If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-30650 | | Well ID: 37-005-30650 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.812733, -79.651578 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: ROGER H CLAYPOOLE ETUX 1M-528 | | Farm/Lease Name: ROGER H CLAYPOOLE ETUX 1M-528 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2010-06-08 | | Permit Date: 2010-06-08 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 40.812733 | | Latitude: 40.812733 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-06-08 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-10-22 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2010-10-29 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2010-11-11 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-06-18 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 101: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 159: | Line 200: | ||
| 2018 | | 2018 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 20,382.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 359 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 168: | Line 209: | ||
| 2019 | | 2019 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 19,489.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 361 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 193: | Line 234: | ||
| 2011 | | 2011 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 110.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0254185 |
|- | |- | ||
| 2011 | | 2011 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 680.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0101508 |
|- | |- | ||
| 2011 | | 2011 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 110.00 Bbl | | style="text-align: right;" | 110.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0095273 |
|- | |- | ||
| 2012 | | 2012 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 80.00 Bbl | | style="text-align: right;" | 80.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-21438 |
|- | |- | ||
| 2012 | | 2012 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 160.00 Bbl | | style="text-align: right;" | 160.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 228: | Line 269: | ||
| 2012 | | 2012 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 80.00 Bbl | | style="text-align: right;" | 80.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-21893 |
|- | |- | ||
| 2013 | | 2013 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 185.00 Bbl | | style="text-align: right;" | 185.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 242: | Line 283: | ||
| 2014 | | 2014 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 93.00 Bbl | | style="text-align: right;" | 93.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 256: | Line 290: | ||
| 2014 | | 2014 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 93.00 Bbl | | style="text-align: right;" | 93.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-155-23732 | | 34-155-23732 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 35.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
|- | |- | ||
| 2015 | | 2015 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 93.00 Bbl | | style="text-align: right;" | 93.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 270: | Line 311: | ||
| 2017 | | 2017 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
+ | | style="text-align: right;" | 95.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-23223 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | |||
| style="text-align: right;" | 95.00 Bbl | | style="text-align: right;" | 95.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 277: | Line 325: | ||
| 2018 | | 2018 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 90.00 Bbl | | style="text-align: right;" | 90.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-099-23158 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 42.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-099-23158 | | 34-099-23158 |
Well ID: 37-005-30650 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.812733,"lon":-79.651578,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: West Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 147439 | |
Farm/Lease Name: ROGER H CLAYPOOLE ETUX 1M-528 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.812733 | |
Longitude: -79.651578 |
Date | Event |
---|---|
2010-06-08 | New Permit Application |
2010-10-22 | Performed Spud Operation |
2010-10-29 | Drilling Completion |
2010-11-11 | Perforation |
2013-06-18 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | SNYDER BROS INC | 6,696.00 | 15 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 69,793.00 | 297 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 55,818.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 43,613.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 36,522.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 30,567.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 29,875.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 22,928.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 20,382.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 19,489.00 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | SNYDER BROS INC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | SNYDER BROS INC | Produced Fluid | 680.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | SNYDER BROS INC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2012 | SNYDER BROS INC | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2013 | SNYDER BROS INC | Produced Fluid | 185.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | SNYDER BROS INC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | SNYDER BROS INC | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 | |
2018 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 42.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1922215 | Primary Facility | 2010-10-22 | Drilling/Alteration | No Violations Noted | Operator provided spud notification to begin as soon as 10/22/10. 32' of 13 3/8" conductor was being set and sanded in at time of inspection. Drilling pit lined and freeboard maintained. E/S controls in place and functioning as per available plan. |
1925385 | Primary Facility | 2010-11-01 | Drilling/Alteration | No Violations Noted | Well shut in on 4 1/2¿ x 2¿ swage. 7¿ X 4 1/2¿ annulus closed. Drilling pit lined and freeboard maintained. E/S controls in place and functioning as per available plan. |
1929391 | Primary Facility | 2010-11-18 | Routine/Complete Inspection | No Violations Noted | Well is drilled. Site ID sign and E&S plan located. Pit appears to be in sound condition. There is no evidence of accelerated erosion and sedimentation on the well site or the access road. |
2061466 | Primary Facility | 2012-04-20 | Site Restoration | No Violations Noted | Well appears to drilled and equipped for production. Well apparatus and brine tank located on site appear to be in sound condition. No accelerated erosion observed in relation to the well pad or access road. The site had recently been regraded, seeded and mulched. The Department suggests the Operator monitor the site to ensure the 70% uniform vegetative coverage criteria is met. |
2088863 | Primary Facility | 2012-08-01 | Routine/Complete Inspection | No Violations Noted | Tag, 2 tanks, e&s ok. |
2249008 | Primary Facility | 2014-02-27 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been effectively restored and the vegetative cover met the 70% uniform coverage. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2571614 | Primary Facility | 2017-03-15 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2675038 | Primary Facility | 2017-12-27 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, production set equipment and 2 grounded 100 bbl fiberglass tanks look ok. |
For data sources see[7]