If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-051-24515 | | Well ID: 37-051-24515 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.835447, -79.884836 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 2012-09- | + | | Spud Date: 2012-09-27 |
|- | |- | ||
| Permit Date: 2012-09-12 | | Permit Date: 2012-09-12 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 39.835447 | | Latitude: 39.835447 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-09-12 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-09-26 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2013-07-01 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | Performed Stage 1 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | Performed Stage 2 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | Performed Stage 3 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | Performed Stage 4 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-15 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-15 | ||
+ | | Performed Stage 5 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | Performed Stage 6 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | Performed Stage 7 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | Performed Stage 8 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | Performed Stage 9 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | Performed Stage 10 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | Performed Stage 11 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | Performed Stage 12 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | Performed Stage 13 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | Performed Stage 14 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-28 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-28 | ||
+ | | Performed Stage 15 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-28 | ||
+ | | Performed Stage 16 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-28 | ||
+ | | Performed Stage 17 of Stimulation | ||
+ | |- | ||
+ | | 2017-04-10 | ||
+ | | Deviated | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 158: | ||
| 2014-09-07 | | 2014-09-07 | ||
| 2014-09-28 | | 2014-09-28 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7,910 |
− | | style="text-align: right;" | 5,352,360 | + | | style="text-align: right;" | 5,352,360 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
|- | |- | ||
Line 278: | Line 374: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | style="text-align: right;" | 1 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 9,232 | ||
+ | | style="text-align: right;" | 9,412 | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | style="text-align: right;" | 2 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,960 | ||
+ | | style="text-align: right;" | 9,421 | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | style="text-align: right;" | 3 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,196 | ||
+ | | style="text-align: right;" | 9,280 | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | style="text-align: right;" | 4 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,878 | ||
+ | | style="text-align: right;" | 9,383 | ||
+ | |- | ||
+ | | 2014-09-15 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,758 | ||
+ | | style="text-align: right;" | 9,462 | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | style="text-align: right;" | 6 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 9,469 | ||
+ | | style="text-align: right;" | 8,896 | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | style="text-align: right;" | 7 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,600 | ||
+ | | style="text-align: right;" | 8,775 | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | style="text-align: right;" | 8 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,735 | ||
+ | | style="text-align: right;" | 8,937 | ||
+ | |- | ||
+ | | 2014-09-26 | ||
+ | | style="text-align: right;" | 9 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,352 | ||
+ | | style="text-align: right;" | 9,370 | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | style="text-align: right;" | 10 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,256 | ||
+ | | style="text-align: right;" | 8,954 | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | style="text-align: right;" | 11 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,738 | ||
+ | | style="text-align: right;" | 9,402 | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | style="text-align: right;" | 12 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,251 | ||
+ | | style="text-align: right;" | 8,542 | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | style="text-align: right;" | 13 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,717 | ||
+ | | style="text-align: right;" | 9,166 | ||
+ | |- | ||
+ | | 2014-09-27 | ||
+ | | style="text-align: right;" | 14 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,637 | ||
+ | | style="text-align: right;" | 9,412 | ||
+ | |- | ||
+ | | 2014-09-28 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 9,089 | ||
+ | | style="text-align: right;" | 9,287 | ||
+ | |- | ||
+ | | 2014-09-28 | ||
+ | | style="text-align: right;" | 16 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 8,756 | ||
+ | | style="text-align: right;" | 9,278 | ||
+ | |- | ||
+ | | 2014-09-28 | ||
+ | | style="text-align: right;" | 17 | ||
+ | | OTTAWA | ||
+ | | style="text-align: right;" | 1,732,111 | ||
+ | | style="text-align: right;" | 9,032 | ||
+ | | style="text-align: right;" | 9,511 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 354: | Line 585: | ||
| 2019 | | 2019 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 272,165.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 365 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 379: | Line 610: | ||
| 2012 | | 2012 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 180.00 Bbl | | style="text-align: right;" | 180.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 393: | Line 617: | ||
| 2012 | | 2012 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 629.10 Tons | | style="text-align: right;" | 629.10 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100419 | | 100419 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 2,464.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
| 2013 | | 2013 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
| style="text-align: right;" | 80.00 Bbl | | style="text-align: right;" | 80.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 407: | Line 638: | ||
| 2013 | | 2013 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 721.35 Tons | | style="text-align: right;" | 721.35 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 414: | Line 645: | ||
| 2013 | | 2013 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
| style="text-align: right;" | 108.00 Bbl | | style="text-align: right;" | 108.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 421: | Line 652: | ||
| 2014 | | 2014 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Fracing Fluid Waste | + | | Fracing Fluid Waste |
| style="text-align: right;" | 3,380.00 Bbl | | style="text-align: right;" | 3,380.00 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
Line 428: | Line 659: | ||
| 2015 | | 2015 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Fracturing Fluid Waste | + | | Fracturing Fluid Waste |
| style="text-align: right;" | 2.90 Tons | | style="text-align: right;" | 2.90 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 435: | Line 666: | ||
| 2015 | | 2015 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | | + | | Fracing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2,533.33 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 449: | Line 673: | ||
| 2015 | | 2015 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | + | | Fracturing Fluid Waste | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Fracturing Fluid Waste | ||
| style="text-align: right;" | 24.44 Tons | | style="text-align: right;" | 24.44 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 463: | Line 680: | ||
| 2015 | | 2015 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Fracing Fluid Waste | + | | Fracing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 5,461.67 Bbl |
− | | | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) |
− | | | + | | WMGR123SW001 |
|- | |- | ||
| 2015 | | 2015 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 73.33 Bbl | | style="text-align: right;" | 73.33 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
Line 477: | Line 694: | ||
| 2015 | | 2015 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Fracturing Fluid Waste | + | | Produced Fluid |
+ | | style="text-align: right;" | 281.67 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracturing Fluid Waste | ||
| style="text-align: right;" | 18.77 Tons | | style="text-align: right;" | 18.77 Tons | ||
| RESIDUAL WASTE TRANSFER FACILITY | | RESIDUAL WASTE TRANSFER FACILITY | ||
| MID074259565 | | MID074259565 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 5,980.32 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 736.04 Bbl | | style="text-align: right;" | 736.04 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 491: | Line 722: | ||
| 2016 | | 2016 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,599.34 Bbl | | style="text-align: right;" | 1,599.34 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 498: | Line 729: | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | 1, | + | | style="text-align: right;" | 1,576.67 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR123SW001 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 415.04 Bbl | | style="text-align: right;" | 415.04 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 512: | Line 743: | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 37.33 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW005 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 62.49 Bbl | | style="text-align: right;" | 62.49 Bbl | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
Line 526: | Line 757: | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 28.33 Bbl | | style="text-align: right;" | 28.33 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 533: | Line 764: | ||
| 2017 | | 2017 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid ( | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,908.01 Bbl |
− | | | + | | REUSE (AT WELL PAD) |
− | | | + | | |
+ | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 332.66 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 37.33 Bbl | | style="text-align: right;" | 37.33 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 547: | Line 785: | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 420.99 Bbl | | style="text-align: right;" | 420.99 Bbl | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
Line 554: | Line 792: | ||
| 2018 | | 2018 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 35.00 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR123SW005 |
|- | |- | ||
− | | | + | | 2019 |
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 83.33 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
Line 568: | Line 806: | ||
| 2019 | | 2019 | ||
| [[CHEVRON APPALACHIA LLC]] | | [[CHEVRON APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 523.34 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | |
Well ID: 37-051-24515 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.835447,"lon":-79.884836,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Nicholson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149173 | |
Farm/Lease Name: REJISS UNIT 1H | |
License Status: Active | |
Spud Date: 2012-09-27 | |
Permit Date: 2012-09-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.835447 | |
Longitude: -79.884836 |
Date | Event |
---|---|
2012-09-12 | New Permit Application |
2012-09-26 | Performed Spud Operation |
2013-07-01 | Drilling Completion |
2014-09-07 | Perforation |
2014-09-07 | Performed Stage 1 of Stimulation |
2014-09-07 | Performed Stage 2 of Stimulation |
2014-09-07 | Performed Stage 3 of Stimulation |
2014-09-14 | Perforation |
2014-09-14 | Performed Stage 4 of Stimulation |
2014-09-15 | Perforation |
2014-09-15 | Performed Stage 5 of Stimulation |
2014-09-26 | Perforation |
2014-09-26 | Performed Stage 6 of Stimulation |
2014-09-26 | Performed Stage 7 of Stimulation |
2014-09-26 | Performed Stage 8 of Stimulation |
2014-09-26 | Performed Stage 9 of Stimulation |
2014-09-27 | Perforation |
2014-09-27 | Performed Stage 10 of Stimulation |
2014-09-27 | Performed Stage 11 of Stimulation |
2014-09-27 | Performed Stage 12 of Stimulation |
2014-09-27 | Performed Stage 13 of Stimulation |
2014-09-27 | Performed Stage 14 of Stimulation |
2014-09-28 | Perforation |
2014-09-28 | Performed Stage 15 of Stimulation |
2014-09-28 | Performed Stage 16 of Stimulation |
2014-09-28 | Performed Stage 17 of Stimulation |
2017-04-10 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-09-07 | 2014-09-28 | 7,910 | 5,352,360 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | J624 | Schlumberger | Surfactant Gelling Agent | Fatty Acid Amidoalkyl Betaine | Proprietary | 60 | 0.00066111 | 0 |
Propan-2-ol | 67-63-0 | 30 | 0.00033056 | 0 | ||||
J580 | Schlumberger | Gelling Agent | Carboydrate polymer | Proprietary | 100 | 0.0152243 | 0 | |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00076106 | 0 | |
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 8.5535 | 0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.0008118 | 0 | |
J609W | Schlumberger | Friction Reducer | Urea | 57-13-6 | 5 | 0.00060285 | 0 | |
Ammonium Sulfate | 7783-20-2 | 30 | 0.00361707 | 0 | ||||
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00043701 | 0 | |
EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.00151809 | 0 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00075905 | 0 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00012651 | 0 | ||||
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 91.2743 | 0 | |
D047 | Schlumberger | Antifoam Agent | Polypropylene Glycol | 25322-69-4 | 100 | 0.00001868 | 0 | |
7.5% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 8 | 0.0203142 | 0 | |
J567 | Schlumberger | Encapsulated Breaker | Sulfonated Polystyrene | Proprietary | 100 | 0.00088709 | 0 | |
J623 | Schlumberger | Rheology Modifier | Propan-2-ol | 67-63-0 | 30 | 0.00012771 | 0 | |
A264 | Schlumberger | Corrosion Inhibitor | Aliphatic acids | Proprietary | 30 | 0.00003335 | 0 | |
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00001112 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.00004446 | 0 | ||||
Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00003335 | 0 | ||||
J134 | Schlumberger | Enzyme Breaker | Hemicellulase Enzyme | 9012-54-8 | 100 | 0.0007769 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-09-07 | 1 | OTTAWA | 1,732,111 | 9,232 | 9,412 |
2014-09-07 | 2 | OTTAWA | 1,732,111 | 8,960 | 9,421 |
2014-09-07 | 3 | OTTAWA | 1,732,111 | 8,196 | 9,280 |
2014-09-14 | 4 | OTTAWA | 1,732,111 | 8,878 | 9,383 |
2014-09-15 | 5 | OTTAWA | 1,732,111 | 8,758 | 9,462 |
2014-09-26 | 6 | OTTAWA | 1,732,111 | 9,469 | 8,896 |
2014-09-26 | 7 | OTTAWA | 1,732,111 | 8,600 | 8,775 |
2014-09-26 | 8 | OTTAWA | 1,732,111 | 8,735 | 8,937 |
2014-09-26 | 9 | OTTAWA | 1,732,111 | 8,352 | 9,370 |
2014-09-27 | 10 | OTTAWA | 1,732,111 | 8,256 | 8,954 |
2014-09-27 | 11 | OTTAWA | 1,732,111 | 8,738 | 9,402 |
2014-09-27 | 12 | OTTAWA | 1,732,111 | 8,251 | 8,542 |
2014-09-27 | 13 | OTTAWA | 1,732,111 | 8,717 | 9,166 |
2014-09-27 | 14 | OTTAWA | 1,732,111 | 8,637 | 9,412 |
2014-09-28 | 15 | OTTAWA | 1,732,111 | 9,089 | 9,287 |
2014-09-28 | 16 | OTTAWA | 1,732,111 | 8,756 | 9,278 |
2014-09-28 | 17 | OTTAWA | 1,732,111 | 9,032 | 9,511 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 31,661.00 | 9 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 747,443.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 577,322.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 448,643.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 340,909.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 272,165.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 180.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 629.10 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,464.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 80.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 721.35 Tons | LANDFILL | 100419 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 108.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,380.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 2.90 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,533.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 24.44 Tons | LANDFILL | 100277 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 5,461.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 73.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 281.67 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 18.77 Tons | RESIDUAL WASTE TRANSFER FACILITY | MID074259565 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,980.32 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 736.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,599.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,576.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 415.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 37.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 62.49 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 28.33 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,908.01 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 332.66 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 37.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 420.99 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 83.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 523.34 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2111504 | Primary Facility | 2012-10-12 | Incident- Response to Accident or Event | In Compliance with Policy | 20 gallon hydraulic spill from truck onto well pad. Material removed and placed in sealed roll off dumpster. Verified material removed. Operator handled spill incident in compliance with the current Department spill policy. |
2113028 | Primary Facility | 2012-09-26 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, CONDUCTOR SET @ 50' ON (9/26/2012). |
2121928 | Primary Facility | 2012-08-23 | Routine/Complete Inspection | No Violations Noted | Pre-op Inspection of well site. Perimeter E&S in place and functioning. |
2134410 | Primary Facility | 2012-12-17 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 DRILLING ON AIR @ 6001'(TD). RUNNING BRIDGE PLUG AND LOADING HOLE WITH OIL BASE MUD.CAPPING AND PREPAIRING TO MOVE RIG OFF LOCATION. |
2134416 | Primary Facility | 2012-12-12 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 DRILLING ON AIR @ 2635' (TD). RUNNING INTERMEDIATE CASING AND CEMENTING TONIGHT. |
2134420 | Primary Facility | 2012-12-08 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 DRILLING ON AIR @ 536' (TD) . RUNNING WATER PROTECTION CASING AND CEMENTING TONIGHT. |
2134422 | Primary Facility | 2012-12-06 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,HIGHLANDS # 9 DRILLING ON AIR @ 314' (TD). RUNNING COAL PROTECTION CASING AND CEMENTING TONIGHT. SET BASKET @ 260'. |
2134424 | Primary Facility | 2012-12-04 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,HIGHLANDS # 9 RIGGING -UP ON RIJISS # 1 - H TODAY. |
2139672 | Primary Facility | 2013-02-14 | Routine/Complete Inspection | No Violations Noted | Site Id sign up, guarded, plans and permits in box, E&S in place and functioning, some slopes may need to be monitored to ensure stability-stable now. |
2162631 | Primary Facility | 2013-04-30 | Routine/Complete Inspection | No Violations Noted | Sign up, E&S, PPC, permits in box. E&S in place and functioning. Good growth on site. No activity recently. |
2178428 | Primary Facility | 2013-06-26 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 7895' TODAY. QUESTIONING DRAINING F/W OFF CONTAINMENT TO PAD .WATER MEETS STANDARDS OF (DEP) RAIN -WATER STANDARDS. |
2178430 | Primary Facility | 2013-06-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 MOVING ON TO REJISS # 1 - H THIS WEEK-END. |
2205662 | Primary Facility | 2013-09-17 | Routine/Complete Inspection | No Violations Noted | Act 9 sign up, three wells in not fracked yet, area stable, plans and permits in box. |
2252455 | Primary Facility | 2014-03-11 | Routine/Complete Inspection | No Violations Noted | On 3/11/2014, I conducted an inspection at the Chevron Appalachia’s Rejiss 1H, 2H, 3H Well Unit site in Nicholson Twp., Fayette County. The reason for the inspection was a request by the operator for an extension on the date that the site needed to be restored by. The original restoration date was 3/19/2014 and an extension to 3/19/16 is being requested. |
2358705 | Primary Facility | 2015-01-27 | Routine/Complete Inspection | No Violations Noted | |
2467634 | Primary Facility | 2016-03-16 | Complaint Inspection | Violation(s) Noted | On 03/16/16 at approximately 0930 hours I conducted a complaint inspection of the Rejiss well site. The Act 9 sign was in place and all required documents were present at the site.
The site overall was well vegetated and there were no signs of erosion & sedimentation at the site. A significant amount of stone was also present on the slope of the topsoil stock pile at the southern corner of the well site. It is recommended that this be removed. The complaint against the site alleged that it was not built to the specifications of the approved E&S plans and that the stockpiles were causing environmental concerns. No environmental harm was observed due to the stock piles. The site appears to have been built to plan with the exception of two locations of gravel that appear to be gravel pull offs. One is located near the main site entrance on the northeast side of the access road and the second is near the debris pile on the southwestern access road. This is a violation of 102.5(m)(4). |
2731505 | Primary Facility | 2018-05-14 | Compliance Evaluation | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. Previously, an NOV had been issued for two gravel pull offs along the access road that were not permitted. The gravel pull offs have been removed and the site has been restored. The site was well vegetated and there were no signs of erosion observed. There were no violations observed at the time of inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2467634 | 755143 | 2016-03-16 | 2018-05-14 | 102.5(m)4 | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
755143 | 341063 | NOV - Notice of Violation | 2018-12-12 | ||||
755143 | 370324 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-12-12 | 2018-12-12 | $29,000.00 | $29,000.00 |
For data sources see[9]