X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0475160106022"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0475160106022
 
| Well ID: 0475160106022
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.022279, -116.208925 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.022279, -116.208925 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/06-01-047-16W5/2
 
| Location: 02/06-01-047-16W5/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/06-01-047-16 W5/02
 
| Location Alias 2: 02/06-01-047-16 W5/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 047
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 16
 +
|-
 +
| Section: 01
 
|-
 
|-
 
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
 
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
Line 17: Line 27:
 
| Well Name: BOULDER PECO 6-1-47-16
 
| Well Name: BOULDER PECO 6-1-47-16
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Boulder Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0092090
 
| License Number: 0092090
Line 29: Line 39:
 
| Final Drill Date: 1981-11-28
 
| Final Drill Date: 1981-11-28
 
|-
 
|-
| Well Total Depth: 3992 m
+
| Well Total Depth: 3992.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.022279
 
| Surface Hole Latitude: 53.022279
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1981-09-03
 +
| Obtained License
 +
|-
 +
| 1981-11-28
 +
| Finished Drilling
 +
|-
 +
| 1981-11-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1981-12-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 1983-12-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1983-12-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1983-12-17
 +
| Well Log Performed
 +
|-
 +
| 1983-12-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1985-03-28
 +
| Well Log Performed
 +
|-
 +
| 1985-04-25
 +
| Well Log Performed
 +
|-
 +
| 1985-05-24
 +
| Well Log Performed
 +
|-
 +
| 1985-08-27
 +
| Well Log Performed
 +
|-
 +
| 1985-09-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1987-11-10
 +
| Well Log Performed
 +
|-
 +
| 1989-10-04
 +
| Well Log Performed
 +
|-
 +
| 1989-10-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1989-10-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1989-10-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2006-11-24
 +
| Well Log Performed
 +
|-
 +
| 2006-12-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2007-11-08
 +
| Well Log Performed
 +
|-
 +
| 2007-11-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2007-11-09
 +
| Plug Back Performed
 +
|-
 +
| 2007-11-09
 +
| Well Log Performed
 +
|-
 +
| 2007-11-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2007-11-10
 +
| Plug Back Performed
 +
|-
 +
| 2007-11-10
 +
| Well Log Performed
 +
|-
 +
| 2007-11-14
 +
| Well Log Performed
 +
|-
 +
| 2007-11-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-11-15
 +
| Well Log Performed
 +
|-
 +
| 2007-11-16
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2008-07-01
 +
| Well Began Production
 +
|-
 +
| 2008-07-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2008-07-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2016-06-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2016-06-01
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2018-04-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2018-04-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2018-06-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-06-15
 +
| Plug Back Performed
 +
|-
 +
| 2018-06-15
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2018-06-15
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2018-06-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2018-06-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2019-06-16
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 234:
 
| 1983-12-17
 
| 1983-12-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3952
+
| style="text-align: right;" | 3952.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1983-12-17
 
| 1983-12-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3952
+
| style="text-align: right;" | 3952.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1983-12-19
 
| 1983-12-19
| Fracture  
+
| Fracture
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3952
+
| style="text-align: right;" | 3952.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-09-17
 
| 1985-09-17
| Fracture  
+
| Fracture
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3952
+
| style="text-align: right;" | 3952.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989-10-05
 
| 1989-10-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3952
+
| style="text-align: right;" | 3952.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1989-10-05
 
| 1989-10-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3960
+
| style="text-align: right;" | 3960.00
| style="text-align: right;" | 3965
+
| style="text-align: right;" | 3965.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1989-10-07
 
| 1989-10-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3965
+
| style="text-align: right;" | 3965.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989-10-11
 
| 1989-10-11
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3965
+
| style="text-align: right;" | 3965.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-12-20
 
| 2006-12-20
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 3952
+
| style="text-align: right;" | 3952.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-12-20
 
| 2006-12-20
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3960
+
| style="text-align: right;" | 3960.00
| style="text-align: right;" | 3965
+
| style="text-align: right;" | 3965.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007-11-09
 
| 2007-11-09
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3864.7
+
| style="text-align: right;" | 3864.70
| style="text-align: right;" | 3875
+
| style="text-align: right;" | 3875.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007-11-10
 
| 2007-11-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2174.7
+
| style="text-align: right;" | 2174.70
| style="text-align: right;" | 2183
+
| style="text-align: right;" | 2183.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007-11-15
 
| 2007-11-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2141.5
+
| style="text-align: right;" | 2141.50
| style="text-align: right;" | 2143.5
+
| style="text-align: right;" | 2143.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2007-11-16
 
| 2007-11-16
| Fracture  
+
| Fracture
| style="text-align: right;" | 2141.5
+
| style="text-align: right;" | 2141.50
| style="text-align: right;" | 2143.5
+
| style="text-align: right;" | 2143.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018-06-15
 
| 2018-06-15
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2124
+
| style="text-align: right;" | 2124.00
| style="text-align: right;" | 2132
+
| style="text-align: right;" | 2132.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018-06-16
 
| 2018-06-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1862.5
+
| style="text-align: right;" | 1862.50
| style="text-align: right;" | 1874.5
+
| style="text-align: right;" | 1874.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2018-06-25
 
| 2018-06-25
| Fracture  
+
| Fracture
| style="text-align: right;" | 1862.5
+
| style="text-align: right;" | 1862.50
| style="text-align: right;" | 1874.5
+
| style="text-align: right;" | 1874.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 178: Line 338:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 211: Line 385:
 
| 2008
 
| 2008
 
| style="text-align: right;" | 3912
 
| style="text-align: right;" | 3912
| style="text-align: right;" | 401.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 18.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2009
 
| 2009
 
| style="text-align: right;" | 7506
 
| style="text-align: right;" | 7506
| style="text-align: right;" | 614.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 10.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2010
 
| 2010
 
| style="text-align: right;" | 7042
 
| style="text-align: right;" | 7042
| style="text-align: right;" | 358.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2011
 
| 2011
 
| style="text-align: right;" | 8495
 
| style="text-align: right;" | 8495
| style="text-align: right;" | 409.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2012
 
| 2012
 
| style="text-align: right;" | 8351
 
| style="text-align: right;" | 8351
| style="text-align: right;" | 335.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 9.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2013
 
| 2013
 
| style="text-align: right;" | 7425
 
| style="text-align: right;" | 7425
| style="text-align: right;" | 273.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2014
 
| 2014
 
| style="text-align: right;" | 7008
 
| style="text-align: right;" | 7008
| style="text-align: right;" | 215.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 253: Line 427:
 
| 2015
 
| 2015
 
| style="text-align: right;" | 7334
 
| style="text-align: right;" | 7334
| style="text-align: right;" | 305.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 259: Line 433:
 
| 2016
 
| 2016
 
| style="text-align: right;" | 2608
 
| style="text-align: right;" | 2608
| style="text-align: right;" | 107.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 267: Line 441:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
<!--== Occurences ==
+
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 277: Line 451:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 2018-06-27
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 05:50, 10 July 2020

Well Details

Well ID: 0475160106022
Loading map...
Location: 02/06-01-047-16W5/2
Location Alias: 02/06-01-47-16 W5M
Location Alias 2: 02/06-01-047-16 W5/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 16
Section: 01
County/Municipality: Yellowhead County
Well Name: BOULDER PECO 6-1-47-16
Operator Name: Boulder Energy Ltd.
License Number: 0092090
License Date: 1981-09-03
License Status: Suspension
Spud Date: 1981-09-15
Final Drill Date: 1981-11-28
Well Total Depth: 3992.00 m
Surface Hole Latitude: 53.022279
Surface Hole Longitude: -116.208925

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-03 Obtained License
1981-11-28 Finished Drilling
1981-11-28 Well Mode changed to Drilled and Cased
1981-12-04 Production Casing Operation Performed
1983-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-17 Perforation Treatment Performed - Jet Perforation
1983-12-17 Well Log Performed
1983-12-19 Perforation Treatment Performed - Fractured
1985-03-28 Well Log Performed
1985-04-25 Well Log Performed
1985-05-24 Well Log Performed
1985-08-27 Well Log Performed
1985-09-17 Perforation Treatment Performed - Fractured
1987-11-10 Well Log Performed
1989-10-04 Well Log Performed
1989-10-05 Perforation Treatment Performed - Jet Perforation
1989-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-24 Well Log Performed
2006-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-08 Well Log Performed
2007-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-09 Plug Back Performed
2007-11-09 Well Log Performed
2007-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-10 Plug Back Performed
2007-11-10 Well Log Performed
2007-11-14 Well Log Performed
2007-11-15 Perforation Treatment Performed - Jet Perforation
2007-11-15 Well Log Performed
2007-11-16 Perforation Treatment Performed - Fractured
2008-07-01 Well Began Production
2008-07-01 Well Fluid changed to Crude Oil
2008-07-01 Well Mode changed to Flowing
2016-06-01 Well Fluid changed to Crude Oil
2016-06-01 Well Mode changed to Pumping
2018-04-01 Well Fluid changed to Crude Oil
2018-04-01 Well Mode changed to Suspended
2018-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-15 Plug Back Performed
2018-06-15 Well Fluid changed to Crude Oil
2018-06-15 Well Mode changed to Abandoned Zone
2018-06-16 Perforation Treatment Performed - Jet Perforation
2018-06-25 Perforation Treatment Performed - Fractured
2019-06-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-17 Perforation 3947.00 3952.00 13
1983-12-17 Acid Treatment 3947.00 3952.00 0
1983-12-19 Fracture 3947.00 3952.00 0
1985-09-17 Fracture 3947.00 3952.00 0
1989-10-05 Perforation 3947.00 3952.00 13
1989-10-05 Perforation 3960.00 3965.00 13
1989-10-07 Acid Treatment 3947.00 3965.00 0
1989-10-11 Acid Treatment 3947.00 3965.00 0
2006-12-20 Acid Treatment 3947.00 3952.00 0
2006-12-20 Acid Treatment 3960.00 3965.00 0
2007-11-09 Packing Device Capped w/Cement 3864.70 3875.00 0
2007-11-10 Packing Device Capped w/Cement 2174.70 2183.00 0
2007-11-15 Perforation 2141.50 2143.50 17
2007-11-16 Fracture 2141.50 2143.50 0
2018-06-15 Packing Device Capped w/Cement 2124.00 2132.00 0
2018-06-16 Perforation 1862.50 1874.50 17
2018-06-25 Fracture 1862.50 1874.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3912 0.0 0.0 0.0
2009 7506 0.0 0.0 0.0
2010 7042 0.0 0.0 0.0
2011 8495 0.0 0.0 0.0
2012 8351 0.0 0.0 0.0
2013 7425 0.0 0.0 0.0
2014 7008 0.0 0.0 0.0
2015 7334 0.0 0.0 0.0
2016 2608 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References