If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-019-22222 | | Well ID: 37-019-22222 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.789772, -79.851444 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: VESELICH B UNIT 5H | | Farm/Lease Name: VESELICH B UNIT 5H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2014-02-24 | | Permit Date: 2014-02-24 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.789772 | | Latitude: 40.789772 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2014-02-24 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2014-03-28 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2014-06-25 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2015-01-28 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2015-07-15 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 92: | ||
| 2015-03-11 | | 2015-03-11 | ||
| 2015-03-29 | | 2015-03-29 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 6,093 |
− | | style="text-align: right;" | 8,564,360 | + | | style="text-align: right;" | 8,564,360 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 252: | Line 282: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 310: | Line 351: | ||
| 2019 | | 2019 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 477,873.66 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 317 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 103.07 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 62 |
|- | |- | ||
|} | |} | ||
Line 335: | Line 376: | ||
| 2014 | | 2014 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 1,251.66 Tons | | style="text-align: right;" | 1,251.66 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 342: | Line 383: | ||
| 2015 | | 2015 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 823.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-133-21076 |
|- | |- | ||
| 2015 | | 2015 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 16,357.00 Bbl | | style="text-align: right;" | 16,357.00 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
Line 356: | Line 397: | ||
| 2015 | | 2015 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,455.70 Bbl | | style="text-align: right;" | 1,455.70 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 363: | Line 404: | ||
| 2015 | | 2015 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid ( | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 517.40 Bbl |
− | | | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) |
− | | | + | | WMGR123SW005 |
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,078.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 90.00 Bbl | | style="text-align: right;" | 90.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 377: | Line 425: | ||
| 2016 | | 2016 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 2,665.80 Bbl | | style="text-align: right;" | 2,665.80 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
Line 391: | Line 432: | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 90.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | 34-133-21076 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 374.00 Bbl | | style="text-align: right;" | 374.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 405: | Line 446: | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,891.00 Bbl | | style="text-align: right;" | 1,891.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 412: | Line 453: | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 342.50 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-133- | + | | 34-133-24189 |
|- | |- | ||
| 2018 | | 2018 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 2,061.00 Bbl | | style="text-align: right;" | 2,061.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 426: | Line 467: | ||
| 2019 | | 2019 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | 1, | + | | style="text-align: right;" | 235.00 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-21076 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,179.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24096 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,743.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NW009 | | WMGR123NW009 | ||
Line 433: | Line 488: | ||
| 2019 | | 2019 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 372.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-133- | + | | 34-133-24189 |
|- | |- | ||
|} | |} |
Well ID: 37-019-22222 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.789772,"lon":-79.851444,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Jefferson Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 150950 | |
Farm/Lease Name: VESELICH B UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-02-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.789772 | |
Longitude: -79.851444 |
Date | Event |
---|---|
2014-02-24 | New Permit Application |
2014-03-28 | Performed Spud Operation |
2014-06-25 | Drilling Completion |
2015-01-28 | Perforation |
2015-07-15 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-11 | 2015-03-29 | 6,093 | 8,564,360 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Polyethylene Glycol | 25322-68-3 | 50 | 0.00492015 | 3927.37 |
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000173083 | 138.159 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000495 | 3.947 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.000296714 | 236.844 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000495 | 3.947 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00196806 | 1570.95 | ||||
Thiourea | 62-56-6 | 1 | 0.00000495 | 3.947 | ||||
Other - (non-hazardous) | NA | 30 | 0.00295209 | 2356.42 | ||||
Methanol | 67-56-1 | 5 | 0.00002473 | 19.737 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.5361 | 71,469,600.0 | |
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0479114 | 38243.9 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0205335 | 16390.2 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0193585 | 15452.4 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0170355 | 13598.1 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.04104 | 32759 | ||||
Other - (non-hazardous) | NA | 92.5 | 0.95502 | 762317 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 9.28553 | 7,411,900.0 | |
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0021239 | 1695.34 | |
Other - (non-hazardous) | NA | 85 | 0.0481416 | 38427.7 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.00186903 | 1491.9 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.00450266 | 3594.12 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.00732689 | 5848.48 | |
Ethylene Glycol | 107-21-1 | 30 | 0.0031401 | 2506.49 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 442,150.00 | 217 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 388,068.00 | 256 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 318,822.00 | 233 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 311,388.38 | 278 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 477,873.66 | 317 | 0.00 | 0 | 103.07 | 62 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 1,251.66 Tons | LANDFILL | 100403 |
2015 | XTO ENERGY INC | Produced Fluid | 823.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 16,357.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 1,455.70 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 517.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 1,078.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 2,665.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 374.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,891.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 342.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 2,061.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 235.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 1,179.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,743.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 372.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2258495 | Primary Facility | 2014-04-01 | Drilling/Alteration | No Violations Noted | |
2261790 | Primary Facility | 2014-04-11 | Drilling/Alteration | No Violations Noted | |
2281877 | Primary Facility | 2014-06-25 | Routine/Partial Inspection | No Violations Noted | |
2338790 | Primary Facility | 2015-01-16 | Routine/Partial Inspection | No Violations Noted | |
2345008 | Primary Facility | 2015-02-13 | Routine/Partial Inspection | No Violations Noted | |
2383564 | Primary Facility | 2015-06-11 | Routine/Partial Inspection | No Violations Noted | |
2693226 | Primary Facility | 2018-02-12 | Routine/Partial Inspection | No Violations Noted | On 2/12/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Access road maintained. Three wells properly tagged and in production. Three 400 bbl production fluid tanks installed within stainless steel secondary containment structure. No apparent issues. |
For data sources see[8]