X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-25568"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-065-25568
 
| Well ID: 37-065-25568
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.193872, -78.933414 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.193872, -78.933414 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: EARL LYONS 6
 
| Farm/Lease Name: EARL LYONS 6
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2006-10-17
+
| Spud Date: 2006-10-16
 
|-
 
|-
 
| Permit Date: 2006-04-25
 
| Permit Date: 2006-04-25
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.193872
 
| Latitude: 41.193872
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-04-25
 +
| New Permit Application
 +
|-
 +
| 2006-10-17
 +
| Performed Spud Operation
 +
|-
 +
| 2006-10-19
 +
| Drilling Completion
 +
|-
 +
| 2006-10-31
 +
| Perforation
 +
|-
 +
| 2006-11-22
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 88: Line 129:
 
| [[HANLEY & BIRD INC]]
 
| [[HANLEY & BIRD INC]]
 
| style="text-align: right;" | 1,254.00
 
| style="text-align: right;" | 1,254.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007
 +
| [[HANLEY & BIRD INC]]
 +
| style="text-align: right;" | 9160.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 146:
 
| 2008
 
| 2008
 
| [[HANLEY & BIRD INC]]
 
| [[HANLEY & BIRD INC]]
| style="text-align: right;" | 5,738.00
+
| style="text-align: right;" | 5738.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 155:
 
| 2009
 
| 2009
 
| [[HANLEY & BIRD INC]]
 
| [[HANLEY & BIRD INC]]
| style="text-align: right;" | 3,813.00
+
| style="text-align: right;" | 3813.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 122: Line 172:
 
|-
 
|-
 
| 2011
 
| 2011
| [[HANLEY & BIRD INC]]
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align: right;" | 444.00
+
| style="text-align: right;" | 2295
| style="text-align: right;" | 59
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 218: Line 268:
 
| 2011
 
| 2011
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 24.00 Bbl
 
| style="text-align: right;" | 24.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 225: Line 275:
 
| 2012
 
| 2012
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
Line 232: Line 282:
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 15.00 Bbl
 
| style="text-align: right;" | 15.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028207
 
| PA0028207
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[ALLIANCE PETRO CO LLC]]
 
| [[ALLIANCE PETRO CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2019
 +
| [[ALLIANCE PETRO CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 
|-
 
|-
 
|}
 
|}

Latest revision as of 19:40, 16 May 2020

Well Details

Well ID: 37-065-25568
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Warsaw Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: EARL LYONS 6
License Status: ACTIVE
Spud Date: 2006-10-16
Permit Date: 2006-04-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.193872
Longitude: -78.933414

For data sources see[1][2][3]

Well History

Date Event
2006-04-25 New Permit Application
2006-10-17 Performed Spud Operation
2006-10-19 Drilling Completion
2006-10-31 Perforation
2006-11-22 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 HANLEY & BIRD INC 1,254.00 365 0.00 0 0.00 0
2007 HANLEY & BIRD INC 9160.00 365 0.00 0 0.00 0
2008 HANLEY & BIRD INC 5738.00 365 0.00 0 0.00 0
2009 HANLEY & BIRD INC 3813.00 365 0.00 0 0.00 0
2010 HANLEY & BIRD INC 3,813.00 365 0.00 0 0.00 0
2011 EXCO RESOURCES PA LLC 2295 365 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 2,849.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 2,235.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 1,953.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 1,968.06 365 0.00 0 0.00 0
2016 ALLIANCE PETRO CO LLC 968.00 183 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 2,977.00 365 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 1,920.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 HANLEY & BIRD INC Brine 160.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2011 EXCO RESOURCES PA LLC Produced Fluid 24.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2012 EXCO RESOURCES PA LLC Produced Fluid 30.00 Bbl ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 15.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2015 EXCO RESOURCES PA LLC Produced Fluid 6.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 ALLIANCE PETRO CO LLC Produced Fluid 30.00 Bbl ROAD SPREADING
2019 ALLIANCE PETRO CO LLC Produced Fluid 30.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1572765 Primary Facility 2006-10-18 Drilling/Alteration No Violations Noted
1578655 Primary Facility 2006-11-13 Routine/Complete Inspection Violation(s) Noted
1581008 Primary Facility 2006-11-22 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1578655 501799 11/13/2006 2006-11-13 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
501799 214964 NOV - Notice of Violation Comply/Closed 2006-11-22

For data sources see[7]

References