X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0565082307020"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0565082307020
 
| Well ID: 0565082307020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.851346, -115.077235 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.851346, -115.077235 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/07-23-056-08W5/0
 
| Location: 02/07-23-056-08W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/07-23-056-08 W5/00
 
| Location Alias 2: 02/07-23-056-08 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 056
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 08
 +
|-
 +
| Section: 23
 
|-
 
|-
 
| County/Municipality: [[Lac Ste. Anne County,_Alberta|Lac Ste. Anne County]]
 
| County/Municipality: [[Lac Ste. Anne County,_Alberta|Lac Ste. Anne County]]
Line 17: Line 27:
 
| Well Name: RSX 102 PADDLER 7-23-56-8
 
| Well Name: RSX 102 PADDLER 7-23-56-8
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Repsol Oil & Gas Canada Inc.]]
 
|-
 
|-
 
| License Number: 0361035
 
| License Number: 0361035
Line 29: Line 39:
 
| Final Drill Date: 2006-09-10
 
| Final Drill Date: 2006-09-10
 
|-
 
|-
| Well Total Depth: 1570 m
+
| Well Total Depth: 1570.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.851346
 
| Surface Hole Latitude: 53.851346
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-08-01
 +
| Obtained License
 +
|-
 +
| 2006-09-05
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2006-09-10
 +
| Finished Drilling
 +
|-
 +
| 2006-09-10
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2006-09-11
 +
| Well Log Performed
 +
|-
 +
| 2006-09-12
 +
| Production Casing Operation Performed
 +
|-
 +
| 2006-09-12
 +
| Rig Released
 +
|-
 +
| 2006-09-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-10-01
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-11-08
 +
| Well Began Production
 +
|-
 +
| 2006-11-08
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2006-11-08
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2006-12-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2006-12-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2009-06-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-07-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-07-13
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-10-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-17
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-10-21
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-10-21
 +
| Plug Back Performed
 +
|-
 +
| 2009-10-21
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2009-10-21
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2009-10-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-22
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-10-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-28
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-11-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-11-14
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-11-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-11-17
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-11-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-11-23
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-11-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-11-26
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-11-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-11-28
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2009-12-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-12-17
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-01-13
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-01-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-01-20
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-02-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-02-13
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-02-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-02-20
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-03-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-03-18
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-03-23
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-03-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-03-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-04-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-04-06
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-04-17
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-04-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-04-20
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-05-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-05-06
 +
| Well Log Performed
 +
|-
 +
| 2010-05-07
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-05-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-05-08
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-05-10
 +
| Well Log Performed
 +
|-
 +
| 2010-05-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-05-11
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-05-13
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-05-14
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-05-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-05-26
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-05-27
 +
| Well Log Performed
 +
|-
 +
| 2010-05-28
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-06-02
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-06-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-06-07
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-06-07
 +
| Well Log Performed
 +
|-
 +
| 2010-06-08
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-06-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-06-11
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-06-11
 +
| Well Log Performed
 +
|-
 +
| 2010-06-12
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2010-07-11
 +
| Well Abandoned
 +
|-
 +
| 2010-07-11
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2010-07-11
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 345:
 
| 2006-09-30
 
| 2006-09-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1518
+
| style="text-align: right;" | 1518.00
| style="text-align: right;" | 1520
+
| style="text-align: right;" | 1520.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-09-30
 
| 2006-09-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1504
+
| style="text-align: right;" | 1504.00
| style="text-align: right;" | 1508
+
| style="text-align: right;" | 1508.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-10-01
 
| 2006-10-01
| Fracture  
+
| Fracture
| style="text-align: right;" | 1518
+
| style="text-align: right;" | 1518.00
| style="text-align: right;" | 1520
+
| style="text-align: right;" | 1520.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-10-01
 
| 2006-10-01
| Fracture  
+
| Fracture
| style="text-align: right;" | 1504
+
| style="text-align: right;" | 1504.00
| style="text-align: right;" | 1508
+
| style="text-align: right;" | 1508.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-06-24
 
| 2009-06-24
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1518
+
| style="text-align: right;" | 1518.00
| style="text-align: right;" | 1520
+
| style="text-align: right;" | 1520.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-06-24
 
| 2009-06-24
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1504
+
| style="text-align: right;" | 1504.00
| style="text-align: right;" | 1508
+
| style="text-align: right;" | 1508.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-13
 
| 2009-07-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1496.5
+
| style="text-align: right;" | 1496.50
| style="text-align: right;" | 1497
+
| style="text-align: right;" | 1497.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 2009-07-13
 
| 2009-07-13
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1496.5
+
| style="text-align: right;" | 1496.50
| style="text-align: right;" | 1497
+
| style="text-align: right;" | 1497.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-10-17
 
| 2009-10-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1553.1
+
| style="text-align: right;" | 1553.10
| style="text-align: right;" | 1556.1
+
| style="text-align: right;" | 1556.10
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-10-17
 
| 2009-10-17
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1553.1
+
| style="text-align: right;" | 1553.10
| style="text-align: right;" | 1556.1
+
| style="text-align: right;" | 1556.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-10-21
 
| 2009-10-21
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1496
+
| style="text-align: right;" | 1496.00
| style="text-align: right;" | 1564.6
+
| style="text-align: right;" | 1564.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-10-22
 
| 2009-10-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1296
+
| style="text-align: right;" | 1296.00
| style="text-align: right;" | 1299
+
| style="text-align: right;" | 1299.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-10-22
 
| 2009-10-22
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1296
+
| style="text-align: right;" | 1296.00
| style="text-align: right;" | 1299
+
| style="text-align: right;" | 1299.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-10-28
 
| 2009-10-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1122.5
+
| style="text-align: right;" | 1122.50
| style="text-align: right;" | 1125.5
+
| style="text-align: right;" | 1125.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-10-28
 
| 2009-10-28
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1122.5
+
| style="text-align: right;" | 1122.50
| style="text-align: right;" | 1125.5
+
| style="text-align: right;" | 1125.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-14
 
| 2009-11-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1504.5
+
| style="text-align: right;" | 1504.50
| style="text-align: right;" | 1508
+
| style="text-align: right;" | 1508.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-11-14
 
| 2009-11-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1504.5
+
| style="text-align: right;" | 1504.50
| style="text-align: right;" | 1505
+
| style="text-align: right;" | 1505.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-14
 
| 2009-11-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1531.5
+
| style="text-align: right;" | 1531.50
| style="text-align: right;" | 1532
+
| style="text-align: right;" | 1532.00
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 2009-11-14
 
| 2009-11-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1531.5
+
| style="text-align: right;" | 1531.50
| style="text-align: right;" | 1532
+
| style="text-align: right;" | 1532.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-14
 
| 2009-11-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1535
+
| style="text-align: right;" | 1535.00
| style="text-align: right;" | 1535.5
+
| style="text-align: right;" | 1535.50
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 2009-11-14
 
| 2009-11-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1535
+
| style="text-align: right;" | 1535.00
| style="text-align: right;" | 1535.1
+
| style="text-align: right;" | 1535.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1415
+
| style="text-align: right;" | 1415.00
| style="text-align: right;" | 1415.1
+
| style="text-align: right;" | 1415.10
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1415
+
| style="text-align: right;" | 1415.00
| style="text-align: right;" | 1415.1
+
| style="text-align: right;" | 1415.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1260
+
| style="text-align: right;" | 1260.00
| style="text-align: right;" | 1260.5
+
| style="text-align: right;" | 1260.50
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1260
+
| style="text-align: right;" | 1260.00
| style="text-align: right;" | 1260.5
+
| style="text-align: right;" | 1260.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1282
+
| style="text-align: right;" | 1282.00
| style="text-align: right;" | 1282.5
+
| style="text-align: right;" | 1282.50
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1282
+
| style="text-align: right;" | 1282.00
| style="text-align: right;" | 1282.5
+
| style="text-align: right;" | 1282.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1295
+
| style="text-align: right;" | 1295.00
| style="text-align: right;" | 1295.1
+
| style="text-align: right;" | 1295.10
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 2009-11-17
 
| 2009-11-17
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1295
+
| style="text-align: right;" | 1295.00
| style="text-align: right;" | 1295.1
+
| style="text-align: right;" | 1295.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-23
 
| 2009-11-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 874
+
| style="text-align: right;" | 874.00
| style="text-align: right;" | 874.2
+
| style="text-align: right;" | 874.20
 
| style="text-align: right;" | 40
 
| style="text-align: right;" | 40
 
|-
 
|-
 
| 2009-11-23
 
| 2009-11-23
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 874
+
| style="text-align: right;" | 874.00
| style="text-align: right;" | 874.2
+
| style="text-align: right;" | 874.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-23
 
| 2009-11-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 942
+
| style="text-align: right;" | 942.00
| style="text-align: right;" | 942.2
+
| style="text-align: right;" | 942.20
 
| style="text-align: right;" | 40
 
| style="text-align: right;" | 40
 
|-
 
|-
 
| 2009-11-23
 
| 2009-11-23
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 942
+
| style="text-align: right;" | 942.00
| style="text-align: right;" | 942.2
+
| style="text-align: right;" | 942.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-26
 
| 2009-11-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 426
+
| style="text-align: right;" | 426.00
| style="text-align: right;" | 426.9
+
| style="text-align: right;" | 426.90
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 2009-11-26
 
| 2009-11-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 426
+
| style="text-align: right;" | 426.00
| style="text-align: right;" | 426.9
+
| style="text-align: right;" | 426.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-26
 
| 2009-11-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 450
+
| style="text-align: right;" | 450.00
| style="text-align: right;" | 450.9
+
| style="text-align: right;" | 450.90
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 
|-
 
|-
 
| 2009-11-26
 
| 2009-11-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 450
+
| style="text-align: right;" | 450.00
| style="text-align: right;" | 450.9
+
| style="text-align: right;" | 450.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-11-28
 
| 2009-11-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 348
+
| style="text-align: right;" | 348.00
| style="text-align: right;" | 349
+
| style="text-align: right;" | 349.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-11-28
 
| 2009-11-28
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 348
+
| style="text-align: right;" | 348.00
| style="text-align: right;" | 349
+
| style="text-align: right;" | 349.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-12-17
 
| 2009-12-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1435
+
| style="text-align: right;" | 1435.00
| style="text-align: right;" | 1435.5
+
| style="text-align: right;" | 1435.50
 
| style="text-align: right;" | 34
 
| style="text-align: right;" | 34
 
|-
 
|-
 
| 2009-12-17
 
| 2009-12-17
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1435
+
| style="text-align: right;" | 1435.00
| style="text-align: right;" | 1435.5
+
| style="text-align: right;" | 1435.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-01-13
 
| 2010-01-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1303
+
| style="text-align: right;" | 1303.00
| style="text-align: right;" | 1303.5
+
| style="text-align: right;" | 1303.50
 
| style="text-align: right;" | 34
 
| style="text-align: right;" | 34
 
|-
 
|-
 
| 2010-01-13
 
| 2010-01-13
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1303
+
| style="text-align: right;" | 1303.00
| style="text-align: right;" | 1303.5
+
| style="text-align: right;" | 1303.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-01-20
 
| 2010-01-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1231
+
| style="text-align: right;" | 1231.00
| style="text-align: right;" | 1231.5
+
| style="text-align: right;" | 1231.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-01-20
 
| 2010-01-20
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1231
+
| style="text-align: right;" | 1231.00
| style="text-align: right;" | 1231.5
+
| style="text-align: right;" | 1231.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-01-20
 
| 2010-01-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1230.3
+
| style="text-align: right;" | 1230.30
| style="text-align: right;" | 1230.7
+
| style="text-align: right;" | 1230.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-01-20
 
| 2010-01-20
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1230.3
+
| style="text-align: right;" | 1230.30
| style="text-align: right;" | 1230.7
+
| style="text-align: right;" | 1230.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-02-13
 
| 2010-02-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1560.5
+
| style="text-align: right;" | 1560.50
| style="text-align: right;" | 1561
+
| style="text-align: right;" | 1561.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-02-13
 
| 2010-02-13
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1560.5
+
| style="text-align: right;" | 1560.50
| style="text-align: right;" | 1561
+
| style="text-align: right;" | 1561.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-02-20
 
| 2010-02-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 451.1
+
| style="text-align: right;" | 451.10
| style="text-align: right;" | 451.5
+
| style="text-align: right;" | 451.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-02-20
 
| 2010-02-20
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 451.1
+
| style="text-align: right;" | 451.10
| style="text-align: right;" | 451.5
+
| style="text-align: right;" | 451.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-02-20
 
| 2010-02-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 426.1
+
| style="text-align: right;" | 426.10
| style="text-align: right;" | 426.5
+
| style="text-align: right;" | 426.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-02-20
 
| 2010-02-20
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 426.1
+
| style="text-align: right;" | 426.10
| style="text-align: right;" | 426.5
+
| style="text-align: right;" | 426.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-03-18
 
| 2010-03-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1282
+
| style="text-align: right;" | 1282.00
| style="text-align: right;" | 1286
+
| style="text-align: right;" | 1286.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-03-18
 
| 2010-03-18
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1282
+
| style="text-align: right;" | 1282.00
| style="text-align: right;" | 1286
+
| style="text-align: right;" | 1286.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-03-23
 
| 2010-03-23
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1212.6
+
| style="text-align: right;" | 1212.60
| style="text-align: right;" | 1229
+
| style="text-align: right;" | 1229.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-03-29
 
| 2010-03-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 475
+
| style="text-align: right;" | 475.00
| style="text-align: right;" | 478
+
| style="text-align: right;" | 478.00
 
| style="text-align: right;" | 8
 
| style="text-align: right;" | 8
 
|-
 
|-
 
| 2010-03-29
 
| 2010-03-29
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 475
+
| style="text-align: right;" | 475.00
| style="text-align: right;" | 478
+
| style="text-align: right;" | 478.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-04-06
 
| 2010-04-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 357
+
| style="text-align: right;" | 357.00
| style="text-align: right;" | 359
+
| style="text-align: right;" | 359.00
 
| style="text-align: right;" | 8
 
| style="text-align: right;" | 8
 
|-
 
|-
 
| 2010-04-06
 
| 2010-04-06
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 357
+
| style="text-align: right;" | 357.00
| style="text-align: right;" | 359
+
| style="text-align: right;" | 359.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-04-06
 
| 2010-04-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 365
+
| style="text-align: right;" | 365.00
| style="text-align: right;" | 367
+
| style="text-align: right;" | 367.00
 
| style="text-align: right;" | 8
 
| style="text-align: right;" | 8
 
|-
 
|-
 
| 2010-04-06
 
| 2010-04-06
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 365
+
| style="text-align: right;" | 365.00
| style="text-align: right;" | 367
+
| style="text-align: right;" | 367.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-04-17
 
| 2010-04-17
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1014.2
+
| style="text-align: right;" | 1014.20
| style="text-align: right;" | 1022
+
| style="text-align: right;" | 1022.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-04-17
 
| 2010-04-17
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1004
+
| style="text-align: right;" | 1004.00
| style="text-align: right;" | 1013.7
+
| style="text-align: right;" | 1013.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-04-20
 
| 2010-04-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-04-20
 
| 2010-04-20
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-06
 
| 2010-05-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 741.8
+
| style="text-align: right;" | 741.80
| style="text-align: right;" | 749.8
+
| style="text-align: right;" | 749.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-07
 
| 2010-05-07
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 675
+
| style="text-align: right;" | 675.00
| style="text-align: right;" | 686.2
+
| style="text-align: right;" | 686.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-08
 
| 2010-05-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-05-08
 
| 2010-05-08
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-11
 
| 2010-05-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 601
+
| style="text-align: right;" | 601.00
| style="text-align: right;" | 607.5
+
| style="text-align: right;" | 607.50
 
| style="text-align: right;" | 99
 
| style="text-align: right;" | 99
 
|-
 
|-
 
| 2010-05-11
 
| 2010-05-11
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 601
+
| style="text-align: right;" | 601.00
| style="text-align: right;" | 607.5
+
| style="text-align: right;" | 607.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-13
 
| 2010-05-13
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 594.6
+
| style="text-align: right;" | 594.60
| style="text-align: right;" | 609
+
| style="text-align: right;" | 609.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-14
 
| 2010-05-14
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 585
+
| style="text-align: right;" | 585.00
| style="text-align: right;" | 593.2
+
| style="text-align: right;" | 593.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-26
 
| 2010-05-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 559
+
| style="text-align: right;" | 559.00
| style="text-align: right;" | 562
+
| style="text-align: right;" | 562.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-05-26
 
| 2010-05-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 559
+
| style="text-align: right;" | 559.00
| style="text-align: right;" | 562
+
| style="text-align: right;" | 562.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-26
 
| 2010-05-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 524
+
| style="text-align: right;" | 524.00
| style="text-align: right;" | 527
+
| style="text-align: right;" | 527.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-05-26
 
| 2010-05-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 524
+
| style="text-align: right;" | 524.00
| style="text-align: right;" | 527
+
| style="text-align: right;" | 527.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-26
 
| 2010-05-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 539
+
| style="text-align: right;" | 539.00
| style="text-align: right;" | 542
+
| style="text-align: right;" | 542.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-05-26
 
| 2010-05-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 539
+
| style="text-align: right;" | 539.00
| style="text-align: right;" | 542
+
| style="text-align: right;" | 542.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-28
 
| 2010-05-28
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 539.5
+
| style="text-align: right;" | 539.50
| style="text-align: right;" | 563
+
| style="text-align: right;" | 563.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-05-28
 
| 2010-05-28
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 534.8
+
| style="text-align: right;" | 534.80
| style="text-align: right;" | 535.8
+
| style="text-align: right;" | 535.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-02
 
| 2010-06-02
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 518.5
+
| style="text-align: right;" | 518.50
| style="text-align: right;" | 528
+
| style="text-align: right;" | 528.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-02
 
| 2010-06-02
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 508
+
| style="text-align: right;" | 508.00
| style="text-align: right;" | 517.8
+
| style="text-align: right;" | 517.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-07
 
| 2010-06-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 473
+
| style="text-align: right;" | 473.00
| style="text-align: right;" | 476
+
| style="text-align: right;" | 476.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-06-07
 
| 2010-06-07
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 473
+
| style="text-align: right;" | 473.00
| style="text-align: right;" | 476
+
| style="text-align: right;" | 476.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-07
 
| 2010-06-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 476
+
| style="text-align: right;" | 476.00
| style="text-align: right;" | 479
+
| style="text-align: right;" | 479.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-06-07
 
| 2010-06-07
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 476
+
| style="text-align: right;" | 476.00
| style="text-align: right;" | 479
+
| style="text-align: right;" | 479.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-08
 
| 2010-06-08
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 468.8
+
| style="text-align: right;" | 468.80
| style="text-align: right;" | 480
+
| style="text-align: right;" | 480.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-08
 
| 2010-06-08
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 459
+
| style="text-align: right;" | 459.00
| style="text-align: right;" | 468
+
| style="text-align: right;" | 468.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-11
 
| 2010-06-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 310
+
| style="text-align: right;" | 310.00
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-06-11
 
| 2010-06-11
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 310
+
| style="text-align: right;" | 310.00
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-11
 
| 2010-06-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
| style="text-align: right;" | 315
+
| style="text-align: right;" | 315.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-06-11
 
| 2010-06-11
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
| style="text-align: right;" | 315
+
| style="text-align: right;" | 315.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-12
 
| 2010-06-12
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 306.2
+
| style="text-align: right;" | 306.20
| style="text-align: right;" | 316
+
| style="text-align: right;" | 316.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-06-12
 
| 2010-06-12
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 297
+
| style="text-align: right;" | 297.00
| style="text-align: right;" | 305.8
+
| style="text-align: right;" | 305.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 652: Line 923:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 685: Line 970:
 
| 2006
 
| 2006
 
| style="text-align: right;" | 159
 
| style="text-align: right;" | 159
| style="text-align: right;" | 18.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 113.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 693: Line 978:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 13:30, 10 July 2020

Well Details

Well ID: 0565082307020
Loading map...
Location: 02/07-23-056-08W5/0
Location Alias: 02/07-23-56-08 W5M
Location Alias 2: 02/07-23-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 23
County/Municipality: Lac Ste. Anne County
Well Name: RSX 102 PADDLER 7-23-56-8
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0361035
License Date: 2006-08-01
License Status: Abandoned
Spud Date: 2006-09-03
Final Drill Date: 2006-09-10
Well Total Depth: 1570.00 m
Surface Hole Latitude: 53.851346
Surface Hole Longitude: -115.077235

For data sources see[1][2]

Well History

Date Event
2006-08-01 Obtained License
2006-09-05 Surface Casing Operation Performed
2006-09-10 Finished Drilling
2006-09-10 Well Mode changed to Drilled and Cased
2006-09-11 Well Log Performed
2006-09-12 Production Casing Operation Performed
2006-09-12 Rig Released
2006-09-30 Perforation Treatment Performed - Jet Perforation
2006-10-01 Perforation Treatment Performed - Fractured
2006-11-08 Well Began Production
2006-11-08 Well Fluid changed to Crude Oil
2006-11-08 Well Mode changed to Pumping
2006-12-01 Well Fluid changed to Crude Oil
2006-12-01 Well Mode changed to Suspended
2009-06-24 Perforation Treatment Performed - Cement Squeeze
2009-07-13 Perforation Treatment Performed - Jet Perforation
2009-07-13 Perforation Treatment Performed - Remedial Casing
2009-10-17 Perforation Treatment Performed - Jet Perforation
2009-10-17 Perforation Treatment Performed - Remedial Casing
2009-10-21 Perforation Treatment Performed - Cement Plug
2009-10-21 Plug Back Performed
2009-10-21 Well Fluid changed to Crude Oil
2009-10-21 Well Mode changed to Abandoned Zone
2009-10-22 Perforation Treatment Performed - Jet Perforation
2009-10-22 Perforation Treatment Performed - Remedial Casing
2009-10-28 Perforation Treatment Performed - Jet Perforation
2009-10-28 Perforation Treatment Performed - Remedial Casing
2009-11-14 Perforation Treatment Performed - Jet Perforation
2009-11-14 Perforation Treatment Performed - Remedial Casing
2009-11-17 Perforation Treatment Performed - Jet Perforation
2009-11-17 Perforation Treatment Performed - Remedial Casing
2009-11-23 Perforation Treatment Performed - Jet Perforation
2009-11-23 Perforation Treatment Performed - Remedial Casing
2009-11-26 Perforation Treatment Performed - Jet Perforation
2009-11-26 Perforation Treatment Performed - Remedial Casing
2009-11-28 Perforation Treatment Performed - Jet Perforation
2009-11-28 Perforation Treatment Performed - Remedial Casing
2009-12-17 Perforation Treatment Performed - Jet Perforation
2009-12-17 Perforation Treatment Performed - Remedial Casing
2010-01-13 Perforation Treatment Performed - Jet Perforation
2010-01-13 Perforation Treatment Performed - Remedial Casing
2010-01-20 Perforation Treatment Performed - Jet Perforation
2010-01-20 Perforation Treatment Performed - Remedial Casing
2010-02-13 Perforation Treatment Performed - Jet Perforation
2010-02-13 Perforation Treatment Performed - Remedial Casing
2010-02-20 Perforation Treatment Performed - Jet Perforation
2010-02-20 Perforation Treatment Performed - Remedial Casing
2010-03-18 Perforation Treatment Performed - Jet Perforation
2010-03-18 Perforation Treatment Performed - Remedial Casing
2010-03-23 Perforation Treatment Performed - Cement Plug
2010-03-29 Perforation Treatment Performed - Jet Perforation
2010-03-29 Perforation Treatment Performed - Remedial Casing
2010-04-06 Perforation Treatment Performed - Jet Perforation
2010-04-06 Perforation Treatment Performed - Remedial Casing
2010-04-17 Perforation Treatment Performed - Cement Plug
2010-04-20 Perforation Treatment Performed - Jet Perforation
2010-04-20 Perforation Treatment Performed - Remedial Casing
2010-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-06 Well Log Performed
2010-05-07 Perforation Treatment Performed - Cement Plug
2010-05-08 Perforation Treatment Performed - Jet Perforation
2010-05-08 Perforation Treatment Performed - Remedial Casing
2010-05-10 Well Log Performed
2010-05-11 Perforation Treatment Performed - Jet Perforation
2010-05-11 Perforation Treatment Performed - Remedial Casing
2010-05-13 Perforation Treatment Performed - Cement Plug
2010-05-14 Perforation Treatment Performed - Cement Plug
2010-05-26 Perforation Treatment Performed - Jet Perforation
2010-05-26 Perforation Treatment Performed - Remedial Casing
2010-05-27 Well Log Performed
2010-05-28 Perforation Treatment Performed - Cement Plug
2010-06-02 Perforation Treatment Performed - Cement Plug
2010-06-07 Perforation Treatment Performed - Jet Perforation
2010-06-07 Perforation Treatment Performed - Remedial Casing
2010-06-07 Well Log Performed
2010-06-08 Perforation Treatment Performed - Cement Plug
2010-06-11 Perforation Treatment Performed - Jet Perforation
2010-06-11 Perforation Treatment Performed - Remedial Casing
2010-06-11 Well Log Performed
2010-06-12 Perforation Treatment Performed - Cement Plug
2010-07-11 Well Abandoned
2010-07-11 Well Fluid changed to Crude Oil
2010-07-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-09-30 Perforation 1518.00 1520.00 17
2006-09-30 Perforation 1504.00 1508.00 17
2006-10-01 Fracture 1518.00 1520.00 0
2006-10-01 Fracture 1504.00 1508.00 0
2009-06-24 Cement Squeeze 1518.00 1520.00 0
2009-06-24 Cement Squeeze 1504.00 1508.00 0
2009-07-13 Perforation 1496.50 1497.00 18
2009-07-13 Remedial Casing Cementing 1496.50 1497.00 0
2009-10-17 Perforation 1553.10 1556.10 17
2009-10-17 Remedial Casing Cementing 1553.10 1556.10 0
2009-10-21 Cement Plug 1496.00 1564.60 0
2009-10-22 Perforation 1296.00 1299.00 17
2009-10-22 Remedial Casing Cementing 1296.00 1299.00 0
2009-10-28 Perforation 1122.50 1125.50 17
2009-10-28 Remedial Casing Cementing 1122.50 1125.50 0
2009-11-14 Perforation 1504.50 1508.00 17
2009-11-14 Remedial Casing Cementing 1504.50 1505.00 0
2009-11-14 Perforation 1531.50 1532.00 12
2009-11-14 Remedial Casing Cementing 1531.50 1532.00 0
2009-11-14 Perforation 1535.00 1535.50 12
2009-11-14 Remedial Casing Cementing 1535.00 1535.10 0
2009-11-17 Perforation 1415.00 1415.10 17
2009-11-17 Remedial Casing Cementing 1415.00 1415.10 0
2009-11-17 Perforation 1260.00 1260.50 12
2009-11-17 Remedial Casing Cementing 1260.00 1260.50 0
2009-11-17 Perforation 1282.00 1282.50 12
2009-11-17 Remedial Casing Cementing 1282.00 1282.50 0
2009-11-17 Perforation 1295.00 1295.10 12
2009-11-17 Remedial Casing Cementing 1295.00 1295.10 0
2009-11-23 Perforation 874.00 874.20 40
2009-11-23 Remedial Casing Cementing 874.00 874.20 0
2009-11-23 Perforation 942.00 942.20 40
2009-11-23 Remedial Casing Cementing 942.00 942.20 0
2009-11-26 Perforation 426.00 426.90 12
2009-11-26 Remedial Casing Cementing 426.00 426.90 0
2009-11-26 Perforation 450.00 450.90 12
2009-11-26 Remedial Casing Cementing 450.00 450.90 0
2009-11-28 Perforation 348.00 349.00 17
2009-11-28 Remedial Casing Cementing 348.00 349.00 0
2009-12-17 Perforation 1435.00 1435.50 34
2009-12-17 Remedial Casing Cementing 1435.00 1435.50 0
2010-01-13 Perforation 1303.00 1303.50 34
2010-01-13 Remedial Casing Cementing 1303.00 1303.50 0
2010-01-20 Perforation 1231.00 1231.50 17
2010-01-20 Remedial Casing Cementing 1231.00 1231.50 0
2010-01-20 Perforation 1230.30 1230.70 17
2010-01-20 Remedial Casing Cementing 1230.30 1230.70 0
2010-02-13 Perforation 1560.50 1561.00 17
2010-02-13 Remedial Casing Cementing 1560.50 1561.00 0
2010-02-20 Perforation 451.10 451.50 17
2010-02-20 Remedial Casing Cementing 451.10 451.50 0
2010-02-20 Perforation 426.10 426.50 17
2010-02-20 Remedial Casing Cementing 426.10 426.50 0
2010-03-18 Perforation 1282.00 1286.00 17
2010-03-18 Remedial Casing Cementing 1282.00 1286.00 0
2010-03-23 Cement Plug 1212.60 1229.00 0
2010-03-29 Perforation 475.00 478.00 8
2010-03-29 Remedial Casing Cementing 475.00 478.00 0
2010-04-06 Perforation 357.00 359.00 8
2010-04-06 Remedial Casing Cementing 357.00 359.00 0
2010-04-06 Perforation 365.00 367.00 8
2010-04-06 Remedial Casing Cementing 365.00 367.00 0
2010-04-17 Cement Plug 1014.20 1022.00 0
2010-04-17 Cement Plug 1004.00 1013.70 0
2010-04-20 Perforation 606.00 610.00 17
2010-04-20 Remedial Casing Cementing 606.00 610.00 0
2010-05-06 Packing Device Capped w/Cement 741.80 749.80 0
2010-05-07 Cement Plug 675.00 686.20 0
2010-05-08 Perforation 606.00 610.00 17
2010-05-08 Remedial Casing Cementing 606.00 610.00 0
2010-05-11 Perforation 601.00 607.50 99
2010-05-11 Remedial Casing Cementing 601.00 607.50 0
2010-05-13 Cement Plug 594.60 609.00 0
2010-05-14 Cement Plug 585.00 593.20 0
2010-05-26 Perforation 559.00 562.00 17
2010-05-26 Remedial Casing Cementing 559.00 562.00 0
2010-05-26 Perforation 524.00 527.00 17
2010-05-26 Remedial Casing Cementing 524.00 527.00 0
2010-05-26 Perforation 539.00 542.00 17
2010-05-26 Remedial Casing Cementing 539.00 542.00 0
2010-05-28 Cement Plug 539.50 563.00 0
2010-05-28 Cement Plug 534.80 535.80 0
2010-06-02 Cement Plug 518.50 528.00 0
2010-06-02 Cement Plug 508.00 517.80 0
2010-06-07 Perforation 473.00 476.00 17
2010-06-07 Remedial Casing Cementing 473.00 476.00 0
2010-06-07 Perforation 476.00 479.00 17
2010-06-07 Remedial Casing Cementing 476.00 479.00 0
2010-06-08 Cement Plug 468.80 480.00 0
2010-06-08 Cement Plug 459.00 468.00 0
2010-06-11 Perforation 310.00 312.00 17
2010-06-11 Remedial Casing Cementing 310.00 312.00 0
2010-06-11 Perforation 312.00 315.00 17
2010-06-11 Remedial Casing Cementing 312.00 315.00 0
2010-06-12 Cement Plug 306.20 316.00 0
2010-06-12 Cement Plug 297.00 305.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 159 0.0 0.0 0.0

For data sources see[5]

References