X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-013-20016"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-013-20016
 
| Well ID: 37-013-20016
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.362608, -78.549922 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.362608, -78.549922 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: LIGHTNER EAST UNIT 1H
 
| Farm/Lease Name: LIGHTNER EAST UNIT 1H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 01/23/2011
+
| Spud Date: 2010-10-31
 
|-
 
|-
| Permit Date: 8/10/2010
+
| Permit Date: 2010-08-10
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.362608
 
| Latitude: 40.362608
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-08-10
 +
| New Permit Application
 +
|-
 +
| 2010-11-20
 +
| Drilling Completion
 +
|-
 +
| 2011-01-23
 +
| Performed Spud Operation
 +
|-
 +
| 2011-04-11
 +
| Perforation
 +
|-
 +
| 2012-07-20
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2011-04-11
 +
| 2011-04-11
 +
| style="text-align: right;" | 7,177
 +
| style="text-align: right;" | 4,642,470
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="12"| 1
 +
| rowspan="2"| Scale Inhibitor - Greenhib 677
 +
| rowspan="2"| Pumpco Services
 +
| rowspan="2"| Scale Inhibitor
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Salt of phosphono-methylated diamine
 +
|
 +
| style="text-align: right;" | 25.00
 +
| style="text-align: right;" | 0.07
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Friction Reducer - Plexslick 921
 +
| rowspan="2"| Pumpco Services
 +
| rowspan="2"| Friction Reducer
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.10
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Biocide - Plexcide 24L
 +
| rowspan="3"| Pumpco Services
 +
| rowspan="3"| Biocide
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Sodium hydroxide
 +
| 1310-73-2
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione
 +
| 533-74-4
 +
| style="text-align: right;" | 24.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Plexaid OS-30
 +
| rowspan="2"| Pumpco Services
 +
| rowspan="2"| Oxygen Scavenger
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Ammonium bisulfite
 +
| 10192-30-0
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Sand (Proppant)
 +
| rowspan="2"| Pumpco Services
 +
| rowspan="2"| Propping Agent
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 99.90
 +
| style="text-align: right;" | 18.21
 +
| style="text-align: right;" |
 +
|-
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"|
 +
| rowspan="1"| Base Fluid
 +
| Water
 +
|
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 81.58
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 70: Line 244:
 
|-
 
|-
 
| 2011
 
| 2011
| [[CHIEF OIL & GAS LLC]]
+
| [[CHEVRON APPALACHIA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 106: Line 280:
 
|-
 
|-
 
| 2015
 
| 2015
| [[CHEVRON APPALACHIA LLC]]
+
| [[LPR ENERGY LLC]]
 
| style="text-align: right;" | 135,164.69
 
| style="text-align: right;" | 135,164.69
 
| style="text-align: right;" | 315
 
| style="text-align: right;" | 315
Line 143: Line 317:
 
| 2019
 
| 2019
 
| [[LPR ENERGY LLC]]
 
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 28,511.00
+
| style="text-align: right;" | 111,230.00
| style="text-align: right;" | 90
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 160: Line 334:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 165: Line 340:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 15APRU
+
| 2011
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 632.00 Bbl
+
| Fracing Fluid Waste
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 15AUGU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 200.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 15DECU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 130.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 15JULU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 575.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 15JUNU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 460.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 15MAYU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 69.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
|-
 
| 15NOVU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 277.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 15OCTU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 321.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
|-
 
| 15OCTU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 125.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 15SEPU
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 294.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16APRU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 500.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16AUGU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
|-
 
| 16DECU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 418.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
|-
 
| 16FEBU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 245.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16JANU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 295.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16JULU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 271.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
|-
 
| 16JULU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 108.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16JUNU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 433.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16MARU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 200.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16MAYU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 393.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16NOVU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
|-
 
| 16OCTU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 299.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16SEPU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 305.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
|-
 
| 2011-2
 
| Fracing Fluid Waste (in Barrels)
 
 
| style="text-align: right;" | 3,143.00 Bbl
 
| style="text-align: right;" | 3,143.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2012-1
+
| 2012
| Drilling Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 690.00 Bbl
+
| Fracing Fluid Waste
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
|-
 
| 2012-2
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 120.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
|-
 
| 2012-2
 
| Fracing Fluid Waste (in Barrels)
 
 
| style="text-align: right;" | 335.00 Bbl
 
| style="text-align: right;" | 335.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2012-2
+
| 2012
| Fracturing Fluid Waste (in Tons)
+
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 
| style="text-align: right;" | 64.61 Tons
 
| style="text-align: right;" | 64.61 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101397
 
| 101397
 
|-
 
|-
| 2013-1
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 611.00 Bbl
+
| Fracing Fluid Waste
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 120.00 Bbl
|  
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 690.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 
|-
 
|-
| 2013-1
+
| 2013
| Fracturing Fluid Waste (in Tons)
+
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 
| style="text-align: right;" | 0.44 Tons
 
| style="text-align: right;" | 0.44 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101397
 
| 101397
 
|-
 
|-
| 2013-1
+
| 2013
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 6,403.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 10,511.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-2
+
| 2013
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 4,108.00 Bbl
+
| Fracing Fluid Waste
 +
| style="text-align: right;" | 611.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-1
+
| 2014
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,879.00 Bbl
+
| Produced Fluid
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-2
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2014-2
+
| 2014
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,307.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 3,186.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-04
+
| 2015
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 632.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 321.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 +
|-
 +
| 2015
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,693.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2015-05
+
| 2015
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 69.00 Bbl
 
| style="text-align: right;" | 69.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2015-06
+
| 2016
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 460.00 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 418.00 Bbl
| WMGR123SW005
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
| 2015-07
+
| 2016
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 575.00 Bbl
+
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 100.00 Bbl
| WMGR123SW005
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 
|-
 
|-
| 2015-08
+
| 2016
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 200.00 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 471.00 Bbl
| WMGR123SW005
 
|-
 
| 2015-09
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 294.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2015-10
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 321.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
| WMGR123NW011
 
|-
 
|-
| 2015-10
+
| 2016
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 125.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 2,473.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2015-11
+
| 2016
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 277.00 Bbl
+
 
 +
| style="text-align: right;" | 299.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2015-12
+
| 2016
| Produced Fluid (in Barrels)
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 130.00 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 295.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 245.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 200.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 500.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 393.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 433.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 271.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
|-
 
| 2016-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 108.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
|-
 
| 2016-09
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 305.00 Bbl
 
| style="text-align: right;" | 305.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2016-10
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 299.00 Bbl
+
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2016-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
|-
 
| 2016-12
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 418.00 Bbl
 
| style="text-align: right;" | 418.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
| WMGR123NW011
 
|-
 
|-
| 2017-01
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 531.00 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 1,519.00 Bbl
| WMGR123NW011
 
|-
 
| 2017-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-04
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 299.00 Bbl
+
 
 +
| style="text-align: right;" | 1,519.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-04
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 100.00 Bbl
+
| Produced Fluid
| STORAGE PENDING DISPOSAL OR REUSE
+
| style="text-align: right;" | 531.00 Bbl
|  
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
| 2017-05
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 302.00 Bbl
+
| Produced Fluid
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 1,291.00 Bbl
| PAS2D561BSOM
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 306.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 203.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 307.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 330.00 Bbl
 
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2017-10
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 440.00 Bbl
+
 
| STORAGE PENDING DISPOSAL OR REUSE
+
| style="text-align: right;" | 531.00 Bbl
|  
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
| 2017-11
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 110.00 Bbl
+
 
 +
| style="text-align: right;" | 201.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2017-12
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 210.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 408.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2018-01
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 303.00 Bbl
+
| Produced Fluid
| STORAGE PENDING DISPOSAL OR REUSE
+
| style="text-align: right;" | 409.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-02
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 102.00 Bbl
+
| Produced Fluid
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 203.00 Bbl
| PAS2D561BSOM
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-02
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 105.00 Bbl
+
| Produced Fluid
| STORAGE PENDING DISPOSAL OR REUSE
+
| style="text-align: right;" | 2,149.00 Bbl
|
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 306.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-04
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 205.00 Bbl
+
| Produced Fluid
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 2,867.00 Bbl
| PAS2D561BSOM
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 307.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 205.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 205.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 205.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 307.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 410.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 205.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 410.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| PAS2D561BSOM
Line 724: Line 576:
 
| 1929452
 
| 1929452
 
| Primary Facility
 
| Primary Facility
| 10/19/2010
+
| 2010-10-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 731: Line 583:
 
| 1929666
 
| 1929666
 
| Primary Facility
 
| Primary Facility
| 10/29/2010
+
| 2010-10-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 738: Line 590:
 
| 1932418
 
| 1932418
 
| Primary Facility
 
| Primary Facility
| 11/29/2010
+
| 2010-11-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 745: Line 597:
 
| 1948086
 
| 1948086
 
| Primary Facility
 
| Primary Facility
| 01/04/2011
+
| 2011-01-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Viol(s) Noted &  Immediately Corrected
 
| Viol(s) Noted &  Immediately Corrected
Line 752: Line 604:
 
| 1951476
 
| 1951476
 
| Primary Facility
 
| Primary Facility
| 01/14/2011
+
| 2011-01-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 759: Line 611:
 
| 1980393
 
| 1980393
 
| Primary Facility
 
| Primary Facility
| 04/12/2011
+
| 2011-04-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 766: Line 618:
 
| 1981907
 
| 1981907
 
| Primary Facility
 
| Primary Facility
| 05/10/2011
+
| 2011-05-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 773: Line 625:
 
| 1993531
 
| 1993531
 
| Primary Facility
 
| Primary Facility
| 06/20/2011
+
| 2011-06-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 780: Line 632:
 
| 2001250
 
| 2001250
 
| Primary Facility
 
| Primary Facility
| 07/22/2011
+
| 2011-07-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 787: Line 639:
 
| 2004549
 
| 2004549
 
| Primary Facility
 
| Primary Facility
| 08/03/2011
+
| 2011-08-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 794: Line 646:
 
| 2024651
 
| 2024651
 
| Primary Facility
 
| Primary Facility
| 10/19/2011
+
| 2011-10-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 801: Line 653:
 
| 2029936
 
| 2029936
 
| Primary Facility
 
| Primary Facility
| 12/28/2011
+
| 2011-12-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 808: Line 660:
 
| 2035525
 
| 2035525
 
| Primary Facility
 
| Primary Facility
| 12/21/2011
+
| 2011-12-21
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 815: Line 667:
 
| 2058959
 
| 2058959
 
| Primary Facility
 
| Primary Facility
| 03/08/2012
+
| 2012-03-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 822: Line 674:
 
| 2130544
 
| 2130544
 
| Primary Facility
 
| Primary Facility
| 01/10/2013
+
| 2013-01-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 829: Line 681:
 
| 2170034
 
| 2170034
 
| Primary Facility
 
| Primary Facility
| 05/29/2013
+
| 2013-05-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 836: Line 688:
 
| 2196039
 
| 2196039
 
| Primary Facility
 
| Primary Facility
| 08/13/2013
+
| 2013-08-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 843: Line 695:
 
| 2223706
 
| 2223706
 
| Primary Facility
 
| Primary Facility
| 11/19/2013
+
| 2013-11-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 850: Line 702:
 
| 2232628
 
| 2232628
 
| Primary Facility
 
| Primary Facility
| 12/27/2013
+
| 2013-12-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 857: Line 709:
 
| 2307843
 
| 2307843
 
| Primary Facility
 
| Primary Facility
| 09/29/2014
+
| 2014-09-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 901: Line 753:
 
| 604227
 
| 604227
 
| 01/04/2011
 
| 01/04/2011
| 01/04/2011
+
| 2011-01-04
 
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 925: Line 777:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
| 1
 
| 04/11/2011
 
| 04/11/2011
 
| style="text-align: right;" | 7177.00
 
| style="text-align: right;" | 4,642,470.0
 
| style="text-align: right;" |
 
|-
 
|}
 
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|- valign="top"
 
| rowspan="12"| 1
 
| rowspan="2"| Scale Inhibitor - Greenhib 677
 
| rowspan="2"| Pumpco Services
 
| rowspan="2"| Scale Inhibitor
 
|
 
|
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
|-
 
| Salt of phosphono-methylated diamine
 
|
 
| style="text-align: right;" | 25.00
 
| style="text-align: right;" | 0.07
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| Friction Reducer - Plexslick 921
 
| rowspan="2"| Pumpco Services
 
| rowspan="2"| Friction Reducer
 
|
 
|
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
|-
 
| Distillates, petroleum, hydrotreated light
 
| 64742-47-8
 
| style="text-align: right;" |
 
| style="text-align: right;" | 0.10
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="3"| Biocide - Plexcide 24L
 
| rowspan="3"| Pumpco Services
 
| rowspan="3"| Biocide
 
|
 
|
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
|-
 
| Sodium hydroxide
 
| 1310-73-2
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
|-
 
| Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione
 
| 533-74-4
 
| style="text-align: right;" | 24.00
 
| style="text-align: right;" | 0.02
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| Plexaid OS-30
 
| rowspan="2"| Pumpco Services
 
| rowspan="2"| Oxygen Scavenger
 
|
 
|
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
|-
 
| Ammonium bisulfite
 
| 10192-30-0
 
| style="text-align: right;" |
 
| style="text-align: right;" | 0.01
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| Sand (Proppant)
 
| rowspan="2"| Pumpco Services
 
| rowspan="2"| Propping Agent
 
| Quartz
 
| 14808-60-7
 
| style="text-align: right;" | 99.90
 
| style="text-align: right;" | 18.21
 
| style="text-align: right;" |
 
|-
 
|
 
|
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| Water
 
| rowspan="1"|
 
| rowspan="1"| Base Fluid
 
| Water
 
|
 
| style="text-align: right;" | 100.00
 
| style="text-align: right;" | 81.58
 
| style="text-align: right;" |
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =FracFocus Fracking Chemicals Database
 
| date = 2019-04-02
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-06-19 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 02:13, 2 June 2020

Well Details

Well ID: 37-013-20016
Loading map...
Country: United States
State: Pennsylvania
County: Blair
Municipality: Juniata Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 147456
Farm/Lease Name: LIGHTNER EAST UNIT 1H
License Status:
Spud Date: 2010-10-31
Permit Date: 2010-08-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.362608
Longitude: -78.549922

For data sources see[1][2][3]

Well History

Date Event
2010-08-10 New Permit Application
2010-11-20 Drilling Completion
2011-01-23 Performed Spud Operation
2011-04-11 Perforation
2012-07-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-04-11 2011-04-11 7,177 4,642,470

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor - Greenhib 677 Pumpco Services Scale Inhibitor
Salt of phosphono-methylated diamine 25.00 0.07
Friction Reducer - Plexslick 921 Pumpco Services Friction Reducer
Distillates, petroleum, hydrotreated light 64742-47-8 0.10
Biocide - Plexcide 24L Pumpco Services Biocide
Sodium hydroxide 1310-73-2
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione 533-74-4 24.00 0.02
Plexaid OS-30 Pumpco Services Oxygen Scavenger
Ammonium bisulfite 10192-30-0 0.01
Sand (Proppant) Pumpco Services Propping Agent Quartz 14808-60-7 99.90 18.21
Water Base Fluid Water 100.00 81.58

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 32,366.00 31 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 345,667.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 162,355.00 334 0.00 0 0.00 0
2015 LPR ENERGY LLC 135,164.69 315 0.00 0 0.00 0
2016 LPR ENERGY LLC 126,825.91 364 0.00 0 0.00 0
2017 LPR ENERGY LLC 123,598.00 356 0.00 0 0.00 0
2018 LPR ENERGY LLC 110,438.00 365 0.00 0 0.00 0
2019 LPR ENERGY LLC 111,230.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,143.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 335.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 64.61 Tons LANDFILL 101397
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 690.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 0.44 Tons LANDFILL 101397
2013 CHEVRON APPALACHIA LLC Produced Fluid 10,511.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 611.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 60.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 3,186.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 LPR ENERGY LLC Produced Fluid 321.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 LPR ENERGY LLC Produced Fluid 2,693.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 LPR ENERGY LLC Produced Fluid 69.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC Produced Fluid 418.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 LPR ENERGY LLC 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 LPR ENERGY LLC Produced Fluid 471.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 LPR ENERGY LLC Produced Fluid 2,473.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC 299.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 305.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC 418.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 1,519.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC 1,519.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 531.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 1,291.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 LPR ENERGY LLC 531.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC 201.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2018 LPR ENERGY LLC Produced Fluid 408.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2018 LPR ENERGY LLC Produced Fluid 409.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 203.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid 2,149.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019 LPR ENERGY LLC Produced Fluid 2,867.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1929452 Primary Facility 2010-10-19 Routine/Complete Inspection No Violations Noted
1929666 Primary Facility 2010-10-29 Routine/Complete Inspection No Violations Noted
1932418 Primary Facility 2010-11-29 Drilling/Alteration No Violations Noted Drilling completed Rig stacked on location
1948086 Primary Facility 2011-01-04 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
1951476 Primary Facility 2011-01-14 Routine/Complete Inspection No Violations Noted
1980393 Primary Facility 2011-04-12 Routine/Complete Inspection No Violations Noted
1981907 Primary Facility 2011-05-10 Routine/Complete Inspection No Violations Noted
1993531 Primary Facility 2011-06-20 Routine/Complete Inspection No Violations Noted
2001250 Primary Facility 2011-07-22 Routine/Complete Inspection No Violations Noted
2004549 Primary Facility 2011-08-03 Routine/Complete Inspection No Violations Noted
2024651 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted
2029936 Primary Facility 2011-12-28 Routine/Complete Inspection No Violations Noted
2035525 Primary Facility 2011-12-21 Routine/Complete Inspection No Violations Noted
2058959 Primary Facility 2012-03-08 Routine/Complete Inspection No Violations Noted
2130544 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted
2170034 Primary Facility 2013-05-29 Routine/Complete Inspection No Violations Noted
2196039 Primary Facility 2013-08-13 Routine/Complete Inspection No Violations Noted
2223706 Primary Facility 2013-11-19 Routine/Complete Inspection No Violations Noted
2232628 Primary Facility 2013-12-27 Routine/Complete Inspection No Violations Noted
2307843 Primary Facility 2014-09-29 Routine/Complete Inspection No Violations Noted
2468220 Primary Facility 2016-03-23 Site Restoration No Violations Noted
2688353 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted The weather is 22 Deg. F, cloudy and windy at time of inspection. Routine inspection of LPR Energy LLC., Lightner East Unit Pad, Well # 1H on January 30, 2018.

There is producing wells on this pad. Annulus is closed and not vented at time of inspection. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. DEP Representatives ¿ Ulyana Trynovich, Oil and Gas Inspector, Melissa S Herzing ¿ Water Quality Specialist.

2784108 Primary Facility 2018-10-01 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at LPR Energy's Lightner East Unit on October 1, 2018. There is one drilled and producing Marcellus well (013-20016) located on this partially reduced in size well pad. All areas surrounding the well pad are very well vegetated exceeding 70% uniform cover.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1948086 604227 01/04/2011 2011-01-04 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety Drilling mud and drill cuttings not properly cleaned up or contained on site.

For data sources see[8]

References