If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-003-22153 | | Well ID: 37-003-22153 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.477817, -79.731653 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 17: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: OBLOCK 1 |
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2010-12-14 | | Permit Date: 2010-12-14 | ||
+ | |- | ||
+ | | Well Type: OIL | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.477817 | | Latitude: 40.477817 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-12-14 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-01-18 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 92: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 161: | Line 193: | ||
| style="text-align: right;" | 960.92 | | style="text-align: right;" | 960.92 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[DAKOTA OIL & GAS CO]] | ||
+ | | style="text-align: right;" | 764.83 | ||
+ | | style="text-align: right;" | 334 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 184: | Line 225: | ||
| 2011 | | 2011 | ||
| [[PENNECO OIL CO INC]] | | [[PENNECO OIL CO INC]] | ||
− | | Fracing Fluid Waste | + | | Fracing Fluid Waste |
| style="text-align: right;" | 100.00 Bbl | | style="text-align: right;" | 100.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 191: | Line 232: | ||
| 2011 | | 2011 | ||
| [[PENNECO OIL CO INC]] | | [[PENNECO OIL CO INC]] | ||
− | | Fracing Fluid Waste | + | | Fracing Fluid Waste |
| style="text-align: right;" | 760.00 Bbl | | style="text-align: right;" | 760.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 198: | Line 239: | ||
| 2011 | | 2011 | ||
| [[PENNECO OIL CO INC]] | | [[PENNECO OIL CO INC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
| style="text-align: right;" | 107.14 Bbl | | style="text-align: right;" | 107.14 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 205: | Line 246: | ||
| 2011 | | 2011 | ||
| [[PENNECO OIL CO INC]] | | [[PENNECO OIL CO INC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
| style="text-align: right;" | 1,510.00 Bbl | | style="text-align: right;" | 1,510.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
Well ID: 37-003-22153 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.477817,"lon":-79.731653,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: DAKOTA OIL & GAS CO | |
Well Pad ID: | |
Farm/Lease Name: OBLOCK 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-14 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.477817 | |
Longitude: -79.731653 |
Date | Event |
---|---|
2010-12-14 | New Permit Application |
2011-01-18 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 3,270.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 3,673.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 2,357.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 1,461.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | DAKOTA OIL & GAS CO | 1,434.66 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DAKOTA OIL & GAS CO | 866.28 | 274 | 0.00 | 0 | 0.00 | 0 |
2017 | DAKOTA OIL & GAS CO | 1,045.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DAKOTA OIL & GAS CO | 960.92 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DAKOTA OIL & GAS CO | 764.83 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | Fracing Fluid Waste | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | PENNECO OIL CO INC | Fracing Fluid Waste | 760.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 107.14 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 1,510.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1952927 | Primary Facility | 2011-01-20 | Routine/Complete Inspection | No Violations Noted | On January 20th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. Cement trucks were on site. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit was constructed and appeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1953104 | Primary Facility | 2011-01-28 | Routine/Complete Inspection | No Violations Noted | On January 28th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was moving off location. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1953925 | Primary Facility | 2011-01-18 | Drilling/Alteration | No Violations Noted | THE SITE IS BUILT. E&S, AND ACCESS OK. THE PIT IS LINED. THERE IS NO EQUIPTMENT ON THE SITE. |
1956826 | Primary Facility | 2011-01-24 | Drilling/Alteration | No Violations Noted | USE RIG #4 DRILLING @ 1710'. |
1956844 | Primary Facility | 2011-01-26 | Drilling/Alteration | No Violations Noted | USE RIG#4 BEGINNING TO DRILL AFTER 7" CEMENT TIME. |
1956849 | Primary Facility | 2011-01-31 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. 4.5" CASING IS IN. |
1957392 | Primary Facility | 2011-02-08 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. |
1957813 | Primary Facility | 2011-02-03 | Routine/Complete Inspection | No Violations Noted | On February 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. Frac tanks had been placed onsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1958776 | Primary Facility | 2011-02-17 | Routine/Complete Inspection | No Violations Noted | On February 17th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit appeared to be in good condition and displayed adequate freeboard. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1958889 | Primary Facility | 2011-02-24 | Routine/Complete Inspection | No Violations Noted | On February 24th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition and recently rocked. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was being put back. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1959472 | Primary Facility | 2011-03-02 | Drilling/Alteration | No Violations Noted | WELL IS COMPLETE AND SHUT IN. |
1961869 | Primary Facility | 2011-03-18 | Routine/Complete Inspection | No Violations Noted | On March 18th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The landowner requested that the gate be replaced. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1974613 | Primary Facility | 2011-04-27 | Drilling/Alteration | No Violations Noted | WELL IS PRODUCING. ANULUS IS OPEN. |
1984930 | Primary Facility | 2011-06-02 | Routine/Complete Inspection | No Violations Noted | On June 2nd, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was now in production. A well tag was present. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pits were closed and the site was rough graded. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
2486150 | Primary Facility | 2016-04-27 | Routine/Complete Inspection | No Violations Noted | THIS IS A WELL MAINTAINED GAS WELL. THE TANK AND PRODUCTION EQUIPTMENT ARE IN GOOD CONDITION.
THE ANULUS IS OPEN. |
2790343 | Primary Facility | 2018-10-17 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. |
For data sources see[7]