X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24331"

m (Wiki moved page 051-24331 to 42-051-24331)
m
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 051-24331
+
| Well ID: 37-051-24331
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.020536, -79.678141 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.020536, -79.678142 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Fayette_County,_Pennsylvania|Fayette]]
 
|-
 
|-
| County: [[Fayette County, Pennsylvania|Fayette]]
+
| Municipality: [[Dunbar Township,_Fayette_County,_Pennsylvania|Dunbar Township]]
 
|-
 
|-
| Municipality: [[Dunbar Township, Fayette County, Pennsylvania|Dunbar Township]]
+
| Operator Name: [[XTO ENERGY INC]]
 
|-
 
|-
| Operator Name: [[XTO ENERGY INC|XTO ENERGY INC]]
+
| Well Pad ID: [[149688]]
 
|-
 
|-
 
| Farm/Lease Name: GEORGE F JOSEPH 11H
 
| Farm/Lease Name: GEORGE F JOSEPH 11H
 
|-
 
|-
| First Permit Date: 2010-03-15
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2010-03-15
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2010-06-20
+
| Permit Date: 2010-03-15
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.020536
 
| Latitude: 40.020536
 
|-
 
|-
| Longitude: -79.678141
+
| Longitude: -79.678142
|-
 
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
+
|-
!scope="col" | COMMENT
+
| 2010-03-15
!scope="col" | VIOLATION ID
+
| New Permit Application
 +
|-
 +
| 2010-06-20
 +
| Performed Spud Operation
 +
|-
 +
| 2010-09-26
 +
| Drilling Completion
 +
|-
 +
| 2010-11-20
 +
| Perforation
 
|-
 
|-
| 1894507
+
| 2010-11-20
| 2010-06-25
+
| Performed Stimulation 
| No Violations Noted
+
|-
|  
+
| 2011-02-17
|  
+
| DEVIATED
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 1916591
+
|}-->
| 2010-09-27
+
<!--==== Fluid Composition Data ====
| No Violations Noted
+
{| class="wikitable sortable" width="95%"
| HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD. PHOENIX RIG #5 SKIDDING 9/28/2010 AFTER CEMENTING 51/2" CASING TONIGHT,
+
!scope="col" | Job Number
|  
+
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
| 1938184
+
| 2010-11-20
| 2010-09-05
+
| style="text-align: right;" |
| No Violations Noted
+
 
| HORIZONTAL MARCELLUS, PHOENIX # 5  COMPLETED @ 10,973. E&S AND PITS ARE IN GOOD CONDITION.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2012-2
 
| style="text-align:right;" | 190709.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 17,878.00
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2011
| style="text-align:right;" | 232023.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 784,436.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 422,732.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2013
| style="text-align:right;" | 300295.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 183.0
+
| style="text-align: right;" | 309,025.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 234,323.00
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2015
| style="text-align:right;" | 484141.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 200,592.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 124,450.00
 +
| style="text-align: right;" | 347
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2017
| style="text-align:right;" | 17878.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 10.0
+
| style="text-align: right;" | 128,812.61
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 352
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 138,854.00
 +
| style="text-align: right;" | 347
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-3
+
| 2019
| style="text-align:right;" | 0.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 125,749.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 354
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2010
| PRODUCED FLUID
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 55.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 500.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-059-24067
+
| 301353
| DAVID R. HILL INC -  DEVCO UNIT #1 (SWIW #11)
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 530.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PBR
 
|-
 
|-
| 2012-2
+
| 2011
| PRODUCED FLUID
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 454.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 180.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-059-24067
 
| 34-059-24067
| DEVCO UNIT #1 (SWIW #11) DAVID R HILL INC
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,996.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 
|-
 
|-
| 2012-2
+
| 2011
| PRODUCED FLUID
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 854.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 1,322.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 124.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 
|-
 
|-
| 2012-2
+
| 2012
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 124.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 1,108.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 564.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24067
 +
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 124.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
| 34-133-21076
| SALTYS DISPOSAL - MYERS INECTION WELL #1
 
| PARIS
 
| OH
 
 
|-
 
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 49.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24067
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 359.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 
|-
 
|-
| 2010-2
+
| 2013
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 500.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 511.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| PA0254185
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
+
|-
| NEW CASTLE
+
| 2013
| PA
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 359.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 384.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 99.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 
|-
 
|-
| 2011-1
+
| 2014
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 3736.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 99.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES
| PAR000519462
+
| PA0254185
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 
| NEW CASTLE
 
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2011-1
+
| 2015
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 530.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 105.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| PBR
+
| WMGR123SW005
| RESERVED ENVIRONMENTAL SERVICES, LLC
 
| PITTSBURGH
 
| PA
 
 
|-
 
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 368.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 
|-
 
|-
| 2011-2
+
| 2016
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 260.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 133.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| PAR000519462
+
| WMGR123NW009
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 
| NEW CASTLE
 
| PA
 
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 199.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2011-2
+
| 2017
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 180.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 213.00 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-059-24067
+
| WMGR123SW005
| DEVCO UNIT (SWIW #11) DAVID R HILL INC
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2011-2
+
| 2018
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 1322.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 55.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROCESSING FACILITY
| PA0254185
+
| WMGR123SW005
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 165.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2012-1
+
| 2019
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 509.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 220.00 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-059-24067
+
| WMGR123SW005
| DAVID R. HILL INC -  DEVCO UNIT #1 (SWIW #11)
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 55.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2012-1
+
|}
| PRODUCED FLUID
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 254.0
+
| title =Oil and Gas Waste Reports
| Bbl
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| date = 2019-03-31
| PA0254185
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| RESERVED ENVIRONMENTAL SERVICES
+
| accessdate = 2019-05-21 }}</ref>
| MOUNT PLEASANT
+
== Inspection Data ==
| PA
+
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1894507
 +
| Primary Facility
 +
| 2010-06-25
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|  
 
|-
 
|-
 +
| 1916591
 +
| Primary Facility
 +
| 2010-09-27
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD. PHOENIX RIG #5 SKIDDING 9/28/2010 AFTER CEMENTING 51/2" CASING TONIGHT,
 
|-
 
|-
| 2012-1
+
| 1938184
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 124.0
+
| 2010-09-05
| Bbl
+
| Drilling/Alteration
| INJECTION DISPOSAL WELL
+
| No Violations Noted
34-133-24189
+
| HORIZONTAL MARCELLUS, PHOENIX # 5 COMPLETED @ 10,973. E&S AND PITS ARE IN GOOD CONDITION.
| SALTY'S DISPOSAL - MEYERS #2 (SWIW #33)
 
| ATWATER
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 12:34, 16 May 2020

Well Details

Well ID: 37-051-24331
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149688
Farm/Lease Name: GEORGE F JOSEPH 11H
License Status:
Spud Date:
Permit Date: 2010-03-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.020536
Longitude: -79.678142

For data sources see[1][2][3]

Well History

Date Event
2010-03-15 New Permit Application
2010-06-20 Performed Spud Operation
2010-09-26 Drilling Completion
2010-11-20 Perforation
2010-11-20 Performed Stimulation
2011-02-17 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-11-20 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 17,878.00 10 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 784,436.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 422,732.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 309,025.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 234,323.00 360 0.00 0 0.00 0
2015 XTO ENERGY INC 200,592.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 124,450.00 347 0.00 0 0.00 0
2017 XTO ENERGY INC 128,812.61 352 0.00 0 0.00 0
2018 XTO ENERGY INC 138,854.00 347 0.00 0 0.00 0
2019 XTO ENERGY INC 125,749.00 354 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 530.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR
2011 PHILLIPS EXPLORATION INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid 3,996.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 1,322.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 124.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 1,108.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 564.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012 XTO ENERGY INC Produced Fluid 124.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 49.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 XTO ENERGY INC Produced Fluid 359.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 511.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 359.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 384.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 99.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 99.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 368.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 133.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 199.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 213.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1894507 Primary Facility 2010-06-25 Drilling/Alteration No Violations Noted
1916591 Primary Facility 2010-09-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD. PHOENIX RIG #5 SKIDDING 9/28/2010 AFTER CEMENTING 51/2" CASING TONIGHT,
1938184 Primary Facility 2010-09-05 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PHOENIX # 5 COMPLETED @ 10,973. E&S AND PITS ARE IN GOOD CONDITION.

For data sources see[8]

References