X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21743"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-21743
 
| Well ID: 37-081-21743
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.435406, -76.934722 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.435406, -76.934722 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: ALDEN EVANS A-3H
 
| Farm/Lease Name: ALDEN EVANS A-3H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2018-08-16
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2018-05-15
 
| Permit Date: 2018-05-15
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.435406
 
| Latitude: 41.435406
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-05-15
 +
| New Permit Application
 +
|-
 +
| 2018-08-16
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 112: Line 144:
 
| 2018
 
| 2018
 
| [[ARD OPR LLC]]
 
| [[ARD OPR LLC]]
| Drill Cuttings (in Tons) RWC 810
+
| Drill Cuttings
 
| style="text-align: right;" | 60.36 Tons
 
| style="text-align: right;" | 60.36 Tons
 
| LANDFILL
 
| LANDFILL
Line 119: Line 151:
 
| 2018
 
| 2018
 
| [[ARD OPR LLC]]
 
| [[ARD OPR LLC]]
| Drill Cuttings (in Tons) RWC 810
+
| Drill Cuttings
 
| style="text-align: right;" | 3,712.75 Tons
 
| style="text-align: right;" | 3,712.75 Tons
 
| LANDFILL
 
| LANDFILL
Line 126: Line 158:
 
| 2019
 
| 2019
 
| [[ARD OPR LLC]]
 
| [[ARD OPR LLC]]
| Servicing Fluid (in Barrels) RWC 808
+
| Servicing Fluid
| style="text-align: right;" | 26.25 Bbl
+
| style="text-align: right;" | 48.75 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[ARD OPR LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 0.75 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[ARD OPR LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 0.13 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Latest revision as of 02:35, 17 May 2020

Well Details

Well ID: 37-081-21743
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cascade Township
Operator Name: ARD OPR LLC
Well Pad ID: 155230
Farm/Lease Name: ALDEN EVANS A-3H
License Status:
Spud Date:
Permit Date: 2018-05-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.435406
Longitude: -76.934722

For data sources see[1][2][3]

Well History

Date Event
2018-05-15 New Permit Application
2018-08-16 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 ARD OPR LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 ARD OPR LLC Drill Cuttings 60.36 Tons LANDFILL 100955
2018 ARD OPR LLC Drill Cuttings 3,712.75 Tons LANDFILL 301358
2019 ARD OPR LLC Servicing Fluid 48.75 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 0.75 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 0.13 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2763007 Primary Facility 2018-08-09 Preoperation Inspection No Violations Noted Pre-Operational Inspection; 8/9/2018.

Perimeter E&S controls are installed and functioning properly. The site is being constructed with base-rocked limestone and geo-textile fabric. Overall, the site is in good condition and fulfills the pre-operational requirement. No violations noted.

2776118 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Weather was 72 degrees f. and raining at time of inspection. Met with Alta representative Ian Andrews on location. Well was a spud conductor. There was a steel plate covering the casing. The mouse hole was also spud and covered with a steel plate at time of inspection. No violations were noted at time of inspection.
2778839 Primary Facility 2018-09-24 Routine/Complete Inspection No Violations Noted Weather was 60° and cloudy at time of inspection. Met with Alta representative Bill Mitchell on location. Well was closed in with a night cap at time of inspection. The Surface and Intermediate casing had been drilled and cemented prior to this inspection. Reviewed the cement job logs from the surface and intermediate casing and no discrepancies were noted at time of inspection. Rig will move back over this well to complete the production section after the other wells on location are finishing being top holed. Conducted a walk around inspection of location. No violations were noted at time of inspection.
2783187 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted Weather was 62° and cloudy at time of inspection. Met with Alta representative R.D. Mann on location. Well was currently shut in with a night cap. Surface and intermediate casing were drilled and cemented. Wells will be completed after the Brooks 200H. Wells were under the catwalk. Conducted a walk around inspection. No violations were noted at time of inspection.
2792025 Primary Facility 2018-10-18 Routine/Complete Inspection No Violations Noted Weather was 37° and sunny at time of inspection. Met with Alta representative Bill Mitchell on location. Well was currently shut in with a night cap. Surface and intermediate casing were drilled and cemented. Wells were under the catwalk. Conducted a walk around inspection. No violations were noted at time of inspection.
2794405 Primary Facility 2018-10-25 Routine/Complete Inspection No Violations Noted Weather was 37° and partly cloudy at time of inspection. Met with Alta representative R.D. Mann on location. Well was currently shut in with a night cap. Surface and intermediate casing were drilled and cemented. Wells were under the rig and draw works cable spool. Conducted a walk around inspection. No violations were noted at time of inspection.
2799631 Primary Facility 2018-11-07 Routine/Complete Inspection No Violations Noted Weather was 50° and sunny at time of inspection. Met with Alta representative R.D. Mann on location. Rig was in the process of drilling the 8 3/4" hole for the production casing at time of inspection. They were expecting to reach their kickoff point tomorrow (11/8/18) sometime. No issues were discussed with drilling at that time. No violations were noted at time of inspection.
2804551 Primary Facility 2018-11-19 Routine/Complete Inspection No Violations Noted Weather was 36° and cloudy at time of inspection. Met with Alta representative Bill Mitchell on location. Rig was in the process of pulling drill pipe. Drilling to TD was completed at 12am today. They intend to pull drill pipe and circulate today and run casing at approximately 7am 11/20/18. No issues were discussed with drilling at that time. No violations were noted at time of inspection.
2807326 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted Weather was 34° and cloudy at time of inspection. Met with Alta representative R.D. Mann on location. At time of inspection rig had completed the production casing cement job. Reviewed the job log from the cement job and no discrepancies were noted at time of inspection. No violations were noted at time of inspection.
2807802 Primary Facility 2018-11-28 Drilling/Alteration No Violations Noted The site currently has the FlexRig 225 on location. The rig recently finished drilling the 081-21744 well and will be moving off location soon. The rig manager was informed of a small hydraulic oil spill off containment. The Department recommended the site be cleaned up asap. The operator/rig manager cleaned up the hydraulic spill within the next few hours. The spill is believed to be less than one gallon because the contaminated soil and rock was equal to 1 barrel.

Violations noted but immediately corrected.

2817401 Primary Facility 2018-12-19 Routine/Complete Inspection No Violations Noted Weather was 26° and sunny at time of inspection. Met with ALTA representative Bill Mitchell on location. Well was drilled and cemented to TD and closed in with a night cap. Well was covered with rig matting at the draw-works at time of inspection. Will follow-up with a visual inspection when rig moves off location. Rig was in the process of running production casing to TD on the Alden Evans 4H. No violations were noted at time of inspection.
2826070 Primary Facility 2019-01-07 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. There were no Alta representatives on location at time of inspection. Well recently had 3 strings of casing drilled and cemented to TD. Rig had moved off location to the Mac Pad. Well was shut in with a night cap to wait for stimulation. Well was covered with a steel grate at time of inspection. Well cellar was clean and 0% combustible gas was detected at time of inspection. The mouse hole was open and not yet filled with gravel. No violations were noted at time of inspection.

For data sources see[7]

References