If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-063-36718 | | Well ID: 37-063-36718 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.453930, -79.109745 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: [[West Wheatfield Township, | + | | State: Pennsylvania |
+ | |- | ||
+ | | County: [[Indiana_County,_Pennsylvania|Indiana]] | ||
+ | |- | ||
+ | | Municipality: [[West Wheatfield Township,_Indiana_County,_Pennsylvania|West Wheatfield Township]] | ||
|- | |- | ||
| Operator Name: [[WILLIAM MCINTIRE COAL OIL & GAS]] | | Operator Name: [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
Line 15: | Line 19: | ||
| Farm/Lease Name: SHOUP 1 | | Farm/Lease Name: SHOUP 1 | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: 2010-06-14 |
|- | |- | ||
− | | | + | | Permit Date: 2009-11-10 |
|- | |- | ||
− | | Unconventional: No | + | | Well Type: GAS |
+ | |- | ||
+ | | Unconventional Well: N | ||
+ | |- | ||
+ | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
+ | |- | ||
+ | | Latitude: 40.453930 | ||
+ | |- | ||
+ | | Longitude: -79.109745 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
|- | |- | ||
− | | | + | | 2009-11-10 |
+ | | New Permit Application | ||
|- | |- | ||
− | | | + | | 2010-06-15 |
+ | | Performed Spud Operation | ||
|- | |- | ||
− | | | + | | 2010-06-24 |
+ | | Drilling Completion | ||
|- | |- | ||
− | | | + | | 2010-07-21 |
+ | | Perforation | ||
|- | |- | ||
− | | | + | | 2011-01-19 |
+ | | NEWLY DRILLED | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
+ | !scope="col" | Water Production Days | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | style="text-align:right;" | 382. | + | | [[WILLIAM MCINTIRE COAL OIL & GAS]] |
− | | style="text-align:right;" | 35 | + | | style="text-align: right;" | 382.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 35 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2011 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | style="text-align: right;" | 4,194.00 | ||
+ | | style="text-align: right;" | 91 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012 |
− | | style="text-align:right;" | | + | | [[WILLIAM MCINTIRE COAL OIL & GAS]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 30.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 6 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2013 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | style="text-align: right;" | 3,637.37 | ||
+ | | style="text-align: right;" | 127 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | style="text-align:right;" | | + | | [[WILLIAM MCINTIRE COAL OIL & GAS]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 3,871.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 214 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2015 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | style="text-align: right;" | 7,079.00 | ||
+ | | style="text-align: right;" | 281 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | style="text-align:right;" | | + | | [[WILLIAM MCINTIRE COAL OIL & GAS]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 9,433.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 310 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2017 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | style="text-align: right;" | 3,581.00 | ||
+ | | style="text-align: right;" | 219 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2018 |
− | | style="text-align:right;" | | + | | [[WILLIAM MCINTIRE COAL OIL & GAS]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 3,821.00 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 199 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | style="text-align: right;" | 2,835.00 | ||
+ | | style="text-align: right;" | 232 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Production Reports |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-03-31 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | WASTE | + | !scope="col" | Waste Facility ID |
− | + | |- | |
− | + | | 2016 | |
− | + | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 50.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 50 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 20.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 60.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[WILLIAM MCINTIRE COAL OIL & GAS]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 70.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Waste Reports |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-03-31 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | + | !scope="col" | Inspection Comments | |
− | !scope="col" | | ||
|- | |- | ||
| 1894049 | | 1894049 | ||
+ | | Primary Facility | ||
| 2010-06-24 | | 2010-06-24 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | At the time of inspection, rig onsite actively drilling well. Site was properly signed with E&S plan. Access road was stable and sufficiently rocked. Below grade pit on site that sustained 2ft of lined freeboard. All bmps were installed and functioning as noted in E&S plan. No accelerated erosion or sedimentation issues observed in relation to well site or access road. It is recommended that operator temporary seed soil pile or line with filter fence to avoid any possible accelerated E&S issues. Operator should also continue to closely monitor all | + | | At the time of inspection, rig onsite actively drilling well. Site was properly signed with E&S plan. Access road was stable and sufficiently rocked. Below grade pit on site that sustained 2ft of lined freeboard. All bmps were installed and functioning as noted in E&S plan. No accelerated erosion or sedimentation issues observed in relation to well site or access road. It is recommended that operator temporary seed soil pile or line with filter fence to avoid any possible accelerated E&S issues. Operator should also continue to closely monitor all bmp¿s until final restoration activities have been completed. |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1894669 | | 1894669 | ||
+ | | Primary Facility | ||
| 2010-06-23 | | 2010-06-23 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | At the time of inspection, no E&S or IW issues at the site. Pit aligned with 30 mil plastic and no freeboard issues. Northeast set conductor pipe (13 3/ | + | | At the time of inspection, no E&S or IW issues at the site. Pit aligned with 30 mil plastic and no freeboard issues. Northeast set conductor pipe (13 3/8¿) 42 ` (sanded in) and 9 5/8¿ pipe set to 421 ft with basket at 84¿ and 155 sks with 9 bbl return. And 7 ¿pipe to 1308 ft with 105 sks Appellate and 75 sks Class A with 10 bbls return. Current depth was 3510 ft. Water detected at 250 ft. Spud called on 6/13/10. Well permit and cement receipts present along with well log. Stratigraphy consisted of sandstone, shale and coal. Well sign and E&S plan located at the entrance way of site. Down gradient filter fence present. |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1915949 | | 1915949 | ||
+ | | Primary Facility | ||
| 2010-09-22 | | 2010-09-22 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | At the time of inspection, Site was properly signed with E&S plan. Well drilled and in production. Access road was stable and sufficiently rocked. All bmps were installed and functioning as noted in E&S plan. No accelerated erosion or sedimentation issues observed in relation to well site or access road. No IW issues observed. Operator should also continue to closely monitor all | + | | At the time of inspection, Site was properly signed with E&S plan. Well drilled and in production. Access road was stable and sufficiently rocked. All bmps were installed and functioning as noted in E&S plan. No accelerated erosion or sedimentation issues observed in relation to well site or access road. No IW issues observed. Operator should also continue to closely monitor all bmp¿s until final restoration activities have been completed. Pits have been removed, but site has not yet been re-graded or seeded /mulched. Accompanied by WQS Dana Burk during inspection. |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1931747 | | 1931747 | ||
+ | | Primary Facility | ||
| 2010-12-02 | | 2010-12-02 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | At the time of inspection, no E&S or IW issues at the site. Well completed with | + | | At the time of inspection, no E&S or IW issues at the site. Well completed with 8¿ x 4¿ pipe and reduced to 2¿ production line. Line connected to data logger, separator, heater and 100 bbl brine tank (<10 bbl fluid). Data logger showed well turned on briefly. No signs of leakage around well head. Well tag present. |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1955486 | | 1955486 | ||
+ | | Primary Facility | ||
| 2011-03-07 | | 2011-03-07 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | site Id sign and Es plan present. Access road stable. Well completed on 06/24/10, 9 month restoration deadline is 03/24/11. As of this inspection, site is re-graded, but growth not yet observed; therefore, site restoration is not complete. (If operator is unable to meet 9 month deadline due to adverse circumstances as outlined in 78.65 (2) , operator may file for a restoration extension, , but approval is at the discretion of the dept provided amply evidence is presented to support claim for extension.) Appears operator has seeded and mulched site. Temporary bmp¿s (filter fence and brush/grub line) are installed, but operator should continue to monitor and maintain all bmp¿s until final permanent restoration is achieved. Observed minor ES (ponding of water) concerns near well head/production equipment possibly due to uneven grade, but no accelerated (offsite) erosion or sedimentation issues were noted. Faint gas odor detected near production equipment. Follow up inspection will be conducted to ensure permanent/final restoration is achieved. | ||
+ | |- | ||
+ | | 2295828 | ||
+ | | Primary Facility | ||
+ | | 2014-05-07 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | | + | | At the time of inspection, no E&S or IW issues at the site. Gas well was in production. Annulus was open |
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-063-36718 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45393,"lon":-79.109745,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: WILLIAM MCINTIRE COAL OIL & GAS | |
Well Pad ID: | |
Farm/Lease Name: SHOUP 1 | |
License Status: | |
Spud Date: 2010-06-14 | |
Permit Date: 2009-11-10 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.453930 | |
Longitude: -79.109745 |
Date | Event |
---|---|
2009-11-10 | New Permit Application |
2010-06-15 | Performed Spud Operation |
2010-06-24 | Drilling Completion |
2010-07-21 | Perforation |
2011-01-19 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | WILLIAM MCINTIRE COAL OIL & GAS | 382.00 | 35 | 0.00 | 0 | 0.00 | 0 |
2011 | WILLIAM MCINTIRE COAL OIL & GAS | 4,194.00 | 91 | 0.00 | 0 | 0.00 | 0 |
2012 | WILLIAM MCINTIRE COAL OIL & GAS | 30.00 | 6 | 0.00 | 0 | 0.00 | 0 |
2013 | WILLIAM MCINTIRE COAL OIL & GAS | 3,637.37 | 127 | 0.00 | 0 | 0.00 | 0 |
2014 | WILLIAM MCINTIRE COAL OIL & GAS | 3,871.00 | 214 | 0.00 | 0 | 0.00 | 0 |
2015 | WILLIAM MCINTIRE COAL OIL & GAS | 7,079.00 | 281 | 0.00 | 0 | 0.00 | 0 |
2016 | WILLIAM MCINTIRE COAL OIL & GAS | 9,433.00 | 310 | 0.00 | 0 | 0.00 | 0 |
2017 | WILLIAM MCINTIRE COAL OIL & GAS | 3,581.00 | 219 | 0.00 | 0 | 0.00 | 0 |
2018 | WILLIAM MCINTIRE COAL OIL & GAS | 3,821.00 | 199 | 0.00 | 0 | 0.00 | 0 |
2019 | WILLIAM MCINTIRE COAL OIL & GAS | 2,835.00 | 232 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2017 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 20.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 60.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 70.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1894049 | Primary Facility | 2010-06-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, rig onsite actively drilling well. Site was properly signed with E&S plan. Access road was stable and sufficiently rocked. Below grade pit on site that sustained 2ft of lined freeboard. All bmps were installed and functioning as noted in E&S plan. No accelerated erosion or sedimentation issues observed in relation to well site or access road. It is recommended that operator temporary seed soil pile or line with filter fence to avoid any possible accelerated E&S issues. Operator should also continue to closely monitor all bmp¿s until final restoration activities have been completed. |
1894669 | Primary Facility | 2010-06-23 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW issues at the site. Pit aligned with 30 mil plastic and no freeboard issues. Northeast set conductor pipe (13 3/8¿) 42 ` (sanded in) and 9 5/8¿ pipe set to 421 ft with basket at 84¿ and 155 sks with 9 bbl return. And 7 ¿pipe to 1308 ft with 105 sks Appellate and 75 sks Class A with 10 bbls return. Current depth was 3510 ft. Water detected at 250 ft. Spud called on 6/13/10. Well permit and cement receipts present along with well log. Stratigraphy consisted of sandstone, shale and coal. Well sign and E&S plan located at the entrance way of site. Down gradient filter fence present. |
1915949 | Primary Facility | 2010-09-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, Site was properly signed with E&S plan. Well drilled and in production. Access road was stable and sufficiently rocked. All bmps were installed and functioning as noted in E&S plan. No accelerated erosion or sedimentation issues observed in relation to well site or access road. No IW issues observed. Operator should also continue to closely monitor all bmp¿s until final restoration activities have been completed. Pits have been removed, but site has not yet been re-graded or seeded /mulched. Accompanied by WQS Dana Burk during inspection. |
1931747 | Primary Facility | 2010-12-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S or IW issues at the site. Well completed with 8¿ x 4¿ pipe and reduced to 2¿ production line. Line connected to data logger, separator, heater and 100 bbl brine tank (<10 bbl fluid). Data logger showed well turned on briefly. No signs of leakage around well head. Well tag present. |
1955486 | Primary Facility | 2011-03-07 | Routine/Complete Inspection | No Violations Noted | site Id sign and Es plan present. Access road stable. Well completed on 06/24/10, 9 month restoration deadline is 03/24/11. As of this inspection, site is re-graded, but growth not yet observed; therefore, site restoration is not complete. (If operator is unable to meet 9 month deadline due to adverse circumstances as outlined in 78.65 (2) , operator may file for a restoration extension, , but approval is at the discretion of the dept provided amply evidence is presented to support claim for extension.) Appears operator has seeded and mulched site. Temporary bmp¿s (filter fence and brush/grub line) are installed, but operator should continue to monitor and maintain all bmp¿s until final permanent restoration is achieved. Observed minor ES (ponding of water) concerns near well head/production equipment possibly due to uneven grade, but no accelerated (offsite) erosion or sedimentation issues were noted. Faint gas odor detected near production equipment. Follow up inspection will be conducted to ensure permanent/final restoration is achieved. |
2295828 | Primary Facility | 2014-05-07 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S or IW issues at the site. Gas well was in production. Annulus was open |
For data sources see[7]