X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-25180"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-065-25180
 
| Well ID: 37-065-25180
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.018029, -78.85 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.018029, -78.85 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: ENGLE 2
 
| Farm/Lease Name: ENGLE 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
 
| Spud Date: 2005-09-02
 
| Spud Date: 2005-09-02
 
|-
 
|-
 
| Permit Date: 2004-10-01
 
| Permit Date: 2004-10-01
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.018029
 
| Latitude: 41.018029
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2004-10-01
 +
| New Permit Application
 +
|-
 +
| 2005-09-02
 +
| Performed Spud Operation
 +
|-
 +
| 2005-09-08
 +
| Drilling Completion
 +
|-
 +
| 2005-09-14
 +
| Perforation
 +
|-
 +
| 2006-11-16
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 86: Line 127:
 
|-
 
|-
 
| 2004
 
| 2004
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 95: Line 136:
 
|-
 
|-
 
| 2005
 
| 2005
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 104: Line 145:
 
|-
 
|-
 
| 2006
 
| 2006
| style="text-align: right;" |
+
| [[EXCO RESOURCES PA INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 114: Line 155:
 
| 2007
 
| 2007
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| style="text-align: right;" | 3,278.00
+
| style="text-align: right;" | 3278
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 122: Line 163:
 
|-
 
|-
 
| 2008
 
| 2008
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 131: Line 172:
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 140: Line 181:
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 149: Line 190:
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 194: Line 235:
 
|-
 
|-
 
| 2016
 
| 2016
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 554.00
 
| style="text-align: right;" | 554.00
 
| style="text-align: right;" | 183
 
| style="text-align: right;" | 183
Line 203: Line 244:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 1,832.00
 
| style="text-align: right;" | 1,832.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 212: Line 253:
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 1,713.00
 
| style="text-align: right;" | 1,713.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[ALLIANCE PETRO CO LLC]]
 +
| style="text-align: right;" | 560.00
 +
| style="text-align: right;" | 303
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 230: Line 280:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 235: Line 286:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 241: Line 293:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[EXCO RESOURCES PA INC]]
 +
| Brine
 +
| style="text-align: right;" | 320.00 Bbl
 +
| Reuse other than road spreading
 +
|
 +
|-
 +
| 2008
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 480.00 Bbl
 
| style="text-align: right;" | 480.00 Bbl
Line 247: Line 307:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 253: Line 314:
 
|  
 
|  
 
|-
 
|-
| 2008-A00
+
| 2009
| Brine
+
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 320.00 Bbl
 
| Reuse other than road spreading
 
|
 
|-
 
| 2009-A00
 
 
| Brine
 
| Brine
 
| style="text-align: right;" | 1,068.00 Bbl
 
| style="text-align: right;" | 1,068.00 Bbl
Line 265: Line 321:
 
|  
 
|  
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301357
 
| 301357
 
|-
 
|-
| 2011-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 320.60 Bbl
 
| style="text-align: right;" | 320.60 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301357
 
| 301357
 
|-
 
|-
| 2011-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PAS2D205BCLE
 
| PAS2D205BCLE
 
|-
 
|-
| 2012-A00
+
| 2012
| Produced Fluid (in Barrels)
+
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 320.00 Bbl
 
| style="text-align: right;" | 320.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301357
 
| 301357
 
|-
 
|-
| 2013-A00
+
| 2013
| Produced Fluid (in Barrels)
+
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 400.00 Bbl
 
| style="text-align: right;" | 400.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2014-A00
+
| 2014
| Produced Fluid (in Barrels)
+
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 240.00 Bbl
 
| style="text-align: right;" | 240.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 210.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028207
 
|-
 
|-
 
|}
 
|}

Latest revision as of 20:58, 2 June 2020

Well Details

Well ID: 37-065-25180
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Henderson Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: ENGLE 2
License Status: ACTIVE
Spud Date: 2005-09-02
Permit Date: 2004-10-01
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.018029
Longitude: -78.85

For data sources see[1][2][3]

Well History

Date Event
2004-10-01 New Permit Application
2005-09-02 Performed Spud Operation
2005-09-08 Drilling Completion
2005-09-14 Perforation
2006-11-16 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2005 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2006 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 3278 0 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 2,706.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 2,291.38 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 2,145.74 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 2,122.76 362 0.00 0 0.00 0
2016 ALLIANCE PETRO CO LLC 554.00 183 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 1,832.00 365 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 1,713.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 560.00 303 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 EXCO RESOURCES PA INC Brine 160.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2008 EXCO RESOURCES PA INC Brine 320.00 Bbl Reuse other than road spreading
2008 EXCO RESOURCES PA INC Brine 480.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2008 EXCO RESOURCES PA INC Brine 160.00 Bbl Other
2009 EXCO RESOURCES PA INC Brine 1,068.00 Bbl Other
2010 EXCO RESOURCES PA INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301357
2011 EXCO RESOURCES PA LLC Produced Fluid 320.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301357
2011 EXCO RESOURCES PA LLC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2012 EXCO RESOURCES PA LLC Produced Fluid 320.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301357
2013 EXCO RESOURCES PA LLC Produced Fluid 400.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2014 EXCO RESOURCES PA LLC Produced Fluid 240.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 EXCO RESOURCES PA LLC Produced Fluid 210.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1479300 Primary Facility 2005-09-14 Drilling/Alteration No Violations Noted
1510930 Primary Facility 2006-01-30 Drilling/Alteration Viol(s) Noted & Immediately Corrected
2761378 Primary Facility 2018-08-08 Routine/Complete Inspection No Violations Noted This well was drilled in a forested area off of Kramer Road in September 2005. No violations were noted during this inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1510930 482004 01/30/2006 2006-01-30 401 CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety

For data sources see[7]

References