X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-20564"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-051-20564
 
| Well ID: 37-051-20564
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.012373, -79.677204 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.012373, -79.677204 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Dunbar Township,_Fayette_County,_Pennsylvania|Dunbar Township]]
 
| Municipality: [[Dunbar Township,_Fayette_County,_Pennsylvania|Dunbar Township]]
 
|-
 
|-
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 19: Line 19:
 
| Farm/Lease Name: DAVID A. RUPP 1
 
| Farm/Lease Name: DAVID A. RUPP 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 05/30/1991
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 5/22/1991
+
| Permit Date: 1991-05-22
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.012373
 
| Latitude: 40.012373
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1991-05-22
 +
| New Permit Application
 +
|-
 +
| 1991-05-30
 +
| Performed Spud Operation
 +
|-
 +
| 1991-06-11
 +
| Drilling Completion
 +
|-
 +
| 1991-06-11
 +
| Perforation
 +
|-
 +
| 1991-06-11
 +
| Performed Stimulation 
 +
|-
 +
| 1991-08-28
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 1991-06-11
 +
| style="text-align: right;" |
 +
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 143:
 
| 1993
 
| 1993
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 5,887.00
+
| style="text-align: right;" | 5887.00
 
| style="text-align: right;" | 267
 
| style="text-align: right;" | 267
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 7,668.00
+
| style="text-align: right;" | 7668.00
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 9,139.00
+
| style="text-align: right;" | 9139.00
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 7,916.00
+
| style="text-align: right;" | 7916
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 4,727.00
+
| style="text-align: right;" | 4727
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 2,984.00
+
| style="text-align: right;" | 2984
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 1,992.00
+
| style="text-align: right;" | 1992
 
| style="text-align: right;" | 349
 
| style="text-align: right;" | 349
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 1,391.00
+
| style="text-align: right;" | 1391
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 983.00
+
| style="text-align: right;" | 983
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 1,355.00
+
| style="text-align: right;" | 1355
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 1,320.00
+
| style="text-align: right;" | 1320
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |
+
| style="text-align: right;" | 0
| style="text-align: right;" | 0.00
 
| style="text-align: right;" |
 
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 1,021.00
+
| style="text-align: right;" | 1021
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 821.00
+
| style="text-align: right;" | 821
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 182: Line 263:
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 191: Line 272:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 200: Line 281:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[PHILLIPS PROD CO]]
 
| [[PHILLIPS PROD CO]]
| style="text-align: right;" | 1,066.00
+
| style="text-align: right;" | 1066.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 218: Line 299:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 227: Line 308:
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 236: Line 317:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 245: Line 326:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 254: Line 335:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 263: Line 344:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 272: Line 353:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 46.00
 
| style="text-align: right;" | 46.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 492.00
 
| style="text-align: right;" | 492.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[ALLIANCE PETRO CO LLC]]
 +
| style="text-align: right;" | 2,170.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 304: Line 394:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 309: Line 400:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1994-A00
+
| 1994
 +
| [[PHILLIPS PROD CO]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 315: Line 407:
 
|  
 
|  
 
|-
 
|-
| 1995-A00
+
| 1995
 +
| [[PHILLIPS PROD CO]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 95.00 Bbl
 
| style="text-align: right;" | 95.00 Bbl
Line 321: Line 414:
 
|  
 
|  
 
|-
 
|-
| 1997-A00
+
| 1997
 +
| [[PHILLIPS PROD CO]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 77.00 Bbl
 
| style="text-align: right;" | 77.00 Bbl
Line 327: Line 421:
 
| GROUP
 
| GROUP
 
|-
 
|-
| 1998-A00
+
| 1998
 +
| [[PHILLIPS PROD CO]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
Line 333: Line 428:
 
| 033-WAST2
 
| 033-WAST2
 
|-
 
|-
| 2003-A00
+
| 2003
 +
| [[PHILLIPS PROD CO]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0.00 Bbl
 
| style="text-align: right;" | 0.00 Bbl
Line 398: Line 494:
 
| 94331
 
| 94331
 
| 06/12/1991
 
| 06/12/1991
| 08/01/1991
+
| 1991-06-12
 
| 78.56.9101.4 - Impoundment not; permitted or approved, structurally sound, impermeable, third party protected, 2 ft freeboard, inadequate liner, subbase, slopes, capacity, surface water not diverted, w/in 20 inches of high ground water table
 
| 78.56.9101.4 - Impoundment not; permitted or approved, structurally sound, impermeable, third party protected, 2 ft freeboard, inadequate liner, subbase, slopes, capacity, surface water not diverted, w/in 20 inches of high ground water table
 
| Administrative
 
| Administrative
Line 406: Line 502:
 
| 94332
 
| 94332
 
| 06/12/1991
 
| 06/12/1991
| 08/01/1991
+
| 1991-06-12
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 414: Line 510:
 
| 94428
 
| 94428
 
| 07/03/1991
 
| 07/03/1991
| 08/01/1991
+
| 1991-07-03
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 436: Line 532:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/12/1992
+
| 1992-05-12
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 445: Line 541:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/12/1992
+
| 1992-05-12
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 456: Line 552:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 17:14, 2 June 2020

Well Details

Well ID: 37-051-20564
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: DAVID A. RUPP 1
License Status: ACTIVE
Spud Date:
Permit Date: 1991-05-22
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.012373
Longitude: -79.677204

For data sources see[1][2][3]

Well History

Date Event
1991-05-22 New Permit Application
1991-05-30 Performed Spud Operation
1991-06-11 Drilling Completion
1991-06-11 Perforation
1991-06-11 Performed Stimulation
1991-08-28 NEWLY DRILLED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
1991-06-11 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1993 PHILLIPS PROD CO 5887.00 267 0.00 0 0.00 0
1994 PHILLIPS PROD CO 7668.00 252 0.00 0 0.00 0
1995 PHILLIPS PROD CO 9139.00 304 0.00 0 0.00 0
1996 PHILLIPS PROD CO 7916 365 0.00 0 0.00 0
1997 PHILLIPS PROD CO 4727 354 0.00 0 0.00 0
1998 PHILLIPS PROD CO 2984 365 0.00 0 0.00 0
1999 PHILLIPS PROD CO 1992 349 0.00 0 0.00 0
2000 PHILLIPS PROD CO 1391 365 0.00 0 0.00 0
2001 PHILLIPS PROD CO 983 365 0.00 0 0.00 0
2002 PHILLIPS PROD CO 1355 357 0.00 0 0.00 0
2003 PHILLIPS PROD CO 1320 365 0 365 0.00 0
2004 PHILLIPS PROD CO 1021 366 0.00 0 0.00 0
2005 PHILLIPS PROD CO 821 365 0.00 0 0.00 0
2006 PHILLIPS PROD CO 781.00 361 0.00 0 0.00 0
2007 PHILLIPS PROD CO 294.00 365 0.00 0 0.00 0
2008 PHILLIPS PROD CO 256.00 366 0.00 0 0.00 0
2009 PHILLIPS PROD CO 1066.00 365 0.00 0 0.00 0
2010 PHILLIPS PROD CO 67.00 334 0.00 0 0.00 0
2011 PHILLIPS PROD CO 858.00 346 0.00 0 0.00 0
2012 XTO ENERGY INC 785.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 636.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 87.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 319.56 365 0.00 0 0.00 0
2016 XTO ENERGY INC 69.64 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 46.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 492.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 2,170.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1994 PHILLIPS PROD CO Brine 30.00 Bbl
1995 PHILLIPS PROD CO Brine 95.00 Bbl
1997 PHILLIPS PROD CO Brine 77.00 Bbl Brine or Industrial Waste Treatment Plt GROUP
1998 PHILLIPS PROD CO Brine 35.00 Bbl Brine or Industrial Waste Treatment Plt 033-WAST2
2003 PHILLIPS PROD CO Brine 0.00 Bbl Brine or Industrial Waste Treatment Plt

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
368630 Primary Facility 1991-06-12 Routine/Complete Inspection Violation(s) Noted <2'FRBRD;SITE UNSTABLE
368791 Primary Facility 1991-07-03 Routine/Complete Inspection Violation(s) Noted SITE UNSTABLE-NOV SENT
368946 Primary Facility 1991-08-01 Routine/Complete Inspection No Violations Noted E&S OK
369996 Primary Facility 1991-12-11 Site Restoration No Violations Noted SITE RESTORED

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
368630 94331 06/12/1991 1991-06-12 78.56.9101.4 - Impoundment not; permitted or approved, structurally sound, impermeable, third party protected, 2 ft freeboard, inadequate liner, subbase, slopes, capacity, surface water not diverted, w/in 20 inches of high ground water table Administrative <2' FREEBOARD
368630 94332 06/12/1991 1991-06-12 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety SITE UNSTABLE
368791 94428 07/03/1991 1991-07-03 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety SITE UNSTABLE

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
94331 23474 NOV - Notice of Violation Comply/Closed 1992-05-12
94332 23474 NOV - Notice of Violation Comply/Closed 1992-05-12

For data sources see[8]

References