X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0264250106024"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0264250106024
 
| Well ID: 0264250106024
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.190329, -113.370276 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.190329, -113.370276 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/06-01-026-25W4/4
 
| Location: 02/06-01-026-25W4/4
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/06-01-026-25 W4/04
 
| Location Alias 2: 02/06-01-026-25 W4/04
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 026
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 01
 
|-
 
|-
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
Line 29: Line 39:
 
| Final Drill Date: 2001-10-23
 
| Final Drill Date: 2001-10-23
 
|-
 
|-
| Well Total Depth: 995 m
+
| Well Total Depth: 995.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 51.190329
 
| Surface Hole Latitude: 51.190329
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2001-10-15
 +
| Obtained License
 +
|-
 +
| 2001-10-21
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2001-10-23
 +
| Finished Drilling
 +
|-
 +
| 2001-10-23
 +
| Production Casing Operation Performed
 +
|-
 +
| 2001-10-23
 +
| Rig Released
 +
|-
 +
| 2001-10-23
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2001-11-11
 +
| Well Log Performed
 +
|-
 +
| 2001-11-14
 +
| Well Log Performed
 +
|-
 +
| 2001-12-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-01-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-01-25
 +
| Plug Back Performed
 +
|-
 +
| 2002-02-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-02-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-02-24
 +
| Plug Back Performed
 +
|-
 +
| 2002-02-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-06-13
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-08-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-10-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-11-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-06-12
 +
| Well Structure changed to Commingled
 +
|-
 +
| 2006-01-20
 +
| Well Began Production
 +
|-
 +
| 2006-01-20
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2006-01-20
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2006-02-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-02-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-04-19
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2006-04-19
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2011-10-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-10-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2011-10-26
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2011-10-26
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2011-10-27
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2011-10-27
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2017-05-01
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2017-05-01
 +
| Well Mode changed to Flowing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 204:
 
| 2001-12-05
 
| 2001-12-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 886
+
| style="text-align: right;" | 886.00
| style="text-align: right;" | 888
+
| style="text-align: right;" | 888.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-01-25
 
| 2002-01-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 875
+
| style="text-align: right;" | 875.00
| style="text-align: right;" | 883
+
| style="text-align: right;" | 883.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-02-02
 
| 2002-02-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 853
+
| style="text-align: right;" | 853.00
| style="text-align: right;" | 855
+
| style="text-align: right;" | 855.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-02-24
 
| 2002-02-24
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 835
+
| style="text-align: right;" | 835.00
| style="text-align: right;" | 843
+
| style="text-align: right;" | 843.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-02-27
 
| 2002-02-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 727
+
| style="text-align: right;" | 727.00
| style="text-align: right;" | 729
+
| style="text-align: right;" | 729.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-06-13
 
| 2002-06-13
| Fracture  
+
| Fracture
| style="text-align: right;" | 727
+
| style="text-align: right;" | 727.00
| style="text-align: right;" | 729
+
| style="text-align: right;" | 729.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-08-09
 
| 2002-08-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 669
+
| style="text-align: right;" | 669.00
| style="text-align: right;" | 671
+
| style="text-align: right;" | 671.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-08-09
 
| 2002-08-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 658
+
| style="text-align: right;" | 658.00
| style="text-align: right;" | 660
+
| style="text-align: right;" | 660.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-09-20
 
| 2002-09-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 628
+
| style="text-align: right;" | 628.00
| style="text-align: right;" | 631
+
| style="text-align: right;" | 631.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-09-20
 
| 2002-09-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 634
+
| style="text-align: right;" | 634.00
| style="text-align: right;" | 637
+
| style="text-align: right;" | 637.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-09-20
 
| 2002-09-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 645
+
| style="text-align: right;" | 645.00
| style="text-align: right;" | 649
+
| style="text-align: right;" | 649.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-10-07
 
| 2002-10-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 628
+
| style="text-align: right;" | 628.00
| style="text-align: right;" | 649
+
| style="text-align: right;" | 649.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-11-13
 
| 2002-11-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 394
+
| style="text-align: right;" | 394.00
| style="text-align: right;" | 398
+
| style="text-align: right;" | 398.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 589.9
+
| style="text-align: right;" | 589.90
| style="text-align: right;" | 590.4
+
| style="text-align: right;" | 590.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 584.3
+
| style="text-align: right;" | 584.30
| style="text-align: right;" | 584.8
+
| style="text-align: right;" | 584.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 580.1
+
| style="text-align: right;" | 580.10
| style="text-align: right;" | 580.6
+
| style="text-align: right;" | 580.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 547.6
+
| style="text-align: right;" | 547.60
| style="text-align: right;" | 548.1
+
| style="text-align: right;" | 548.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 546.5
+
| style="text-align: right;" | 546.50
| style="text-align: right;" | 547
+
| style="text-align: right;" | 547.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 540
+
| style="text-align: right;" | 540.00
| style="text-align: right;" | 541
+
| style="text-align: right;" | 541.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 534.2
+
| style="text-align: right;" | 534.20
| style="text-align: right;" | 534.7
+
| style="text-align: right;" | 534.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 526.3
+
| style="text-align: right;" | 526.30
| style="text-align: right;" | 526.8
+
| style="text-align: right;" | 526.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 519.8
+
| style="text-align: right;" | 519.80
| style="text-align: right;" | 520.3
+
| style="text-align: right;" | 520.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 472.5
+
| style="text-align: right;" | 472.50
| style="text-align: right;" | 473.5
+
| style="text-align: right;" | 473.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 470
+
| style="text-align: right;" | 470.00
| style="text-align: right;" | 471
+
| style="text-align: right;" | 471.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 455.5
+
| style="text-align: right;" | 455.50
| style="text-align: right;" | 456
+
| style="text-align: right;" | 456.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 449.2
+
| style="text-align: right;" | 449.20
| style="text-align: right;" | 449.7
+
| style="text-align: right;" | 449.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 445.7
+
| style="text-align: right;" | 445.70
| style="text-align: right;" | 446.2
+
| style="text-align: right;" | 446.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 444.8
+
| style="text-align: right;" | 444.80
| style="text-align: right;" | 445.3
+
| style="text-align: right;" | 445.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 435.5
+
| style="text-align: right;" | 435.50
| style="text-align: right;" | 436
+
| style="text-align: right;" | 436.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 432.6
+
| style="text-align: right;" | 432.60
| style="text-align: right;" | 433.1
+
| style="text-align: right;" | 433.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 431.7
+
| style="text-align: right;" | 431.70
| style="text-align: right;" | 432.2
+
| style="text-align: right;" | 432.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 425.2
+
| style="text-align: right;" | 425.20
| style="text-align: right;" | 425.7
+
| style="text-align: right;" | 425.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 422.5
+
| style="text-align: right;" | 422.50
| style="text-align: right;" | 423
+
| style="text-align: right;" | 423.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 411.5
+
| style="text-align: right;" | 411.50
| style="text-align: right;" | 412
+
| style="text-align: right;" | 412.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 408.1
+
| style="text-align: right;" | 408.10
| style="text-align: right;" | 408.6
+
| style="text-align: right;" | 408.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 403.7
+
| style="text-align: right;" | 403.70
| style="text-align: right;" | 404.2
+
| style="text-align: right;" | 404.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 402.3
+
| style="text-align: right;" | 402.30
| style="text-align: right;" | 402.8
+
| style="text-align: right;" | 402.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 353.2
+
| style="text-align: right;" | 353.20
| style="text-align: right;" | 353.7
+
| style="text-align: right;" | 353.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 352.2
+
| style="text-align: right;" | 352.20
| style="text-align: right;" | 352.7
+
| style="text-align: right;" | 352.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 344.8
+
| style="text-align: right;" | 344.80
| style="text-align: right;" | 345.3
+
| style="text-align: right;" | 345.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 305.9
+
| style="text-align: right;" | 305.90
| style="text-align: right;" | 306.4
+
| style="text-align: right;" | 306.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 296.2
+
| style="text-align: right;" | 296.20
| style="text-align: right;" | 296.7
+
| style="text-align: right;" | 296.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 292.5
+
| style="text-align: right;" | 292.50
| style="text-align: right;" | 293
+
| style="text-align: right;" | 293.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 280.4
+
| style="text-align: right;" | 280.40
| style="text-align: right;" | 280.9
+
| style="text-align: right;" | 280.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-11
 
| 2006-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 225
+
| style="text-align: right;" | 225.00
| style="text-align: right;" | 225.5
+
| style="text-align: right;" | 225.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-02-15
 
| 2006-02-15
| Fracture  
+
| Fracture
| style="text-align: right;" | 225
+
| style="text-align: right;" | 225.00
| style="text-align: right;" | 590.4
+
| style="text-align: right;" | 590.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-10-14
 
| 2011-10-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 201
+
| style="text-align: right;" | 201.00
| style="text-align: right;" | 203
+
| style="text-align: right;" | 203.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-10-14
 
| 2011-10-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 217
+
| style="text-align: right;" | 217.00
| style="text-align: right;" | 219
+
| style="text-align: right;" | 219.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-10-14
 
| 2011-10-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 231
+
| style="text-align: right;" | 231.00
| style="text-align: right;" | 233
+
| style="text-align: right;" | 233.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-10-14
 
| 2011-10-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 247
+
| style="text-align: right;" | 247.00
| style="text-align: right;" | 250
+
| style="text-align: right;" | 250.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-10-14
 
| 2011-10-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 348
+
| style="text-align: right;" | 348.00
| style="text-align: right;" | 350
+
| style="text-align: right;" | 350.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-10-14
 
| 2011-10-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 356
+
| style="text-align: right;" | 356.00
| style="text-align: right;" | 358
+
| style="text-align: right;" | 358.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-10-14
 
| 2011-10-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 366
+
| style="text-align: right;" | 366.00
| style="text-align: right;" | 369
+
| style="text-align: right;" | 369.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2011-10-20
 
| 2011-10-20
| Fracture  
+
| Fracture
| style="text-align: right;" | 225
+
| style="text-align: right;" | 225.00
| style="text-align: right;" | 671
+
| style="text-align: right;" | 671.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 400: Line 530:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 433: Line 577:
 
| 2006
 
| 2006
 
| style="text-align: right;" | 6333
 
| style="text-align: right;" | 6333
| style="text-align: right;" | 336.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 8.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2007
 
| 2007
 
| style="text-align: right;" | 5408
 
| style="text-align: right;" | 5408
| style="text-align: right;" | 218.5
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 445: Line 589:
 
| 2008
 
| 2008
 
| style="text-align: right;" | 8783
 
| style="text-align: right;" | 8783
| style="text-align: right;" | 110.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 451: Line 595:
 
| 2009
 
| 2009
 
| style="text-align: right;" | 8759
 
| style="text-align: right;" | 8759
| style="text-align: right;" | 223.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2010
 
| 2010
 
| style="text-align: right;" | 8759
 
| style="text-align: right;" | 8759
| style="text-align: right;" | 245.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2011
 
| 2011
 
| style="text-align: right;" | 8094
 
| style="text-align: right;" | 8094
| style="text-align: right;" | 186.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2012
 
| 2012
 
| style="text-align: right;" | 4170
 
| style="text-align: right;" | 4170
| style="text-align: right;" | 65.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2013
 
| 2013
 
| style="text-align: right;" | 8759
 
| style="text-align: right;" | 8759
| style="text-align: right;" | 130.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2014
 
| 2014
 
| style="text-align: right;" | 8736
 
| style="text-align: right;" | 8736
| style="text-align: right;" | 115.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 487: Line 631:
 
| 2015
 
| 2015
 
| style="text-align: right;" | 8749
 
| style="text-align: right;" | 8749
| style="text-align: right;" | 103.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 493: Line 637:
 
| 2016
 
| 2016
 
| style="text-align: right;" | 8767
 
| style="text-align: right;" | 8767
| style="text-align: right;" | 105.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2017
 
| 2017
 
| style="text-align: right;" | 8562
 
| style="text-align: right;" | 8562
| style="text-align: right;" | 89.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2018
 
| 2018
 
| style="text-align: right;" | 8683
 
| style="text-align: right;" | 8683
| style="text-align: right;" | 79.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2019
 
| 2019
| style="text-align: right;" | 2151
+
| style="text-align: right;" | 8748
| style="text-align: right;" | 16.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2169
 +
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 519: Line 669:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 02:03, 9 July 2020

Well Details

Well ID: 0264250106024
Loading map...
Location: 02/06-01-026-25W4/4
Location Alias: 02/06-01-26-25 W4M
Location Alias 2: 02/06-01-026-25 W4/04
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 01
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 6-1-26-25
Operator Name: Ember Resources Inc.
License Number: 0260551
License Date: 2001-10-15
License Status: Issued
Spud Date: 2001-10-21
Final Drill Date: 2001-10-23
Well Total Depth: 995.00 m
Surface Hole Latitude: 51.190329
Surface Hole Longitude: -113.370276

For data sources see[1][2]

Well History

Date Event
2001-10-15 Obtained License
2001-10-21 Surface Casing Operation Performed
2001-10-23 Finished Drilling
2001-10-23 Production Casing Operation Performed
2001-10-23 Rig Released
2001-10-23 Well Mode changed to Drilled and Cased
2001-11-11 Well Log Performed
2001-11-14 Well Log Performed
2001-12-05 Perforation Treatment Performed - Jet Perforation
2002-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-25 Plug Back Performed
2002-02-02 Perforation Treatment Performed - Jet Perforation
2002-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-24 Plug Back Performed
2002-02-27 Perforation Treatment Performed - Jet Perforation
2002-06-13 Perforation Treatment Performed - Fractured
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-10-07 Perforation Treatment Performed - Fractured
2002-11-13 Perforation Treatment Performed - Jet Perforation
2003-06-12 Well Structure changed to Commingled
2006-01-20 Well Began Production
2006-01-20 Well Fluid changed to Gas
2006-01-20 Well Mode changed to Flowing
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-15 Perforation Treatment Performed - Fractured
2006-04-19 Well Fluid changed to Coalbed Methane-Coals and Other
2006-04-19 Well Mode changed to Flowing
2011-10-14 Perforation Treatment Performed - Jet Perforation
2011-10-20 Perforation Treatment Performed - Fractured
2011-10-26 Well Fluid changed to Coalbed Methane-Coals and Other
2011-10-26 Well Mode changed to Suspended
2011-10-27 Well Fluid changed to Coalbed Methane-Coals and Other
2011-10-27 Well Mode changed to Flowing
2017-05-01 Well Fluid changed to Coalbed Methane-Coals and Other
2017-05-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-05 Perforation 886.00 888.00 7
2002-01-25 Packing Device Capped w/Cement 875.00 883.00 0
2002-02-02 Perforation 853.00 855.00 7
2002-02-24 Packing Device Capped w/Cement 835.00 843.00 0
2002-02-27 Perforation 727.00 729.00 7
2002-06-13 Fracture 727.00 729.00 0
2002-08-09 Perforation 669.00 671.00 7
2002-08-09 Perforation 658.00 660.00 7
2002-09-20 Perforation 628.00 631.00 7
2002-09-20 Perforation 634.00 637.00 7
2002-09-20 Perforation 645.00 649.00 7
2002-10-07 Fracture 628.00 649.00 0
2002-11-13 Perforation 394.00 398.00 7
2006-02-11 Perforation 589.90 590.40 13
2006-02-11 Perforation 584.30 584.80 13
2006-02-11 Perforation 580.10 580.60 13
2006-02-11 Perforation 547.60 548.10 13
2006-02-11 Perforation 546.50 547.00 13
2006-02-11 Perforation 540.00 541.00 13
2006-02-11 Perforation 534.20 534.70 13
2006-02-11 Perforation 526.30 526.80 13
2006-02-11 Perforation 519.80 520.30 13
2006-02-11 Perforation 472.50 473.50 13
2006-02-11 Perforation 470.00 471.00 13
2006-02-11 Perforation 455.50 456.00 13
2006-02-11 Perforation 449.20 449.70 13
2006-02-11 Perforation 445.70 446.20 13
2006-02-11 Perforation 444.80 445.30 13
2006-02-11 Perforation 435.50 436.00 13
2006-02-11 Perforation 432.60 433.10 13
2006-02-11 Perforation 431.70 432.20 13
2006-02-11 Perforation 425.20 425.70 13
2006-02-11 Perforation 422.50 423.00 13
2006-02-11 Perforation 411.50 412.00 13
2006-02-11 Perforation 408.10 408.60 13
2006-02-11 Perforation 403.70 404.20 13
2006-02-11 Perforation 402.30 402.80 13
2006-02-11 Perforation 353.20 353.70 13
2006-02-11 Perforation 352.20 352.70 13
2006-02-11 Perforation 344.80 345.30 13
2006-02-11 Perforation 305.90 306.40 13
2006-02-11 Perforation 296.20 296.70 13
2006-02-11 Perforation 292.50 293.00 13
2006-02-11 Perforation 280.40 280.90 13
2006-02-11 Perforation 225.00 225.50 13
2006-02-15 Fracture 225.00 590.40 0
2011-10-14 Perforation 201.00 203.00 13
2011-10-14 Perforation 217.00 219.00 13
2011-10-14 Perforation 231.00 233.00 13
2011-10-14 Perforation 247.00 250.00 13
2011-10-14 Perforation 348.00 350.00 13
2011-10-14 Perforation 356.00 358.00 13
2011-10-14 Perforation 366.00 369.00 13
2011-10-20 Fracture 225.00 671.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6333 0.0 0.0 0.0
2007 5408 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8094 0.0 0.0 0.0
2012 4170 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8767 0.0 0.0 0.0
2017 8562 0.0 0.0 0.0
2018 8683 0.0 0.0 0.0
2019 8748 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

References