If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: | + | | Well ID: 37-003-22187 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.514333, -79.706389 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[Allegheny_County,_Pennsylvania|Allegheny]] | ||
+ | |- | ||
+ | | Municipality: [[Plum Borough,_Allegheny_County,_Pennsylvania|Plum Borough]] | ||
+ | |- | ||
+ | | Operator Name: [[PENNECO OIL CO INC]] | ||
|- | |- | ||
− | | | + | | Well Pad ID: |
|- | |- | ||
− | | | + | | Farm/Lease Name: HANKEY UNIT 6H |
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2011-05-16 |
|- | |- | ||
− | | | + | | Well Type: OIL |
|- | |- | ||
− | | Unconventional: | + | | Unconventional Well: N |
|- | |- | ||
− | | | + | | Configuration: Deviated Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
| Latitude: 40.514333 | | Latitude: 40.514333 | ||
|- | |- | ||
− | | Longitude: -79. | + | | Longitude: -79.706389 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-05-16 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-06-13 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2011-08-02 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2011-08-16 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-09-04 | ||
+ | | DEVIATED | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 7,897.00 | ||
+ | | style="text-align: right;" | 92 | ||
+ | | style="text-align: right;" | 130.20 | ||
+ | | style="text-align: right;" | 92 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 20,871.00 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 117.86 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 14,620.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 103.87 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 12,231.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 76.79 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 9,647.75 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 69.82 | ||
+ | | style="text-align: right;" | 31 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 7,836.47 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 6,647.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 86.11 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 5,528.31 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 36.69 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 4,872.46 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 2,450.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 160.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 330.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 1,890.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0091472 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 960.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 356.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 246.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 246 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 35 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 35.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 35.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 5.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1983213 | | 1983213 | ||
+ | | Primary Facility | ||
| 2011-06-08 | | 2011-06-08 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL. | | PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL. | ||
− | |||
− | |||
− | |||
|- | |- | ||
| 1983776 | | 1983776 | ||
+ | | Primary Facility | ||
| 2011-06-14 | | 2011-06-14 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL. | | CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL. | ||
− | |||
− | |||
|- | |- | ||
| 1983786 | | 1983786 | ||
+ | | Primary Facility | ||
| 2011-06-16 | | 2011-06-16 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK. | | RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK. | ||
− | |||
− | |||
|- | |- | ||
| 1983787 | | 1983787 | ||
+ | | Primary Facility | ||
| 2011-06-24 | | 2011-06-24 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| RUNNING RODS TO RESUME DRILLING. | | RUNNING RODS TO RESUME DRILLING. | ||
− | |||
− | |||
− | |||
|- | |- | ||
| 1983788 | | 1983788 | ||
+ | | Primary Facility | ||
| 2011-06-28 | | 2011-06-28 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11. | | TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11. | ||
− | |||
− | |||
|- | |- | ||
| 1983789 | | 1983789 | ||
+ | | Primary Facility | ||
| 2011-06-15 | | 2011-06-15 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| RIG IDLE. PROBLEMS WIT THREADS ON CASING. | | RIG IDLE. PROBLEMS WIT THREADS ON CASING. | ||
− | |||
− | |||
|- | |- | ||
| 1985337 | | 1985337 | ||
+ | | Primary Facility | ||
| 2011-06-08 | | 2011-06-08 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| On June 8th , 2011 I conducted a routine inspection of the above site. The site was under construction but almost complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. | | On June 8th , 2011 I conducted a routine inspection of the above site. The site was under construction but almost complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. | ||
− | |||
− | |||
|- | |- | ||
| 1986504 | | 1986504 | ||
+ | | Primary Facility | ||
| 2011-06-14 | | 2011-06-14 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| On June 14th , 2011 I conducted a routine inspection of the above site. The rig was set up on site. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On June 14th , 2011 I conducted a routine inspection of the above site. The rig was set up on site. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
− | |||
− | |||
|- | |- | ||
| 1986608 | | 1986608 | ||
+ | | Primary Facility | ||
| 2011-06-24 | | 2011-06-24 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| On June 24th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. Water trucks were on site. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On June 24th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. Water trucks were on site. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
− | |||
− | |||
|- | |- | ||
| 1991678 | | 1991678 | ||
+ | | Primary Facility | ||
| 2011-07-06 | | 2011-07-06 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL. | | US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL. | ||
− | |||
− | |||
− | |||
|- | |- | ||
| 1992021 | | 1992021 | ||
+ | | Primary Facility | ||
| 2011-07-06 | | 2011-07-06 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| On July 6th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. The next/bigger rig had moved in. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On July 6th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. The next/bigger rig had moved in. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
− | |||
− | |||
|- | |- | ||
| 1993478 | | 1993478 | ||
+ | | Primary Facility | ||
| 2011-07-26 | | 2011-07-26 | ||
+ | | Complaint Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint. Drilling was occurring. The access road was in good condition. A Site ID and E&S plan were posted at the site. 12 frac tanks were at the site. E&S controls were in place. The pit appeared to be in good condition. A small slip was developing on the fill slope. Crews were on site to make repairs. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint. Drilling was occurring. The access road was in good condition. A Site ID and E&S plan were posted at the site. 12 frac tanks were at the site. E&S controls were in place. The pit appeared to be in good condition. A small slip was developing on the fill slope. Crews were on site to make repairs. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
− | |||
− | |||
|- | |- | ||
| 1993497 | | 1993497 | ||
+ | | Primary Facility | ||
| 2011-08-03 | | 2011-08-03 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| On August 3rd , 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was tearing down. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. The silt sock required maintenance. The operator was contacted. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On August 3rd , 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was tearing down. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. The silt sock required maintenance. The operator was contacted. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
− | |||
− | |||
|- | |- | ||
| 1993503 | | 1993503 | ||
+ | | Primary Facility | ||
| 2011-08-04 | | 2011-08-04 | ||
+ | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| On August 4th , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site. The necessary repairs had been completed. The rig had moved offsite. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pits appeared to be in good condition. Crews were cleaning the mud tanks. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | | On August 4th , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site. The necessary repairs had been completed. The rig had moved offsite. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pits appeared to be in good condition. Crews were cleaning the mud tanks. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. | ||
− | |||
− | |||
|- | |- | ||
| 1993798 | | 1993798 | ||
+ | | Primary Facility | ||
| 2011-07-26 | | 2011-07-26 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION. | | RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION. | ||
− | |||
− | |||
|- | |- | ||
| 1993803 | | 1993803 | ||
+ | | Primary Facility | ||
| 2011-07-18 | | 2011-07-18 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE. | | HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE. | ||
− | |||
− | |||
|- | |- | ||
| 1993812 | | 1993812 | ||
+ | | Primary Facility | ||
| 2011-07-13 | | 2011-07-13 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492' | | HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492' | ||
− | |||
− | |||
|- | |- | ||
| 1998345 | | 1998345 | ||
+ | | Primary Facility | ||
| 2011-08-03 | | 2011-08-03 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| DRILLING COMPLETE AND THE RIG IS GONE. | | DRILLING COMPLETE AND THE RIG IS GONE. | ||
− | |||
− | |||
− | |||
|- | |- | ||
| 1998347 | | 1998347 | ||
+ | | Primary Facility | ||
| 2011-08-05 | | 2011-08-05 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE. | + | | THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE. |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2001758 | | 2001758 | ||
+ | | Primary Facility | ||
| 2011-08-16 | | 2011-08-16 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL OIL WELL. | | HORIZONTAL OIL WELL. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2001797 | | 2001797 | ||
+ | | Primary Facility | ||
| 2011-08-29 | | 2011-08-29 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| RUNNING TUBING TO PUMP AIR TO CLEAN HOLE. | | RUNNING TUBING TO PUMP AIR TO CLEAN HOLE. | ||
− | |||
− | |||
|- | |- | ||
| 2001799 | | 2001799 | ||
+ | | Primary Facility | ||
| 2011-08-24 | | 2011-08-24 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING. | | WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING. | ||
− | |||
− | |||
|- | |- | ||
| 2035041 | | 2035041 | ||
+ | | Primary Facility | ||
| 2012-01-04 | | 2012-01-04 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED. | | HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED. | ||
− | |||
− | |||
|- | |- | ||
| 2054231 | | 2054231 | ||
+ | | Primary Facility | ||
| 2012-02-22 | | 2012-02-22 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL. | + | | THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL. |
− | |||
− | |||
− | |||
|- | |- | ||
| 2106083 | | 2106083 | ||
+ | | Primary Facility | ||
| 2012-10-04 | | 2012-10-04 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| John Ley WQS SWRO, was on site to complete a routine inspection. The well was equipped for production. Brine tank located onsite appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in on the access road or well-site. The site had at least 70% vegetation on the hillsides. | | John Ley WQS SWRO, was on site to complete a routine inspection. The well was equipped for production. Brine tank located onsite appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in on the access road or well-site. The site had at least 70% vegetation on the hillsides. | ||
+ | |- | ||
+ | | 2464606 | ||
+ | | Primary Facility | ||
+ | | 2016-03-10 | ||
+ | | Incident- Response to Accident or Event | ||
+ | | Violation(s) Noted | ||
+ | | | ||
+ | |- | ||
+ | | 2483885 | ||
+ | | Primary Facility | ||
+ | | 2016-05-11 | ||
+ | | Compliance Evaluation | ||
+ | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2678195 | ||
+ | | Primary Facility | ||
+ | | 2018-01-04 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks appear to be in sound condition. | ||
|- | |- | ||
|} | |} | ||
− | == | + | ==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Violation Date |
− | !scope="col" | | + | !scope="col" | Date Resolved |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | !scope="col" | | + | !scope="col" | Violation Type |
− | !scope="col" | | + | !scope="col" | Violation Comments |
|- | |- | ||
− | | | + | | 2464606 |
− | | | + | | 754223 |
− | | | + | | 2016-03-10 |
− | | | + | | 2016-05-11 |
− | | | + | | 78.57(a) |
− | | | + | | Environmental Health & Safety |
− | | | + | | |
|- | |- | ||
− | | | + | | 2464606 |
− | | | + | | 754224 |
− | | | + | | 2016-03-10 |
− | | | + | | 2016-05-11 |
− | + | | SWMA301 | |
− | | | + | | Environmental Health & Safety |
− | | | + | | |
− | | | ||
|- | |- | ||
|} | |} | ||
− | == | + | ==== Penalties Applied ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Penalty ID |
− | !scope="col" | | + | !scope="col" | Penalty Code |
− | !scope="col" | | + | !scope="col" | Penalty Status |
− | !scope="col" | | + | !scope="col" | Penalty Date |
− | + | !scope="col" | Enforcement Date | |
− | !scope="col" | | + | !scope="col" | Penalty Amount |
− | !scope="col" | | + | !scope="col" | Amount Collected |
− | !scope="col" | | ||
|- | |- | ||
− | | | + | | 754223 |
− | | | + | | 340779 |
− | | style="text-align:right;" | | + | | NOV - Notice of Violation |
− | | | + | | |
− | + | | | |
− | + | | 2016-05-11 | |
− | + | | style="text-align: right;" | | |
− | + | | style="text-align: right;" | | |
− | | | ||
|- | |- | ||
− | | | + | | 754224 |
− | + | | 340779 | |
− | + | | NOV - Notice of Violation | |
− | + | | | |
− | | | + | | |
− | | | + | | 2016-05-11 |
− | + | | style="text-align: right;" | | |
− | + | | style="text-align: right;" | | |
− | | | ||
− | | | ||
− | |- | ||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-003-22187 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.514333,"lon":-79.706389,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: HANKEY UNIT 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-05-16 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 40.514333 | |
Longitude: -79.706389 |
Date | Event |
---|---|
2011-05-16 | New Permit Application |
2011-06-13 | Performed Spud Operation |
2011-08-02 | Drilling Completion |
2011-08-16 | Perforation |
2013-09-04 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | 7,897.00 | 92 | 130.20 | 92 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 20,871.00 | 366 | 117.86 | 366 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 14,620.00 | 365 | 103.87 | 365 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 12,231.00 | 365 | 76.79 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 9,647.75 | 365 | 69.82 | 31 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 7,836.47 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 6,647.00 | 365 | 86.11 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 5,528.31 | 365 | 36.69 | 30 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 4,872.46 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | Fracing Fluid Waste | 2,450.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | PENNECO OIL CO INC | Produced Fluid | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 330.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 1,890.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 960.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | PENNECO OIL CO INC | Produced Fluid | 356.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2013 | PENNECO OIL CO INC | Produced Fluid | 246.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 246 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 35 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 35.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2016 | PENNECO OIL CO INC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | PENNECO OIL CO INC | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1983213 | Primary Facility | 2011-06-08 | Drilling/Alteration | No Violations Noted | PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL. |
1983776 | Primary Facility | 2011-06-14 | Drilling/Alteration | No Violations Noted | CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL. |
1983786 | Primary Facility | 2011-06-16 | Drilling/Alteration | No Violations Noted | RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK. |
1983787 | Primary Facility | 2011-06-24 | Drilling/Alteration | No Violations Noted | RUNNING RODS TO RESUME DRILLING. |
1983788 | Primary Facility | 2011-06-28 | Drilling/Alteration | No Violations Noted | TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11. |
1983789 | Primary Facility | 2011-06-15 | Drilling/Alteration | No Violations Noted | RIG IDLE. PROBLEMS WIT THREADS ON CASING. |
1985337 | Primary Facility | 2011-06-08 | Routine/Complete Inspection | No Violations Noted | On June 8th , 2011 I conducted a routine inspection of the above site. The site was under construction but almost complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. |
1986504 | Primary Facility | 2011-06-14 | Routine/Complete Inspection | No Violations Noted | On June 14th , 2011 I conducted a routine inspection of the above site. The rig was set up on site. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1986608 | Primary Facility | 2011-06-24 | Routine/Complete Inspection | No Violations Noted | On June 24th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. Water trucks were on site. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1991678 | Primary Facility | 2011-07-06 | Drilling/Alteration | No Violations Noted | US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL. |
1992021 | Primary Facility | 2011-07-06 | Routine/Complete Inspection | No Violations Noted | On July 6th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. The next/bigger rig had moved in. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1993478 | Primary Facility | 2011-07-26 | Complaint Inspection | No Violations Noted | On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint. Drilling was occurring. The access road was in good condition. A Site ID and E&S plan were posted at the site. 12 frac tanks were at the site. E&S controls were in place. The pit appeared to be in good condition. A small slip was developing on the fill slope. Crews were on site to make repairs. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1993497 | Primary Facility | 2011-08-03 | Routine/Complete Inspection | No Violations Noted | On August 3rd , 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was tearing down. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. The silt sock required maintenance. The operator was contacted. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1993503 | Primary Facility | 2011-08-04 | Follow-up Inspection | No Violations Noted | On August 4th , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site. The necessary repairs had been completed. The rig had moved offsite. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pits appeared to be in good condition. Crews were cleaning the mud tanks. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1993798 | Primary Facility | 2011-07-26 | Drilling/Alteration | No Violations Noted | RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION. |
1993803 | Primary Facility | 2011-07-18 | Drilling/Alteration | No Violations Noted | HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE. |
1993812 | Primary Facility | 2011-07-13 | Drilling/Alteration | No Violations Noted | HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492' |
1998345 | Primary Facility | 2011-08-03 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE AND THE RIG IS GONE. |
1998347 | Primary Facility | 2011-08-05 | Drilling/Alteration | No Violations Noted | THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE. |
2001758 | Primary Facility | 2011-08-16 | Drilling/Alteration | No Violations Noted | HORIZONTAL OIL WELL. |
2001797 | Primary Facility | 2011-08-29 | Drilling/Alteration | No Violations Noted | RUNNING TUBING TO PUMP AIR TO CLEAN HOLE. |
2001799 | Primary Facility | 2011-08-24 | Drilling/Alteration | No Violations Noted | WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING. |
2035041 | Primary Facility | 2012-01-04 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED. |
2054231 | Primary Facility | 2012-02-22 | Routine/Complete Inspection | No Violations Noted | THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL. |
2106083 | Primary Facility | 2012-10-04 | Routine/Complete Inspection | No Violations Noted | John Ley WQS SWRO, was on site to complete a routine inspection. The well was equipped for production. Brine tank located onsite appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in on the access road or well-site. The site had at least 70% vegetation on the hillsides. |
2464606 | Primary Facility | 2016-03-10 | Incident- Response to Accident or Event | Violation(s) Noted | |
2483885 | Primary Facility | 2016-05-11 | Compliance Evaluation | No Violations Noted | |
2678195 | Primary Facility | 2018-01-04 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks appear to be in sound condition. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2464606 | 754223 | 2016-03-10 | 2016-05-11 | 78.57(a) | Environmental Health & Safety | |
2464606 | 754224 | 2016-03-10 | 2016-05-11 | SWMA301 | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
754223 | 340779 | NOV - Notice of Violation | 2016-05-11 | ||||
754224 | 340779 | NOV - Notice of Violation | 2016-05-11 |
For data sources see[7]