X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-031-24603"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-031-24603
 
| Well ID: 37-031-24603
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.090957, -79.568832 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.090957, -79.568832 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 2007-09-28
+
| Spud Date: 2007-10-01
 
|-
 
|-
 
| Permit Date: 2007-02-21
 
| Permit Date: 2007-02-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.090957
 
| Latitude: 41.090957
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2007-02-21
 +
| New Permit Application
 +
|-
 +
| 2007-09-28
 +
| Performed Spud Operation
 +
|-
 +
| 2007-10-10
 +
| Drilling Completion
 +
|-
 +
| 2008-09-23
 +
| Perforation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2008-09-23
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2011-03-25
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 128:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 1
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 2
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 3
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 4
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 5
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 6
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 7
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-23
 +
| style="text-align: right;" | 8
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 141: Line 267:
 
| 2013
 
| 2013
 
| [[INTERSTATE GAS MKT INC]]
 
| [[INTERSTATE GAS MKT INC]]
| style="text-align: right;" | 107.90
+
| style="text-align: right;" | 107.9
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 225: Line 351:
 
| 2010
 
| 2010
 
| [[INTERSTATE GAS MKT INC]]
 
| [[INTERSTATE GAS MKT INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 232: Line 358:
 
| 2012
 
| 2012
 
| [[INTERSTATE GAS MKT INC]]
 
| [[INTERSTATE GAS MKT INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE

Latest revision as of 18:09, 22 May 2020

Well Details

Well ID: 37-031-24603
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Toby Township
Operator Name: PA MINERAL SVCS LLC
Well Pad ID:
Farm/Lease Name: C & K 6
License Status: Active
Spud Date: 2007-10-01
Permit Date: 2007-02-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.090957
Longitude: -79.568832

For data sources see[1][2][3]

Well History

Date Event
2007-02-21 New Permit Application
2007-09-28 Performed Spud Operation
2007-10-10 Drilling Completion
2008-09-23 Perforation
2008-09-23 Performed Stage 1 of Stimulation
2008-09-23 Performed Stage 2 of Stimulation
2008-09-23 Performed Stage 3 of Stimulation
2008-09-23 Performed Stage 4 of Stimulation
2008-09-23 Performed Stage 5 of Stimulation
2008-09-23 Performed Stage 6 of Stimulation
2008-09-23 Performed Stage 7 of Stimulation
2008-09-23 Performed Stage 8 of Stimulation
2011-03-25 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2008-09-23 1 SAND 0 0 0
2008-09-23 2 SAND 0 0 0
2008-09-23 3 SAND 0 0 0
2008-09-23 4 SAND 0 0 0
2008-09-23 5 SAND 0 0 0
2008-09-23 6 SAND 0 0 0
2008-09-23 7 SAND 0 0 0
2008-09-23 8 SAND 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 INTERSTATE GAS MKT INC 0.00 0 0.00 0 0.00 0
2008 INTERSTATE GAS MKT INC 235.23 60 0.00 0 0.00 0
2009 INTERSTATE GAS MKT INC 0.00 0 0.00 0 0.00 0
2010 INTERSTATE GAS MKT INC 719.97 300 0.00 0 0.00 0
2011 INTERSTATE GAS MKT INC 42.00 305 0.00 0 0.00 0
2012 INTERSTATE GAS MKT INC 398.00 360 0.00 0 0.00 0
2013 INTERSTATE GAS MKT INC 107.9 365 0.00 0 0.00 0
2014 INTERSTATE GAS MKT INC 302.00 180 0.00 0 0.00 0
2015 INTERSTATE GAS MKT INC 495.00 365 0.00 0 0.00 0
2016 INTERSTATE GAS MKT INC 223.00 365 0.00 0 0.00 0
2017 INTERSTATE GAS MKT INC 145.00 365 0.00 0 0.00 0
2018 INTERSTATE GAS MKT INC 234.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 INTERSTATE GAS MKT INC Fracking Fluid 830.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2009 INTERSTATE GAS MKT INC Brine 180.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2010 INTERSTATE GAS MKT INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 INTERSTATE GAS MKT INC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1657747 Primary Facility 2007-10-12 Drilling/Alteration No Violations Noted
1661133 Primary Facility 2007-10-12 Routine/Complete Inspection No Violations Noted
2526455 Primary Facility 2016-10-11 Administrative/File Review No Violations Noted

For data sources see[8]

References