X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0474132007000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0474132007000
 
| Well ID: 0474132007000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.06626, -111.864152 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.066260, -111.864152 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-20-047-13W4/0
 
| Location: 00/07-20-047-13W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/07-20-047-13 W4/00
 
| Location Alias 2: 00/07-20-047-13 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 047
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 13
 +
|-
 +
| Section: 20
 
|-
 
|-
 
| County/Municipality: [[Beaver County,_Alberta|Beaver County]]
 
| County/Municipality: [[Beaver County,_Alberta|Beaver County]]
Line 17: Line 27:
 
| Well Name: UNEX ET AL BRUCE 7-20-47-13
 
| Well Name: UNEX ET AL BRUCE 7-20-47-13
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[TAQA North Ltd.]]
 
|-
 
|-
 
| License Number: 0084425
 
| License Number: 0084425
Line 29: Line 39:
 
| Final Drill Date: 1980-08-05
 
| Final Drill Date: 1980-08-05
 
|-
 
|-
| Well Total Depth: 861.5 m
+
| Well Total Depth: 861.50 m
 
|-
 
|-
| Surface Hole Latitude: 53.06626
+
| Surface Hole Latitude: 53.066260
 
|-
 
|-
 
| Surface Hole Longitude: -111.864152
 
| Surface Hole Longitude: -111.864152
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1980-07-25
 +
| Obtained License
 +
|-
 +
| 1980-08-05
 +
| Finished Drilling
 +
|-
 +
| 1980-08-05
 +
| Well Log Performed
 +
|-
 +
| 1980-08-06
 +
| Production Casing Operation Performed
 +
|-
 +
| 1980-08-06
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1980-09-06
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1980-09-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1980-09-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-09-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-09-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1980-09-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1982-04-22
 +
| Well Began Production
 +
|-
 +
| 1982-04-22
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1982-04-22
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1985-08-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-08-20
 +
| Well Log Performed
 +
|-
 +
| 1985-08-24
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1987-02-02
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1987-02-02
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1993-06-19
 +
| Well Log Performed
 +
|-
 +
| 1993-07-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1993-07-15
 +
| Plug Back Performed
 +
|-
 +
| 1993-07-15
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1993-07-15
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1993-07-19
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1993-07-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-07-19
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1993-07-19
 +
| Plug Back Performed
 +
|-
 +
| 1993-07-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-07-21
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1994-05-27
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1994-05-28
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1994-05-28
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1994-05-28
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1994-08-06
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 204:
 
| 1980-09-06
 
| 1980-09-06
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 840
+
| style="text-align: right;" | 840.00
| style="text-align: right;" | 861.5
+
| style="text-align: right;" | 861.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-09-10
 
| 1980-09-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 817
+
| style="text-align: right;" | 817.00
| style="text-align: right;" | 825
+
| style="text-align: right;" | 825.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-09-10
 
| 1980-09-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 694
+
| style="text-align: right;" | 694.00
| style="text-align: right;" | 695.5
+
| style="text-align: right;" | 695.50
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1980-09-24
 
| 1980-09-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 808
+
| style="text-align: right;" | 808.00
| style="text-align: right;" | 810
+
| style="text-align: right;" | 810.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1980-09-26
 
| 1980-09-26
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 792
+
| style="text-align: right;" | 792.00
| style="text-align: right;" | 800
+
| style="text-align: right;" | 800.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-09-28
 
| 1980-09-28
| Fracture  
+
| Fracture
| style="text-align: right;" | 694
+
| style="text-align: right;" | 694.00
| style="text-align: right;" | 695.5
+
| style="text-align: right;" | 695.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-08-20
 
| 1985-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 696
+
| style="text-align: right;" | 696.00
| style="text-align: right;" | 697.5
+
| style="text-align: right;" | 697.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-08-20
 
| 1985-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 699.5
+
| style="text-align: right;" | 699.50
| style="text-align: right;" | 701
+
| style="text-align: right;" | 701.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-08-20
 
| 1985-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 703
+
| style="text-align: right;" | 703.00
| style="text-align: right;" | 705
+
| style="text-align: right;" | 705.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-08-24
 
| 1985-08-24
| Fracture  
+
| Fracture
| style="text-align: right;" | 694
+
| style="text-align: right;" | 694.00
| style="text-align: right;" | 705
+
| style="text-align: right;" | 705.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-07-15
 
| 1993-07-15
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 682
+
| style="text-align: right;" | 682.00
| style="text-align: right;" | 690
+
| style="text-align: right;" | 690.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-07-19
 
| 1993-07-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 74
+
| style="text-align: right;" | 74.00
| style="text-align: right;" | 76
+
| style="text-align: right;" | 76.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1993-07-19
 
| 1993-07-19
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 123
+
| style="text-align: right;" | 123.00
| style="text-align: right;" | 140
+
| style="text-align: right;" | 140.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-07-19
 
| 1993-07-19
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 74
+
| style="text-align: right;" | 74.00
| style="text-align: right;" | 76
+
| style="text-align: right;" | 76.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-07-21
 
| 1993-07-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 41.7
+
| style="text-align: right;" | 41.70
| style="text-align: right;" | 46.4
+
| style="text-align: right;" | 46.40
 
| style="text-align: right;" | 28
 
| style="text-align: right;" | 28
 
|-
 
|-
 
| 1993-07-21
 
| 1993-07-21
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 41.7
+
| style="text-align: right;" | 41.70
| style="text-align: right;" | 46.4
+
| style="text-align: right;" | 46.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-05-27
 
| 1994-05-27
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 74
+
| style="text-align: right;" | 74.00
| style="text-align: right;" | 76
+
| style="text-align: right;" | 76.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-05-28
 
| 1994-05-28
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 41.7
+
| style="text-align: right;" | 41.70
| style="text-align: right;" | 46.4
+
| style="text-align: right;" | 46.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 184: Line 314:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 217: Line 361:
 
| 1982
 
| 1982
 
| style="text-align: right;" | 941
 
| style="text-align: right;" | 941
| style="text-align: right;" | 137.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1983
 
| 1983
 
| style="text-align: right;" | 6444
 
| style="text-align: right;" | 6444
| style="text-align: right;" | 495.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1984
 
| 1984
 
| style="text-align: right;" | 6334
 
| style="text-align: right;" | 6334
| style="text-align: right;" | 457.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 38.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1985
 
| 1985
 
| style="text-align: right;" | 1979
 
| style="text-align: right;" | 1979
| style="text-align: right;" | 232.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 11.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1986
 
| 1986
 
| style="text-align: right;" | 5834
 
| style="text-align: right;" | 5834
| style="text-align: right;" | 582.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1987
 
| 1987
 
| style="text-align: right;" | 768
 
| style="text-align: right;" | 768
| style="text-align: right;" | 61.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 255: Line 399:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 16:47, 9 July 2020

Well Details

Well ID: 0474132007000
Loading map...
Location: 00/07-20-047-13W4/0
Location Alias: 00/07-20-47-13 W4M
Location Alias 2: 00/07-20-047-13 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 13
Section: 20
County/Municipality: Beaver County
Well Name: UNEX ET AL BRUCE 7-20-47-13
Operator Name: TAQA North Ltd.
License Number: 0084425
License Date: 1980-07-25
License Status: RecCertified
Spud Date: 1980-07-28
Final Drill Date: 1980-08-05
Well Total Depth: 861.50 m
Surface Hole Latitude: 53.066260
Surface Hole Longitude: -111.864152

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-25 Obtained License
1980-08-05 Finished Drilling
1980-08-05 Well Log Performed
1980-08-06 Production Casing Operation Performed
1980-08-06 Well Mode changed to Drilled and Cased
1980-09-06 Perforation Treatment Performed - Open-Hole Completion
1980-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-10 Perforation Treatment Performed - Jet Perforation
1980-09-24 Perforation Treatment Performed - Jet Perforation
1980-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-28 Perforation Treatment Performed - Fractured
1982-04-22 Well Began Production
1982-04-22 Well Fluid changed to Gas
1982-04-22 Well Mode changed to Flowing
1985-08-20 Perforation Treatment Performed - Jet Perforation
1985-08-20 Well Log Performed
1985-08-24 Perforation Treatment Performed - Fractured
1987-02-02 Well Fluid changed to Gas
1987-02-02 Well Mode changed to Suspended
1993-06-19 Well Log Performed
1993-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-15 Plug Back Performed
1993-07-15 Well Fluid changed to Gas
1993-07-15 Well Mode changed to Abandoned Zone
1993-07-19 Perforation Treatment Performed - Cement Plug
1993-07-19 Perforation Treatment Performed - Jet Perforation
1993-07-19 Perforation Treatment Performed - Remedial Casing
1993-07-19 Plug Back Performed
1993-07-21 Perforation Treatment Performed - Jet Perforation
1993-07-21 Perforation Treatment Performed - Remedial Casing
1994-05-27 Perforation Treatment Performed - Remedial Casing
1994-05-28 Perforation Treatment Performed - Remedial Casing
1994-05-28 Well Fluid changed to Gas
1994-05-28 Well Mode changed to Abandoned
1994-08-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-06 Open Hole/Barefoot Completion 840.00 861.50 0
1980-09-10 Packing Device Capped w/Cement 817.00 825.00 0
1980-09-10 Perforation 694.00 695.50 7
1980-09-24 Perforation 808.00 810.00 13
1980-09-26 Packing Device Capped w/Cement 792.00 800.00 0
1980-09-28 Fracture 694.00 695.50 0
1985-08-20 Perforation 696.00 697.50 13
1985-08-20 Perforation 699.50 701.00 13
1985-08-20 Perforation 703.00 705.00 13
1985-08-24 Fracture 694.00 705.00 0
1993-07-15 Packing Device Capped w/Cement 682.00 690.00 0
1993-07-19 Perforation 74.00 76.00 18
1993-07-19 Cement Plug 123.00 140.00 0
1993-07-19 Remedial Casing Cementing 74.00 76.00 0
1993-07-21 Perforation 41.70 46.40 28
1993-07-21 Remedial Casing Cementing 41.70 46.40 0
1994-05-27 Remedial Casing Cementing 74.00 76.00 0
1994-05-28 Remedial Casing Cementing 41.70 46.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 941 0.0 0.0 0.0
1983 6444 0.0 0.0 0.0
1984 6334 0.0 0.0 0.0
1985 1979 0.0 0.0 0.0
1986 5834 0.0 0.0 0.0
1987 768 0.0 0.0 0.0

For data sources see[5]

References