" | 1951.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-03-05
 
| 1994-03-05
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1950
+
| style="text-align: right;" | 1950.00
| style="text-align: right;" | 2205
+
| style="text-align: right;" | 2205.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-03-07
 
| 1994-03-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1971
+
| style="text-align: right;" | 1971.00
| style="text-align: right;" | 1975
+
| style="text-align: right;" | 1975.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1994-03-10
 
| 1994-03-10
| Fracture  
+
| Fracture
| style="text-align: right;" | 1971
+
| style="text-align: right;" | 1971.00
| style="text-align: right;" | 1975
+
| style="text-align: right;" | 1975.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-03-07
 
| 2000-03-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1617
+
| style="text-align: right;" | 1617.00
| style="text-align: right;" | 1618
+
| style="text-align: right;" | 1618.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2000-03-07
 
| 2000-03-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1552
+
| style="text-align: right;" | 1552.00
| style="text-align: right;" | 1553
+
| style="text-align: right;" | 1553.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2000-03-09
 
| 2000-03-09
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1552
+
| style="text-align: right;" | 1552.00
| style="text-align: right;" | 1618
+
| style="text-align: right;" | 1618.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-03-15
 
| 2000-03-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1607
+
| style="text-align: right;" | 1607.00
| style="text-align: right;" | 1608
+
| style="text-align: right;" | 1608.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2000-03-15
 
| 2000-03-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1556
+
| style="text-align: right;" | 1556.00
| style="text-align: right;" | 1557
+
| style="text-align: right;" | 1557.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2000-03-16
 
| 2000-03-16
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1556
+
| style="text-align: right;" | 1556.00
| style="text-align: right;" | 1608
+
| style="text-align: right;" | 1608.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-03-17
 
| 2000-03-17
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1556
+
| style="text-align: right;" | 1556.00
| style="text-align: right;" | 1608
+
| style="text-align: right;" | 1608.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-03-22
 
| 2000-03-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1600
+
| style="text-align: right;" | 1600.00
| style="text-align: right;" | 1601
+
| style="text-align: right;" | 1601.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2000-03-22
 
| 2000-03-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1572.5
+
| style="text-align: right;" | 1572.50
| style="text-align: right;" | 1573.5
+
| style="text-align: right;" | 1573.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2000-03-27
 
| 2000-03-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1564.5
+
| style="text-align: right;" | 1564.50
| style="text-align: right;" | 1565.5
+
| style="text-align: right;" | 1565.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2000-03-27
 
| 2000-03-27
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1564.5
+
| style="text-align: right;" | 1564.50
| style="text-align: right;" | 1601
+
| style="text-align: right;" | 1601.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-03-30
 
| 2000-03-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1583
+
| style="text-align: right;" | 1583.00
| style="text-align: right;" | 1587
+
| style="text-align: right;" | 1587.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2000-04-01
 
| 2000-04-01
| Fracture  
+
| Fracture
| style="text-align: right;" | 1583
+
| style="text-align: right;" | 1583.00
| style="text-align: right;" | 1587
+
| style="text-align: right;" | 1587.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-05-21
 
| 2004-05-21
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1583
+
| style="text-align: right;" | 1583.00
| style="text-align: right;" | 1587
+
| style="text-align: right;" | 1587.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-06-09
 
| 2004-06-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1971
+
| style="text-align: right;" | 1971.00
| style="text-align: right;" | 1975
+
| style="text-align: right;" | 1975.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
Line 235: Line 410:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 281: Line 470:
 
|-
 
|-
 
| 2004-05-26
 
| 2004-05-26
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2004-05-30
 
| 2004-05-30
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2004-06-02
 
| 2004-06-02
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2004-06-07
 
| 2004-06-07
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 304: Line 493:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 14:28, 10 July 2020

Well Details

Well ID: 0565161801003
Loading map...
Location: 00/01-18-056-16W5/3
Location Alias: 00/01-18-56-16 W5M
Location Alias 2: 00/01-18-056-16 W5/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 16
Section: 18
County/Municipality: Yellowhead County
Well Name: ISH GROAT 1-18-56-16
Operator Name: Ish Energy Ltd.
License Number: 0114728
License Date: 1985-05-21
License Status: Issued
Spud Date: 1985-05-24
Final Drill Date: 1985-06-26
Well Total Depth: 3009.00 m
Surface Hole Latitude: 53.834687
Surface Hole Longitude: -116.356073

For data sources see[1][2]

Well History

Date Event
1985-05-21 Obtained License
1985-05-26 Surface Casing Operation Performed
1985-05-28 Direction Drilling Operation Performed - Deviate
1985-06-11 Well Log Performed
1985-06-12 Drill Stem Test Performed
1985-06-12 Well Log Performed
1985-06-24 Kick Occurred
1985-06-25 Drill Stem Test Performed
1985-06-26 Finished Drilling
1985-06-26 Well Mode changed to Drilled and Cased
1985-06-27 Well Log Performed
1985-06-29 Production Casing Operation Performed
1985-06-30 Rig Released
1986-01-22 Well Log Performed
1986-01-24 Well Log Performed
1986-01-25 Perforation Treatment Performed - Jet Perforation
1986-01-26 Well Log Performed
1986-01-29 Perforation Treatment Performed - Cement Squeeze
1986-01-29 Well Log Performed
1986-01-30 Perforation Treatment Performed - Jet Perforation
1994-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Plug Back Performed
1994-02-27 Well Log Performed
1994-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-05 Perforation Treatment Performed - Remedial Casing
1994-03-07 Perforation Treatment Performed - Jet Perforation
1994-03-08 Well Log Performed
1994-03-10 Perforation Treatment Performed - Fractured
2000-03-07 Perforation Treatment Performed - Jet Perforation
2000-03-07 Well Log Performed
2000-03-09 Perforation Treatment Performed - Cement Squeeze
2000-03-14 Well Log Performed
2000-03-15 Perforation Treatment Performed - Jet Perforation
2000-03-15 Well Log Performed
2000-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-17 Perforation Treatment Performed - Cement Squeeze
2000-03-21 Well Log Performed
2000-03-22 Perforation Treatment Performed - Jet Perforation
2000-03-22 Well Log Performed
2000-03-23 Well Log Performed
2000-03-27 Perforation Treatment Performed - Cement Squeeze
2000-03-27 Perforation Treatment Performed - Jet Perforation
2000-03-29 Well Log Performed
2000-03-30 Perforation Treatment Performed - Jet Perforation
2000-03-30 Well Log Performed
2000-03-30 Well Mode changed to Drilled and Cased
2000-04-01 Perforation Treatment Performed - Fractured
2004-05-21 Perforation Treatment Performed - Cement Squeeze
2004-06-09 Perforation Treatment Performed - Jet Perforation
2004-06-09 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-05-28 536.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-25 Perforation 2948.50 2949.00 13
1986-01-29 Cement Squeeze 2948.50 2949.00 0
1986-01-30 Perforation 2942.50 2944.00 13
1994-02-27 Packing Device Capped w/Cement 2899.00 2907.00 0
1994-02-27 Perforation 1950.00 1951.00 14
1994-02-27 Perforation 2004.00 2205.00 14
1994-03-02 Acid Treatment 1950.00 1951.00 0
1994-03-05 Remedial Casing Cementing 1950.00 2205.00 0
1994-03-07 Perforation 1971.00 1975.00 14
1994-03-10 Fracture 1971.00 1975.00 0
2000-03-07 Perforation 1617.00 1618.00 14
2000-03-07 Perforation 1552.00 1553.00 14
2000-03-09 Cement Squeeze 1552.00 1618.00 0
2000-03-15 Perforation 1607.00 1608.00 14
2000-03-15 Perforation 1556.00 1557.00 14
2000-03-16 Acid Treatment 1556.00 1608.00 0
2000-03-17 Cement Squeeze 1556.00 1608.00 0
2000-03-22 Perforation 1600.00 1601.00 17
2000-03-22 Perforation 1572.50 1573.50 17
2000-03-27 Perforation 1564.50 1565.50 17
2000-03-27 Cement Squeeze 1564.50 1601.00 0
2000-03-30 Perforation 1583.00 1587.00 14
2000-04-01 Fracture 1583.00 1587.00 0
2004-05-21 Cement Squeeze 1583.00 1587.00 0
2004-06-09 Perforation 1971.00 1975.00 17

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-06-24 Kick 2963.00 2963.00
2004-05-26 No Incident Encountered 0.00 0.00
2004-05-30 No Incident Encountered 0.00 0.00
2004-06-02 No Incident Encountered 0.00 0.00
2004-06-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References