If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-019-22025 | | Well ID: 37-019-22025 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.760458, -80.087081 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: BAILLIE TRUST UNIT 4H | | Farm/Lease Name: BAILLIE TRUST UNIT 4H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2013-01-29 | | Permit Date: 2013-01-29 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.760458 | | Latitude: 40.760458 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2013-01-29 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2013-04-15 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2013-05-14 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2013-09-20 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-20 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 92: | ||
| 2013-09-25 | | 2013-09-25 | ||
| 2013-10-18 | | 2013-10-18 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 5,586 |
− | | style="text-align: right;" | 6,363, | + | | style="text-align: right;" | 6,363,000 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
|- | |- | ||
Line 262: | Line 292: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 329: | Line 370: | ||
| 2019 | | 2019 | ||
| [[PENNENERGY RESOURCES LLC]] | | [[PENNENERGY RESOURCES LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 316,731.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 361 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
| style="text-align: right;" | 206.00 | | style="text-align: right;" | 206.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 62 |
|- | |- | ||
|} | |} | ||
Line 354: | Line 395: | ||
| 2013 | | 2013 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | 1, | + | | style="text-align: right;" | 1,485.00 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21438 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[RE GAS DEV LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 553.35 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-155-23223 |
|- | |- | ||
| 2013 | | 2013 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 130.00 Bbl | | style="text-align: right;" | 130.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 368: | Line 416: | ||
| 2013 | | 2013 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | | + | | Drill Cuttings |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 865.13 Tons |
− | | | + | | LANDFILL |
− | | | + | | 100585 |
|- | |- | ||
| 2013 | | 2013 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 258.77 Bbl | | style="text-align: right;" | 258.77 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 382: | Line 430: | ||
| 2013 | | 2013 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,095.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-151-21179 |
|- | |- | ||
| 2013 | | 2013 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 105.00 Bbl | | style="text-align: right;" | 105.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 396: | Line 444: | ||
| 2013 | | 2013 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 471.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-21447 |
|- | |- | ||
− | | | + | | 2014 |
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 840.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-155-21438 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 210.00 Bbl | | style="text-align: right;" | 210.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 417: | Line 465: | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 60.00 Bbl | | style="text-align: right;" | 60.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 431: | Line 472: | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 105.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-031-27178 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,401.71 Bbl |
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
− | | | + | | 3192 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 105.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-155-24076 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 958.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-151-21179 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 435.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-007-21847 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 615.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-21447 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,696.00 Bbl | | style="text-align: right;" | 1,696.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 480: | Line 521: | ||
| 2014 | | 2014 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 105.00 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-24075 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RE GAS DEV LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 105.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-24063 |
|- | |- | ||
| 2015 | | 2015 | ||
− | | | + | | [[RE GAS DEV LLC]] |
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 210.00 Bbl | | style="text-align: right;" | 210.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 493: | Line 541: | ||
|- | |- | ||
| 2015 | | 2015 | ||
− | | | + | | [[RE GAS DEV LLC]] |
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 1,162.00 Bbl | | style="text-align: right;" | 1,162.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 507: | Line 548: | ||
|- | |- | ||
| 2015 | | 2015 | ||
− | | | + | | [[RE GAS DEV LLC]] |
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 105.00 Bbl | | style="text-align: right;" | 105.00 Bbl | ||
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
− | | | + | | 2014-553 |
|- | |- | ||
| 2015 | | 2015 | ||
− | | | + | | [[RE GAS DEV LLC]] |
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 300.00 Bbl | | style="text-align: right;" | 300.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 521: | Line 562: | ||
|- | |- | ||
| 2015 | | 2015 | ||
− | | | + | | [[RE GAS DEV LLC]] |
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 894.00 Bbl | | style="text-align: right;" | 894.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 529: | Line 570: | ||
| 2016 | | 2016 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 205.00 Bbl | | style="text-align: right;" | 205.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 536: | Line 577: | ||
| 2016 | | 2016 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 675.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-007-21847 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 925.00 Bbl | | style="text-align: right;" | 925.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 550: | Line 591: | ||
| 2016 | | 2016 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 440.00 Bbl |
− | | | + | | REUSE OTHER THAN ROAD SPREADING |
− | | | + | | |
|- | |- | ||
| 2017 | | 2017 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 90.00 Bbl | | style="text-align: right;" | 90.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 564: | Line 605: | ||
| 2017 | | 2017 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
+ | | style="text-align: right;" | 195.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RE GAS DEV LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 880.00 Bbl | | style="text-align: right;" | 880.00 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 571: | Line 619: | ||
| 2017 | | 2017 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 1,715.00 Bbl | | style="text-align: right;" | 1,715.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 585: | Line 626: | ||
| 2018 | | 2018 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 1,025.00 Bbl | | style="text-align: right;" | 1,025.00 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 599: | Line 633: | ||
| 2018 | | 2018 | ||
| [[RE GAS DEV LLC]] | | [[RE GAS DEV LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 735.00 Bbl | | style="text-align: right;" | 735.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 606: | Line 640: | ||
| 2018 | | 2018 | ||
| [[PENNENERGY RESOURCES LLC]] | | [[PENNENERGY RESOURCES LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 100.00 Bbl | | style="text-align: right;" | 100.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-155-23223 | | 34-155-23223 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RE GAS DEV LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 110.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-24079 | ||
|- | |- | ||
| 2019 | | 2019 | ||
| [[PENNENERGY RESOURCES LLC]] | | [[PENNENERGY RESOURCES LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 98.90 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-23795 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENNENERGY RESOURCES LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 27.04 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENNENERGY RESOURCES LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 302.10 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-23223 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENNENERGY RESOURCES LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 795.13 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
Line 620: | Line 682: | ||
| 2019 | | 2019 | ||
| [[PENNENERGY RESOURCES LLC]] | | [[PENNENERGY RESOURCES LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 37.10 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21893 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENNENERGY RESOURCES LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 117.14 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-155-23196 | | 34-155-23196 | ||
Line 627: | Line 696: | ||
| 2019 | | 2019 | ||
| [[PENNENERGY RESOURCES LLC]] | | [[PENNENERGY RESOURCES LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 119.30 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-22403 |
|- | |- | ||
|} | |} |
Well ID: 37-019-22025 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.760458,"lon":-80.087081,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Jackson Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 144590 | |
Farm/Lease Name: BAILLIE TRUST UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-01-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.760458 | |
Longitude: -80.087081 |
Date | Event |
---|---|
2013-01-29 | New Permit Application |
2013-04-15 | Performed Spud Operation |
2013-05-14 | Drilling Completion |
2013-09-20 | Perforation |
2014-08-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-25 | 2013-10-18 | 5,586 | 6,363,000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | Vertex | Proppant | Silica Sand | 14808-60-7 | 100 | 10.4106 | 0 |
Water | Rex | Base Fluid | Water | 7732-18-5 | 100 | 87.9424 | 0 | |
FE-100L | ICI | Iron Control | Citric Acid | 77-92-9 | 55 | 0.00269 | 0 | |
Acid | FTS | Acidizing | Hydrochloric Acid | 007647-01-0 | 7.5 | 0.11142 | 0 | |
HVG-1 | FTS | Gel | Petroleum Distillate | 64742-47-8 | 50 | 0.00111 | 0 | |
Surfactant | 68439-51-0 | 2.5 | 0.00006000 | 0 | ||||
Clay | 14808-60-7 | 2.5 | 0.00006000 | 0 | ||||
Guar Gum | 9000-30-0 | 45 | 0.001 | 0 | ||||
ICI-3240 | ICI | Bacteriacide | Sodium Hydroxide | 1310-73-2 | 4 | 0.00189 | 0 | |
Dazomet | 533-74-4 | 24 | 0.01136 | 0 | ||||
FRW-200W | ICI | Friction Reducer | Ethylene Glycol | 107-21-1 | 4 | 0.00227 | 0 | |
Petroleum Distillate | 64742-47-8 | 30 | 0.01703 | 0 | ||||
CS-500 SI | ICI | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 10 | 0.00461 | 0 | |
NE-100L | ICI | Non-Emulsifier | 2-Propanol | 67-63-0 | 10 | 0.00014 | 0 | |
Dodecylbenzenesulfonic Acid | 27176-87-0 | 5 | 0.00007000 | 0 | ||||
2-Butoxyethenol | 111-76-2 | 10 | 0.00014 | 0 | ||||
APB-1 | FTS | Breaker | Ammonium Persulfate | 7727-54-0 | 95 | 0.00004000 | 0 | |
CI-150L | ICI | Corrosion Inhibitor | Quaternary Ammonium Compound | Proprietary | 5 | 0.00013 | 0 | |
Aromatic Aldehyde | Proprietary | 5 | 0.00013 | 0 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.00025 | 0 | ||||
Organic Amine Resin Salt | Proprietary | 10 | 0.00025 | 0 | ||||
Isopropanol | 67-63-0 | 30 | 0.00076 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | RE GAS DEV LLC | 94,842.44 | 35 | 0.00 | 0 | 136.94 | 35 |
2014 | RE GAS DEV LLC | 708,480.78 | 365 | 559.12 | 184 | 974.00 | 181 |
2015 | RE GAS DEV LLC | 526,698.85 | 357 | 0.00 | 0 | 426.65 | 328 |
2016 | RE GAS DEV LLC | 471,372.21 | 363 | 0.00 | 0 | 122.00 | 363 |
2017 | RE GAS DEV LLC | 442,904.72 | 360 | 0.00 | 0 | 67.40 | 237 |
2018 | PENNENERGY RESOURCES LLC | 354,459.22 | 360 | 0.00 | 0 | 48.55 | 208 |
2019 | PENNENERGY RESOURCES LLC | 316,731.00 | 361 | 0.00 | 0 | 206.00 | 62 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | RE GAS DEV LLC | Produced Fluid | 1,485.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | RE GAS DEV LLC | Produced Fluid | 553.35 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | RE GAS DEV LLC | Produced Fluid | 130.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2013 | RE GAS DEV LLC | Drill Cuttings | 865.13 Tons | LANDFILL | 100585 |
2013 | RE GAS DEV LLC | Produced Fluid | 258.77 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2013 | RE GAS DEV LLC | Produced Fluid | 1,095.00 Bbl | INJECTION DISPOSAL WELL | 34-151-21179 |
2013 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
2013 | RE GAS DEV LLC | Produced Fluid | 471.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | RE GAS DEV LLC | Produced Fluid | 840.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | RE GAS DEV LLC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | RE GAS DEV LLC | Produced Fluid | 60.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27178 |
2014 | RE GAS DEV LLC | Produced Fluid | 1,401.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2014 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24076 |
2014 | RE GAS DEV LLC | Produced Fluid | 958.00 Bbl | INJECTION DISPOSAL WELL | 34-151-21179 |
2014 | RE GAS DEV LLC | Produced Fluid | 435.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2014 | RE GAS DEV LLC | Produced Fluid | 615.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | RE GAS DEV LLC | Produced Fluid | 1,696.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24075 |
2015 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2015 | RE GAS DEV LLC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24076 |
2015 | RE GAS DEV LLC | Produced Fluid | 1,162.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2015 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-553 |
2015 | RE GAS DEV LLC | Produced Fluid | 300.00 Bbl | INJECTION DISPOSAL WELL | 34-151-21179 |
2015 | RE GAS DEV LLC | Produced Fluid | 894.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | RE GAS DEV LLC | Produced Fluid | 205.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RE GAS DEV LLC | Produced Fluid | 675.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | RE GAS DEV LLC | Produced Fluid | 925.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2016 | RE GAS DEV LLC | Produced Fluid | 440.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | RE GAS DEV LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2017 | RE GAS DEV LLC | Produced Fluid | 195.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RE GAS DEV LLC | Produced Fluid | 880.00 Bbl | REUSE (AT WELL PAD) | |
2017 | RE GAS DEV LLC | Produced Fluid | 1,715.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | RE GAS DEV LLC | Produced Fluid | 1,025.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Produced Fluid | 735.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | RE GAS DEV LLC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 98.90 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 27.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 302.10 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 795.13 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 37.10 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 117.14 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 119.30 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2157238 | Primary Facility | 2013-04-12 | Routine/Partial Inspection | No Violations Noted | |
2157411 | Primary Facility | 2013-04-15 | Drilling/Alteration | No Violations Noted | |
2166064 | Primary Facility | 2013-05-08 | Routine/Partial Inspection | No Violations Noted | |
2247447 | Primary Facility | 2014-02-13 | Routine/Partial Inspection | No Violations Noted | |
2275580 | Primary Facility | 2014-06-02 | Routine/Partial Inspection | No Violations Noted | |
2299943 | Primary Facility | 2014-08-29 | Routine/Partial Inspection | No Violations Noted | |
2654762 | Primary Facility | 2017-10-26 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well appears to be producing. Well integrity is in good condition, with no signs of any leaks or spills at the site. The wellhead has very minor rust on it which is superficial. A gauge for casing was reading 295 psi. Cellar was filled with gravel. No water present. The well is properly labeled. The Emergency Response sign remains posted at the lease access entrance. There is a tank for condensate and one for water for each well on the pad contained in an earthen dike (12 total). There are 6 line heaters also present. A gas buster is hooked up as well. Pad is fenced in. |
2683194 | Primary Facility | 2018-01-17 | Routine/Complete Inspection | No Violations Noted | On 1/17/2018, WQS Brian MacQuarrie onsite. Site sign posted at access road entrance. Well pad fenced in and locked. Six wells tagged and in production. Twelve 400 bbl tanks ( six production fluids and six condensate) and six GPUs installed within stainless steel secondary containment. Snow on ground during inspection. No apparent issues. |
2787482 | Primary Facility | 2018-10-11 | Site Restoration | No Violations Noted | On 10/11/2018, WQS Brian MacQuarrie onsite for the purpose of conducting a Notice of Termination inspection for ESCGP ESX13-019-0002. Site consists of six producing wells; 1H-019-22023, 2H-019-22024, 4H-019-22025, 3H-019-22030, 5HB-019-22026 and 6HB-019-22067. Tank battery consists of twelve 400 bbl tanks installed within containment. The well site has achieved permanent stabilization according to 25 Pa Code 102.22(a)(2). Therefore, the Notice of Termination request is approved. |
For data sources see[8]