X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-21393"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-033-21393
 
| Well ID: 37-033-21393
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.737111, -78.711833 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.737111, -78.711833 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: KENNETH HARCHICK 2
 
| Farm/Lease Name: KENNETH HARCHICK 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 06/29/1982
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 6/8/1982
+
| Permit Date: 1982-06-08
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.737111
 
| Latitude: 40.737111
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1982-06-08
 +
| New Permit Application
 +
|-
 +
| 1982-06-29
 +
| Performed Spud Operation
 +
|-
 +
| 1982-07-16
 +
| Drilling Completion
 +
|-
 +
| 1982-07-16
 +
| Perforation
 +
|-
 +
| 1982-08-11
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 1986
 
| 1986
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 3,307.00
 
| style="text-align: right;" | 3,307.00
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987
 
| 1987
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 2,803.00
 
| style="text-align: right;" | 2,803.00
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988
 
| 1988
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 2,150.00
 
| style="text-align: right;" | 2,150.00
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989
 
| 1989
| [[ADOBE RESOURCES CORP]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 2,361.00
 
| style="text-align: right;" | 2,361.00
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991
 
| 1991
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 1547.00
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 1149.00
 +
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,006.00
+
| style="text-align: right;" | 1006
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,041.00
+
| style="text-align: right;" | 1041
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,422.00
+
| style="text-align: right;" | 1422
 
| style="text-align: right;" | 243
 
| style="text-align: right;" | 243
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 658.00
+
| style="text-align: right;" | 658
 
| style="text-align: right;" | 153
 
| style="text-align: right;" | 153
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,822.00
+
| style="text-align: right;" | 1822
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,403.00
+
| style="text-align: right;" | 1403
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 865.00
+
| style="text-align: right;" | 865
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 719.00
+
| style="text-align: right;" | 719
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 598.00
+
| style="text-align: right;" | 598
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 436.00
+
| style="text-align: right;" | 436
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 160.00
 
| style="text-align: right;" | 160.00
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 356.00
 
| style="text-align: right;" | 356.00
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 585.00
 
| style="text-align: right;" | 585.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 704.00
 
| style="text-align: right;" | 704.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 236: Line 320:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 245: Line 329:
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 254: Line 338:
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 263: Line 347:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 272: Line 356:
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 281: Line 365:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 290: Line 374:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 299: Line 383:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 308: Line 392:
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[GREYLOCK CONVENTIONAL LLC]]
 +
| style="text-align: right;" | 371.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 322: Line 415:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 327: Line 421:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1998-0
+
| 1998
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 333: Line 428:
 
| 0026310
 
| 0026310
 
|-
 
|-
| 2001-0
+
| 2001
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 339: Line 435:
 
| PAS2D032BARM
 
| PAS2D032BARM
 
|-
 
|-
| 2003-0
+
| 2003
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 345: Line 442:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2009-0
+
| 2009
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 370: Line 468:
 
| 378238
 
| 378238
 
| Primary Facility
 
| Primary Facility
| 05/23/1995
+
| 1995-05-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 405: Line 503:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 22:12, 22 May 2020

Well Details

Well ID: 37-033-21393
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Burnside Township
Operator Name: GREYLOCK CONVENTIONAL LLC
Well Pad ID:
Farm/Lease Name: KENNETH HARCHICK 2
License Status: ACTIVE
Spud Date:
Permit Date: 1982-06-08
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.737111
Longitude: -78.711833

For data sources see[1][2][3]

Well History

Date Event
1982-06-08 New Permit Application
1982-06-29 Performed Spud Operation
1982-07-16 Drilling Completion
1982-07-16 Perforation
1982-08-11 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 3,307.00 359 0.00 0 0.00 0
1987 2,803.00 358 0.00 0 0.00 0
1988 2,150.00 304 0.00 0 0.00 0
1989 2,361.00 358 0.00 0 0.00 0
1991 0.00 0 0.00 0 0.00 0
1994 ENERGY CORP OF AMER 1547.00 30 0.00 0 0.00 0
1995 ENERGY CORP OF AMER 1149.00 365 0.00 0 0.00 0
1996 ENERGY CORP OF AMER 1006 365 0.00 0 0.00 0
1997 ENERGY CORP OF AMER 1041 365 0.00 0 0.00 0
1998 ENERGY CORP OF AMER 1422 243 0.00 0 0.00 0
1999 ENERGY CORP OF AMER 658 153 0.00 0 0.00 0
2000 ENERGY CORP OF AMER 1822 366 0.00 0 0.00 0
2001 ENERGY CORP OF AMER 1403 365 0.00 0 0.00 0
2002 ENERGY CORP OF AMER 865 362 0.00 0 0.00 0
2003 ENERGY CORP OF AMER 719 352 0.00 0 0.00 0
2004 ENERGY CORP OF AMER 598 366 0.00 0 0.00 0
2005 ENERGY CORP OF AMER 436 334 0.00 0 0.00 0
2006 ENERGY CORP OF AMER 160.00 325 0.00 0 0.00 0
2007 ENERGY CORP OF AMER 356.00 351 0.00 0 0.00 0
2008 ENERGY CORP OF AMER 585.00 365 0.00 0 0.00 0
2009 ENERGY CORP OF AMER 704.00 365 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 545.00 365 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 562.00 354 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 699.00 351 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 477.00 365 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 409.00 359 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 357.00 365 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 349.00 366 0.00 0 0.00 0
2017 GREYLOCK CONVENTIONAL LLC 280.00 365 0.00 0 0.00 0
2018 GREYLOCK CONVENTIONAL LLC 280.00 303 0.00 0 0.00 0
2019 GREYLOCK CONVENTIONAL LLC 371.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1998 ENERGY CORP OF AMER Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt 0026310
2001 ENERGY CORP OF AMER Brine 80.00 Bbl Injection Disposal Well PAS2D032BARM
2003 ENERGY CORP OF AMER Brine 40.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 ENERGY CORP OF AMER Brine 70.00 Bbl Municipal Sewage Treatment Plant PA0026310

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
378238 Primary Facility 1995-05-23 Routine/Complete Inspection No Violations Noted OPERATING; E&S OK

For data sources see[7]

References