If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 435: | Line 435: | ||
|- | |- | ||
|} | |} | ||
− | ==== Penalties Applied ==== | + | <!--==== Penalties Applied ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Violation ID | !scope="col" | Violation ID | ||
Line 446: | Line 446: | ||
!scope="col" | Amount Collected | !scope="col" | Amount Collected | ||
|- | |- | ||
− | | | + | |}--> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title =Oil and Gas Compliance Report | | title =Oil and Gas Compliance Report |
Well ID: 37-065-24761 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.959874,"lon":-78.81953,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Gaskill Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: HARRIET C MCCLURE ET AL 747 | |
License Status: ACTIVE | |
Spud Date: 2002-03-25 | |
Permit Date: 2002-02-28 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.959874 | |
Longitude: -78.819530 |
Date | Event |
---|---|
2002-02-28 | New Permit Application |
2002-03-22 | Performed Spud Operation |
2002-03-26 | Drilling Completion |
2002-04-08 | Perforation |
2003-03-06 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2002 | EOG RESOURCES INC | 23197 | 275 | 0.00 | 0 | 0.00 | 0 |
2004 | EOG RESOURCES INC | 10816 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | EXCO RESOURCES PA INC | 4876.20 | 366 | 0.00 | 0 | 0.00 | 0 |
2009 | EXCO RESOURCES PA INC | 4107.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | EXCO RESOURCES PA INC | 3,282.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 2,964.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 2,431.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 2,253.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 2,809.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 2,341.91 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 826.00 | 183 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,666.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 2,053.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2002 | EOG RESOURCES INC | Brine | 210.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2002 | EOG RESOURCES INC | Brine | 304.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2004 | EOG RESOURCES INC | Brine | 143.00 Bbl | Treated On-Site, NPDES Discharge | PA0095443 |
2005 | EOG RESOURCES INC | Brine | 72.00 Bbl | Treated On-Site, NPDES Discharge | PA0095273 |
2008 | EXCO RESOURCES PA INC | Brine | 78.00 Bbl | Injection Disposal Well | PAS2D205BCLE |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 76.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1109812 | Primary Facility | 2002-03-20 | Routine/Complete Inspection | No Violations Noted | Well site constructed, well not drilled. |
1111113 | Primary Facility | 2002-03-26 | Drilling/Alteration | No Violations Noted | |
1115933 | Primary Facility | 2002-04-16 | Routine/Complete Inspection | No Violations Noted | Site I.D. sign and E+S plan are posted on the access road. |
1185523 | Primary Facility | 2002-11-13 | Routine/Complete Inspection | No Violations Noted | Well is tagged and is producing. |
1196802 | Primary Facility | 2003-01-02 | Administrative/File Review | Violation(s) Noted | |
1246502 | Primary Facility | 2003-06-24 | Routine/Complete Inspection | No Violations Noted | |
2556098 | Primary Facility | 2017-01-25 | Routine/Complete Inspection | No Violations Noted | |
2856525 | Primary Facility | 2019-03-21 | Routine/Complete Inspection | No Violations Noted | This well was drilled in a forested area off of Filtering Plant Road in March 2002. No violations were noted during this inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1196802 | 331399 | 01/02/2003 | 2003-01-02 | 78.65(3)* - Failure to submit or submitting an inadequate well site restoration report within 60 days of restoration of the well site | Administrative | Failure to submit well site restoration report within 60 days of restoration. |
For data sources see[7]