If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: | + | | Well ID: 37-005-30652 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.882947, -79.555619 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Armstrong_County,_Pennsylvania|Armstrong]] |
|- | |- | ||
− | | Municipality: [[East Franklin Township, | + | | Municipality: [[East Franklin Township,_Armstrong_County,_Pennsylvania|East Franklin Township]] |
|- | |- | ||
− | | Operator Name: [[MDS ENERGY | + | | Operator Name: [[MDS ENERGY DEV LLC]] |
+ | |- | ||
+ | | Well Pad ID: [[147335]] | ||
|- | |- | ||
| Farm/Lease Name: MATTHEW ANTHONY 3M-86 | | Farm/Lease Name: MATTHEW ANTHONY 3M-86 | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2010-06-02 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Vertical Well |
|- | |- | ||
− | | | + | | Conservation: Yes |
|- | |- | ||
| Latitude: 40.882947 | | Latitude: 40.882947 | ||
|- | |- | ||
| Longitude: -79.555619 | | Longitude: -79.555619 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-06-02 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-06-17 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2011-07-11 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | style="text-align: right;" | 25,172.00 | ||
+ | | style="text-align: right;" | 65 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | style="text-align: right;" | 52,564.00 | ||
+ | | style="text-align: right;" | 359 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | style="text-align: right;" | 30,838.00 | ||
+ | | style="text-align: right;" | 363 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | style="text-align: right;" | 22,254.00 | ||
+ | | style="text-align: right;" | 362 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | style="text-align: right;" | 17,697.00 | ||
+ | | style="text-align: right;" | 342 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | style="text-align: right;" | 10,488.00 | ||
+ | | style="text-align: right;" | 280 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | style="text-align: right;" | 16,785.00 | ||
+ | | style="text-align: right;" | 342 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | style="text-align: right;" | 12,476.00 | ||
+ | | style="text-align: right;" | 353 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | style="text-align: right;" | 10,417.00 | ||
+ | | style="text-align: right;" | 343 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 95.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21893 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 224.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0254185 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 2,265.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-22523 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 80.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21447 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 212.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW008 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 80.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-23584 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 32.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21438 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 77.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21447 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[MDS ENERGY LTD]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 74.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 48.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | EPA ID: 748-163 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 48.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | EPA ID: 748-163 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[MDS ENERGY DEV LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 86.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-23223 | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | == | + | | title =Oil and Gas Waste Reports |
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1894017 | | 1894017 | ||
+ | | Primary Facility | ||
| 2010-06-16 | | 2010-06-16 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| spud called no rig, checked E & S plan | | spud called no rig, checked E & S plan | ||
− | |||
− | |||
|- | |- | ||
| 1894019 | | 1894019 | ||
+ | | Primary Facility | ||
| 2010-06-22 | | 2010-06-22 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Checked casing and cementing plan | | Checked casing and cementing plan | ||
− | |||
− | |||
|- | |- | ||
| 1896352 | | 1896352 | ||
+ | | Primary Facility | ||
| 2010-06-28 | | 2010-06-28 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Well is drilled but not equipped. Pit is on-site / in sound condition. Site ID sign and E&S plan located. There is no erosion and /or sedimentation noted on the well site or access road. | | Well is drilled but not equipped. Pit is on-site / in sound condition. Site ID sign and E&S plan located. There is no erosion and /or sedimentation noted on the well site or access road. | ||
− | |||
− | |||
|- | |- | ||
| 2026815 | | 2026815 | ||
+ | | Primary Facility | ||
| 2011-12-14 | | 2011-12-14 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Well operating and properly identified. | | Well operating and properly identified. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2041013 | | 2041013 | ||
+ | | Primary Facility | ||
| 2012-02-08 | | 2012-02-08 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded and mulched. The Department recommends that the operator monitor the site to insure 70% uniform vegetative cover is achieved. There was no accelerated erosion or sedimentation observed in relation to the access road or well-site. The Department recommends that the operator implement either a swale with erosion control matting which will grow into a grass lined swale or a rock stabilized outlet associated with the culvert conveying runoff under the access road as it approaches the well head. Additionally it was noted that a freshwater impoundment located above the well pad on a separate access road that is also associated with well | + | | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded and mulched. The Department recommends that the operator monitor the site to insure 70% uniform vegetative cover is achieved. There was no accelerated erosion or sedimentation observed in relation to the access road or well-site. The Department recommends that the operator implement either a swale with erosion control matting which will grow into a grass lined swale or a rock stabilized outlet associated with the culvert conveying runoff under the access road as it approaches the well head. Additionally it was noted that a freshwater impoundment located above the well pad on a separate access road that is also associated with well 005-30164. This freshawater impoundment is associated with and was constructed for well development activities for the 005-30652 Matthew Anthony 3M-86 well. |
− | |||
− | |||
|- | |- | ||
| 2131621 | | 2131621 | ||
+ | | Primary Facility | ||
| 2013-01-17 | | 2013-01-17 | ||
+ | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| Drilling was completed on 06/15/11, well appeared to be equipped for production. Well-site had been regraded and vegetation appeared to have begun to take hold. An impoundment was located in conjucntion with this well that as per the operator contained freshwater, precipitation and snow melt. This impoundment had more than the required two feet of lined freeboard. | | Drilling was completed on 06/15/11, well appeared to be equipped for production. Well-site had been regraded and vegetation appeared to have begun to take hold. An impoundment was located in conjucntion with this well that as per the operator contained freshwater, precipitation and snow melt. This impoundment had more than the required two feet of lined freeboard. | ||
− | |||
|- | |- | ||
− | | | + | | 2185985 |
− | + | | Primary Facility | |
− | + | | 2013-07-22 | |
− | + | | Compliance Evaluation | |
− | + | | No Violations Noted | |
− | + | | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Freshwater impoundment had been regraded and the vegetative cover met the 70% uniform coverage criteria. | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2293467 |
− | | | + | | Primary Facility |
− | | | + | | 2014-08-07 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | + | | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. | |
− | |||
|- | |- | ||
+ | | 2436544 | ||
+ | | Primary Facility | ||
+ | | 2015-12-28 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well is tagged-in production. Annulus plumbed to vent stack-open. Equipment-100 bbl tank-meter set OK. | ||
|- | |- | ||
− | | | + | | 2511161 |
− | | | + | | Primary Facility |
− | | | + | | 2016-08-17 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | + | | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. | |
− | |||
|- | |- | ||
+ | | 2583501 | ||
+ | | Primary Facility | ||
+ | | 2017-04-17 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well tagged-on-annulus open. Well head casing-production set equipment-grounded 100 bbl fiberglass tank look ok. | ||
|- | |- | ||
− | | | + | |} |
− | | | + | ==== Violations Commited ==== |
− | | | + | {| class="wikitable sortable" width="95%" |
− | + | !scope="col" | Inspection ID | |
− | + | !scope="col" | Violation ID | |
− | + | !scope="col" | Violation Date | |
− | + | !scope="col" | Date Resolved | |
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
|- | |- | ||
− | | | + | | 2131621 |
− | | | + | | 658163 |
− | | | + | | 01/17/2013 |
− | | | + | | 2013-01-17 |
− | + | | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | |
− | | | + | | Administrative |
− | | | + | | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
− | == | + | ==== Penalties Applied ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Penalty ID |
− | + | !scope="col" | Penalty Code | |
− | !scope="col" | | + | !scope="col" | Penalty Status |
− | !scope="col" | | + | !scope="col" | Penalty Date |
− | !scope="col" | | + | !scope="col" | Enforcement Date |
− | !scope="col" | | + | !scope="col" | Penalty Amount |
− | !scope="col" | | + | !scope="col" | Amount Collected |
− | !scope="col" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 658163 |
− | | | + | | 292886 |
− | | | + | | NOV - Notice of Violation |
− | + | | Comply/Closed | |
− | | | + | | |
− | | | + | | 2013-07-22 |
− | | | + | | style="text-align: right;" | |
− | + | | style="text-align: right;" | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-005-30652 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.882947,"lon":-79.555619,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 147335 | |
Farm/Lease Name: MATTHEW ANTHONY 3M-86 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.882947 | |
Longitude: -79.555619 |
Date | Event |
---|---|
2010-06-02 | New Permit Application |
2010-06-17 | Performed Spud Operation |
2011-07-11 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | MDS ENERGY LTD | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | MDS ENERGY LTD | 25,172.00 | 65 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 52,564.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 30,838.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 22,254.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 17,697.00 | 342 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 10,488.00 | 280 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 16,785.00 | 342 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 12,476.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 10,417.00 | 343 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | MDS ENERGY LTD | Fracing Fluid Waste | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2011 | MDS ENERGY LTD | Fracing Fluid Waste | 224.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | MDS ENERGY LTD | Fracing Fluid Waste | 2,265.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2012 | MDS ENERGY LTD | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2012 | MDS ENERGY LTD | Produced Fluid | 212.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | MDS ENERGY LTD | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2013 | MDS ENERGY LTD | Produced Fluid | 32.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | MDS ENERGY LTD | Produced Fluid | 77.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | MDS ENERGY LTD | Produced Fluid | 74.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 48.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 48.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2018 | MDS ENERGY DEV LLC | Produced Fluid | 86.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1894017 | Primary Facility | 2010-06-16 | Drilling/Alteration | No Violations Noted | spud called no rig, checked E & S plan |
1894019 | Primary Facility | 2010-06-22 | Drilling/Alteration | No Violations Noted | Checked casing and cementing plan |
1896352 | Primary Facility | 2010-06-28 | Routine/Complete Inspection | No Violations Noted | Well is drilled but not equipped. Pit is on-site / in sound condition. Site ID sign and E&S plan located. There is no erosion and /or sedimentation noted on the well site or access road. |
2026815 | Primary Facility | 2011-12-14 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2041013 | Primary Facility | 2012-02-08 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded and mulched. The Department recommends that the operator monitor the site to insure 70% uniform vegetative cover is achieved. There was no accelerated erosion or sedimentation observed in relation to the access road or well-site. The Department recommends that the operator implement either a swale with erosion control matting which will grow into a grass lined swale or a rock stabilized outlet associated with the culvert conveying runoff under the access road as it approaches the well head. Additionally it was noted that a freshwater impoundment located above the well pad on a separate access road that is also associated with well 005-30164. This freshawater impoundment is associated with and was constructed for well development activities for the 005-30652 Matthew Anthony 3M-86 well. |
2131621 | Primary Facility | 2013-01-17 | Routine/Complete Inspection | Violation(s) Noted | Drilling was completed on 06/15/11, well appeared to be equipped for production. Well-site had been regraded and vegetation appeared to have begun to take hold. An impoundment was located in conjucntion with this well that as per the operator contained freshwater, precipitation and snow melt. This impoundment had more than the required two feet of lined freeboard. |
2185985 | Primary Facility | 2013-07-22 | Compliance Evaluation | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Freshwater impoundment had been regraded and the vegetative cover met the 70% uniform coverage criteria. |
2293467 | Primary Facility | 2014-08-07 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2436544 | Primary Facility | 2015-12-28 | Routine/Complete Inspection | No Violations Noted | Well is tagged-in production. Annulus plumbed to vent stack-open. Equipment-100 bbl tank-meter set OK. |
2511161 | Primary Facility | 2016-08-17 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2583501 | Primary Facility | 2017-04-17 | Routine/Complete Inspection | No Violations Noted | Well tagged-on-annulus open. Well head casing-production set equipment-grounded 100 bbl fiberglass tank look ok. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2131621 | 658163 | 01/17/2013 | 2013-01-17 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
658163 | 292886 | NOV - Notice of Violation | Comply/Closed | 2013-07-22 |
For data sources see[7]