X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-21702"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-21702
 
| Well ID: 37-117-21702
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.772369, -77.037697 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.772369, -77.037697 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/12/2014
+
| Spud Date: 2014-08-13
 
|-
 
|-
| Permit Date: 5/2/2014
+
| Permit Date: 2014-05-02
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.772369
 
| Latitude: 41.772369
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-05-02
 +
| New Permit Application
 +
|-
 +
| 2014-08-12
 +
| Performed Spud Operation
 +
|-
 +
| 2015-11-08
 +
| Drilling Completion
 +
|-
 +
| 2015-11-28
 +
| Perforation
 +
|-
 +
| 2015-12-02
 +
| Perforation
 +
|-
 +
| 2015-12-02
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2015-12-03
 +
| Perforation
 +
|-
 +
| 2015-12-03
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2015-12-04
 +
| Perforation
 +
|-
 +
| 2015-12-04
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2015-12-04
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2015-12-05
 +
| Perforation
 +
|-
 +
| 2015-12-05
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2015-12-06
 +
| Perforation
 +
|-
 +
| 2015-12-06
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2015-12-07
 +
| Perforation
 +
|-
 +
| 2015-12-07
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2015-12-08
 +
| Perforation
 +
|-
 +
| 2015-12-08
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2015-12-08
 +
| Performed Stage 9 of Stimulation
 +
|-
 +
| 2015-12-09
 +
| Perforation
 +
|-
 +
| 2015-12-09
 +
| Performed Stage 10 of Stimulation
 +
|-
 +
| 2015-12-10
 +
| Perforation
 +
|-
 +
| 2015-12-10
 +
| Performed Stage 11 of Stimulation
 +
|-
 +
| 2015-12-11
 +
| Perforation
 +
|-
 +
| 2015-12-11
 +
| Performed Stage 12 of Stimulation
 +
|-
 +
| 2015-12-11
 +
| Performed Stage 13 of Stimulation
 +
|-
 +
| 2015-12-12
 +
| Perforation
 +
|-
 +
| 2015-12-12
 +
| Performed Stage 14 of Stimulation
 +
|-
 +
| 2015-12-13
 +
| Perforation
 +
|-
 +
| 2015-12-13
 +
| Performed Stage 15 of Stimulation
 +
|-
 +
| 2015-12-13
 +
| Performed Stage 16 of Stimulation
 +
|-
 +
| 2015-12-14
 +
| Perforation
 +
|-
 +
| 2015-12-14
 +
| Performed Stage 17 of Stimulation
 +
|-
 +
| 2015-12-14
 +
| Performed Stage 18 of Stimulation
 +
|-
 +
| 2015-12-15
 +
| Perforation
 +
|-
 +
| 2015-12-15
 +
| Performed Stage 19 of Stimulation
 +
|-
 +
| 2015-12-15
 +
| Performed Stage 20 of Stimulation
 +
|-
 +
| 2015-12-16
 +
| Perforation
 +
|-
 +
| 2015-12-16
 +
| Performed Stage 21 of Stimulation
 +
|-
 +
| 2015-12-17
 +
| Perforation
 +
|-
 +
| 2015-12-17
 +
| Performed Stage 22 of Stimulation
 +
|-
 +
| 2015-12-17
 +
| Performed Stage 23 of Stimulation
 +
|-
 +
| 2015-12-18
 +
| Perforation
 +
|-
 +
| 2015-12-18
 +
| Performed Stage 24 of Stimulation
 +
|-
 +
| 2015-12-18
 +
| Performed Stage 25 of Stimulation
 +
|-
 +
| 2015-12-19
 +
| Perforation
 +
|-
 +
| 2015-12-19
 +
| Performed Stage 26 of Stimulation
 +
|-
 +
| 2015-12-19
 +
| Performed Stage 27 of Stimulation
 +
|-
 +
| 2015-12-20
 +
| Perforation
 +
|-
 +
| 2015-12-20
 +
| Performed Stage 28 of Stimulation
 +
|-
 +
| 2015-12-21
 +
| Perforation
 +
|-
 +
| 2015-12-21
 +
| Performed Stage 29 of Stimulation
 +
|-
 +
| 2015-12-21
 +
| Performed Stage 30 of Stimulation
 +
|-
 +
| 2016-07-11
 +
| Deviated
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2015-12-02
 +
| 2015-12-21
 +
| style="text-align: right;" | 5,700
 +
| style="text-align: right;" | 6,853,520
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="15"| 1
 +
| rowspan="2"| AI-302
 +
| rowspan="2"| U.S. Well Services
 +
| rowspan="2"| Acid Corrosion Inhibitors
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 95
 +
| style="text-align: right;" | 0.001
 +
| style="text-align: right;" | 697.224
 +
|-
 +
| 2-Propyn-1-olcompound with methyloxirane
 +
| 38172-91-7
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00016
 +
| style="text-align: right;" | 110.088
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| SI-1200
 +
| rowspan="2"| U.S. Well Services
 +
| rowspan="2"| Scale Inhibitor
 +
| Ammonium Chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 2.5
 +
| style="text-align: right;" | 0.00058
 +
| style="text-align: right;" | 405.455
 +
|-
 +
| Phosphonated compound
 +
| Proprietary
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00228
 +
| style="text-align: right;" | 1590.02
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| HCL Acid (12.6%-18.0%)
 +
| rowspan="2"| U.S. Well Services, LLC
 +
| rowspan="2"| Bulk Acid
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 87.5
 +
| style="text-align: right;" | 0.45869
 +
| style="text-align: right;" | 319311
 +
|-
 +
| Hydrogen Chloride
 +
| 7647-01-0
 +
| style="text-align: right;" | 18
 +
| style="text-align: right;" | 0.10957
 +
| style="text-align: right;" | 76273
 +
|-
 +
|- valign="top"
 +
| rowspan="5"| WFRC-2100
 +
| rowspan="5"| U.S. Well Services
 +
| rowspan="5"| Friction Reducer
 +
| Ammonium Chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00102
 +
| style="text-align: right;" | 709.212
 +
|-
 +
| Hydrotreated Petroleum Distillates
 +
| 64742-47-8
 +
| style="text-align: right;" | 25
 +
| style="text-align: right;" | 0.01079
 +
| style="text-align: right;" | 7509.3
 +
|-
 +
| Alkanolamide
 +
| 93-83-4
 +
| style="text-align: right;" | 2
 +
| style="text-align: right;" | 0.00133
 +
| style="text-align: right;" | 927.074
 +
|-
 +
| Copolymer of 2-Propenamide
 +
| 69418-26-4
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0024
 +
| style="text-align: right;" | 1667.4
 +
|-
 +
| Alcohol Ethoxylate
 +
| 68551-12-2
 +
| style="text-align: right;" | 2
 +
| style="text-align: right;" | 0.00133
 +
| style="text-align: right;" | 927.074
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"| Shell
 +
| rowspan="1"| Base Fluid
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 82.108
 +
| style="text-align: right;" | 57,158,400.0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| K-BAC 1020
 +
| rowspan="2"| U.S. Well Services
 +
| rowspan="2"| Anti-Bacterial Agent
 +
| 2,2-dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 20
 +
| style="text-align: right;" | 0.00748
 +
| style="text-align: right;" | 5208.45
 +
|-
 +
| Deionized Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 28
 +
| style="text-align: right;" | 0.00427
 +
| style="text-align: right;" | 2975.04
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand
 +
| rowspan="1"| U.S. Well Services, LLC
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica, quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 17.2911
 +
| style="text-align: right;" | 12,037,000.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2015-12-02
 +
| style="text-align: right;" | 1
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,857
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-03
 +
| style="text-align: right;" | 2
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,828
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-04
 +
| style="text-align: right;" | 3
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,922
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-04
 +
| style="text-align: right;" | 4
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,412
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-05
 +
| style="text-align: right;" | 5
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,494
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-06
 +
| style="text-align: right;" | 6
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,453
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-07
 +
| style="text-align: right;" | 7
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,066
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-08
 +
| style="text-align: right;" | 8
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,989
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-08
 +
| style="text-align: right;" | 9
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,367
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-09
 +
| style="text-align: right;" | 10
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,203
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-10
 +
| style="text-align: right;" | 11
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,756
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-11
 +
| style="text-align: right;" | 12
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,638
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-11
 +
| style="text-align: right;" | 13
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 5,861
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-12
 +
| style="text-align: right;" | 14
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,236
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-13
 +
| style="text-align: right;" | 15
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,201
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-13
 +
| style="text-align: right;" | 16
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,019
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-14
 +
| style="text-align: right;" | 17
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,973
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-14
 +
| style="text-align: right;" | 18
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,014
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-15
 +
| style="text-align: right;" | 19
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,203
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-15
 +
| style="text-align: right;" | 20
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,113
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-16
 +
| style="text-align: right;" | 21
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,977
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-17
 +
| style="text-align: right;" | 22
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,802
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-17
 +
| style="text-align: right;" | 23
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,122
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-18
 +
| style="text-align: right;" | 24
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,077
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-18
 +
| style="text-align: right;" | 25
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,019
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-19
 +
| style="text-align: right;" | 26
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 8,084
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-19
 +
| style="text-align: right;" | 27
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,984
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-20
 +
| style="text-align: right;" | 28
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,857
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-21
 +
| style="text-align: right;" | 29
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,506
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-12-21
 +
| style="text-align: right;" | 30
 +
| SAND
 +
| style="text-align: right;" | 86,232
 +
| style="text-align: right;" | 7,505
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 107: Line 668:
 
| 2019
 
| 2019
 
| [[SWEPI LP]]
 
| [[SWEPI LP]]
| style="text-align: right;" | 207,448.27
+
| style="text-align: right;" | 774,945.97
| style="text-align: right;" | 90
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 124: Line 685:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 129: Line 691:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2014-2
+
| 2014
| Drill Cuttings (in Tons)
+
| [[SWEPI LP]]
| style="text-align: right;" | 503.06 Tons
+
| Fracing Fluid Waste
| LANDFILL
 
| 301358
 
|-
 
| 2014-2
 
| Fracing Fluid Waste (in Barrels)
 
 
| style="text-align: right;" | 334.63 Bbl
 
| style="text-align: right;" | 334.63 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-1
+
| 2014
| Drill Cuttings (in Tons)
+
| [[SWEPI LP]]
| style="text-align: right;" | 197.70 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 503.06 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
 
|-
 
|-
| 2015-1
+
| 2015
| Drilling Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 48.32 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 48.65 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-2
+
| 2015
| Drill Cuttings (in Tons)
+
| [[SWEPI LP]]
| style="text-align: right;" | 24.15 Tons
+
| Produced Fluid
 +
| style="text-align: right;" | 124.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2015
 +
| [[SWEPI LP]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 221.85 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
 
|-
 
|-
| 2015-2
+
| 2015
| Drill Cuttings (in Tons)
+
| [[SWEPI LP]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 364.22 Tons
 
| style="text-align: right;" | 364.22 Tons
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR097R017
 
| WMGR097R017
 
|-
 
|-
| 2015-2
+
| 2015
| Drilling Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 73.34 Bbl
+
| Fracing Fluid Waste
 +
| style="text-align: right;" | 2.18 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2015-2
+
| 2015
| Drilling Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 0.33 Bbl
+
| Fracing Fluid Waste
 +
| style="text-align: right;" | 119.85 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-2
+
| 2015
| Fracing Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 2.18 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 73.34 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2015-2
+
| 2016
| Fracing Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 119.85 Bbl
+
| Waste Water Treatment Sludge
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 13.72 Tons
|
+
| RESIDUAL WASTE PROCESSING FACILITY
|-
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 124.67 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2016-1
+
| 2016
| Fracturing Fluid Waste (in Barrels) RWC 805
+
| [[SWEPI LP]]
 +
| Fracturing Fluid Waste
 
| style="text-align: right;" | 8,941.12 Bbl
 
| style="text-align: right;" | 8,941.12 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-1
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 113.67 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 633.27 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123
+
| WMGR123NC018
 
|-
 
|-
| 2016-1
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 933.24 Bbl
 
| style="text-align: right;" | 933.24 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC011
 
| WMGR123NC011
 
|-
 
|-
| 2016-1
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 633.27 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 113.67 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NC018
+
| WMGR123
 
|-
 
|-
| 2016-2
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 3,129.70 Bbl
 
| style="text-align: right;" | 3,129.70 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-2
+
| 2017
| Waste Water Treatment Sludge (in Tons) RWC 804
+
| [[SWEPI LP]]
| style="text-align: right;" | 13.72 Tons
+
| Produced Fluid
 +
| style="text-align: right;" | 35.10 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123
+
| WMGR123NC010
 
|-
 
|-
| 2017-02
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 16.67 Bbl
+
| Waste Water Treatment Sludge
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 300.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 16.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-04
 
| Waste Water Treatment Sludge (in Tons) RWC 804
 
 
| style="text-align: right;" | 8.24 Tons
 
| style="text-align: right;" | 8.24 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2017-05
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 143.00 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 701.66 Bbl
| WMGR123NC022
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-07
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 49.99 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 226.33 Bbl
|
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 35.10 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 66.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
| WMGR123NC022
 
|-
 
|-
| 2017-11
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 33.33 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 367.67 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-12
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 33.33 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 233.66 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
| WMGR123NC022
 
|-
 
|-
| 2018-01
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 66.67 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 66.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 79.00 Bbl
 
| style="text-align: right;" | 79.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018-06
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 1.00 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 250.65 Bbl
|
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 66.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 66.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 66.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 430: Line 871:
 
| 2275147
 
| 2275147
 
| Primary Facility
 
| Primary Facility
| 05/27/2014
+
| 2014-05-27
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 437: Line 878:
 
| 2294628
 
| 2294628
 
| Primary Facility
 
| Primary Facility
| 08/11/2014
+
| 2014-08-11
 
| Preoperation Inspection
 
| Preoperation Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 444: Line 885:
 
| 2294741
 
| 2294741
 
| Primary Facility
 
| Primary Facility
| 08/13/2014
+
| 2014-08-13
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 451: Line 892:
 
| 2334557
 
| 2334557
 
| Primary Facility
 
| Primary Facility
| 01/07/2015
+
| 2015-01-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 458: Line 899:
 
| 2353541
 
| 2353541
 
| Primary Facility
 
| Primary Facility
| 03/18/2015
+
| 2015-03-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 535: Line 976:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
| 1
 
| 12/02/2015
 
| 12/21/2015
 
| style="text-align: right;" | 5700
 
| style="text-align: right;" | 6,853,520.0
 
| style="text-align: right;" | 0
 
|-
 
|}
 
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|- valign="top"
 
| rowspan="15"| 1
 
| rowspan="2"| AI-302
 
| rowspan="2"| U.S. Well Services
 
| rowspan="2"| Acid Corrosion Inhibitors
 
| Water
 
| 7732-18-5
 
| style="text-align: right;" | 95
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 697.224
 
|-
 
| 2-Propyn-1-olcompound with methyloxirane
 
| 38172-91-7
 
| style="text-align: right;" | 15
 
| style="text-align: right;" | 0.00016
 
| style="text-align: right;" | 110.088
 
|-
 
|- valign="top"
 
| rowspan="2"| SI-1200
 
| rowspan="2"| U.S. Well Services
 
| rowspan="2"| Scale Inhibitor
 
| Ammonium Chloride
 
| 12125-02-9
 
| style="text-align: right;" | 2.5
 
| style="text-align: right;" | 0.00058
 
| style="text-align: right;" | 405.455
 
|-
 
| Phosphonated compound
 
| Proprietary
 
| style="text-align: right;" | 15
 
| style="text-align: right;" | 0.00228
 
| style="text-align: right;" | 1590.02
 
|-
 
|- valign="top"
 
| rowspan="2"| HCL Acid (12.6%-18.0%)
 
| rowspan="2"| U.S. Well Services, LLC
 
| rowspan="2"| Bulk Acid
 
| Water
 
| 7732-18-5
 
| style="text-align: right;" | 87.5
 
| style="text-align: right;" | 0.45869
 
| style="text-align: right;" | 319311
 
|-
 
| Hydrogen Chloride
 
| 7647-01-0
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 0.10957
 
| style="text-align: right;" | 76273
 
|-
 
|- valign="top"
 
| rowspan="5"| WFRC-2100
 
| rowspan="5"| U.S. Well Services
 
| rowspan="5"| Friction Reducer
 
| Ammonium Chloride
 
| 12125-02-9
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 0.00102
 
| style="text-align: right;" | 709.212
 
|-
 
| Hydrotreated Petroleum Distillates
 
| 64742-47-8
 
| style="text-align: right;" | 25
 
| style="text-align: right;" | 0.01079
 
| style="text-align: right;" | 7509.3
 
|-
 
| Alkanolamide
 
| 93-83-4
 
| style="text-align: right;" | 2
 
| style="text-align: right;" | 0.00133
 
| style="text-align: right;" | 927.074
 
|-
 
| Copolymer of 2-Propenamide
 
| 69418-26-4
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.0024
 
| style="text-align: right;" | 1667.4
 
|-
 
| Alcohol Ethoxylate
 
| 68551-12-2
 
| style="text-align: right;" | 2
 
| style="text-align: right;" | 0.00133
 
| style="text-align: right;" | 927.074
 
|-
 
|- valign="top"
 
| rowspan="1"| Water
 
| rowspan="1"| Shell
 
| rowspan="1"| Base Fluid
 
| Water
 
| 7732-18-5
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 82.108
 
| style="text-align: right;" | 57,158,400.0
 
|-
 
|- valign="top"
 
| rowspan="2"| K-BAC 1020
 
| rowspan="2"| U.S. Well Services
 
| rowspan="2"| Anti-Bacterial Agent
 
| 2,2-dibromo-3-nitrilopropionamide
 
| 10222-01-2
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 0.00748
 
| style="text-align: right;" | 5208.45
 
|-
 
| Deionized Water
 
| 7732-18-5
 
| style="text-align: right;" | 28
 
| style="text-align: right;" | 0.00427
 
| style="text-align: right;" | 2975.04
 
|-
 
|- valign="top"
 
| rowspan="1"| Sand
 
| rowspan="1"| U.S. Well Services, LLC
 
| rowspan="1"| Proppant
 
| Crystalline Silica, quartz
 
| 14808-60-7
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 17.2911
 
| style="text-align: right;" | 12,037,000.0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =FracFocus Fracking Chemicals Database
 
| date = 2019-04-02
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-06-19 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 04:07, 16 May 2020

Well Details

Well ID: 37-117-21702
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Richmond Township
Operator Name: SWEPI LP
Well Pad ID: 151094
Farm/Lease Name: SHUGHART 534 3H
License Status: Active
Spud Date: 2014-08-13
Permit Date: 2014-05-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.772369
Longitude: -77.037697

For data sources see[1][2][3]

Well History

Date Event
2014-05-02 New Permit Application
2014-08-12 Performed Spud Operation
2015-11-08 Drilling Completion
2015-11-28 Perforation
2015-12-02 Perforation
2015-12-02 Performed Stage 1 of Stimulation
2015-12-03 Perforation
2015-12-03 Performed Stage 2 of Stimulation
2015-12-04 Perforation
2015-12-04 Performed Stage 3 of Stimulation
2015-12-04 Performed Stage 4 of Stimulation
2015-12-05 Perforation
2015-12-05 Performed Stage 5 of Stimulation
2015-12-06 Perforation
2015-12-06 Performed Stage 6 of Stimulation
2015-12-07 Perforation
2015-12-07 Performed Stage 7 of Stimulation
2015-12-08 Perforation
2015-12-08 Performed Stage 8 of Stimulation
2015-12-08 Performed Stage 9 of Stimulation
2015-12-09 Perforation
2015-12-09 Performed Stage 10 of Stimulation
2015-12-10 Perforation
2015-12-10 Performed Stage 11 of Stimulation
2015-12-11 Perforation
2015-12-11 Performed Stage 12 of Stimulation
2015-12-11 Performed Stage 13 of Stimulation
2015-12-12 Perforation
2015-12-12 Performed Stage 14 of Stimulation
2015-12-13 Perforation
2015-12-13 Performed Stage 15 of Stimulation
2015-12-13 Performed Stage 16 of Stimulation
2015-12-14 Perforation
2015-12-14 Performed Stage 17 of Stimulation
2015-12-14 Performed Stage 18 of Stimulation
2015-12-15 Perforation
2015-12-15 Performed Stage 19 of Stimulation
2015-12-15 Performed Stage 20 of Stimulation
2015-12-16 Perforation
2015-12-16 Performed Stage 21 of Stimulation
2015-12-17 Perforation
2015-12-17 Performed Stage 22 of Stimulation
2015-12-17 Performed Stage 23 of Stimulation
2015-12-18 Perforation
2015-12-18 Performed Stage 24 of Stimulation
2015-12-18 Performed Stage 25 of Stimulation
2015-12-19 Perforation
2015-12-19 Performed Stage 26 of Stimulation
2015-12-19 Performed Stage 27 of Stimulation
2015-12-20 Perforation
2015-12-20 Performed Stage 28 of Stimulation
2015-12-21 Perforation
2015-12-21 Performed Stage 29 of Stimulation
2015-12-21 Performed Stage 30 of Stimulation
2016-07-11 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-12-02 2015-12-21 5,700 6,853,520 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI-302 U.S. Well Services Acid Corrosion Inhibitors Water 7732-18-5 95 0.001 697.224
2-Propyn-1-olcompound with methyloxirane 38172-91-7 15 0.00016 110.088
SI-1200 U.S. Well Services Scale Inhibitor Ammonium Chloride 12125-02-9 2.5 0.00058 405.455
Phosphonated compound Proprietary 15 0.00228 1590.02
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.5 0.45869 319311
Hydrogen Chloride 7647-01-0 18 0.10957 76273
WFRC-2100 U.S. Well Services Friction Reducer Ammonium Chloride 12125-02-9 1 0.00102 709.212
Hydrotreated Petroleum Distillates 64742-47-8 25 0.01079 7509.3
Alkanolamide 93-83-4 2 0.00133 927.074
Copolymer of 2-Propenamide 69418-26-4 30 0.0024 1667.4
Alcohol Ethoxylate 68551-12-2 2 0.00133 927.074
Water Shell Base Fluid Water 7732-18-5 100 82.108 57,158,400.0
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00748 5208.45
Deionized Water 7732-18-5 28 0.00427 2975.04
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 17.2911 12,037,000.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-12-02 1 SAND 86,232 7,857 0
2015-12-03 2 SAND 86,232 7,828 0
2015-12-04 3 SAND 86,232 7,922 0
2015-12-04 4 SAND 86,232 8,412 0
2015-12-05 5 SAND 86,232 8,494 0
2015-12-06 6 SAND 86,232 8,453 0
2015-12-07 7 SAND 86,232 8,066 0
2015-12-08 8 SAND 86,232 7,989 0
2015-12-08 9 SAND 86,232 8,367 0
2015-12-09 10 SAND 86,232 8,203 0
2015-12-10 11 SAND 86,232 8,756 0
2015-12-11 12 SAND 86,232 8,638 0
2015-12-11 13 SAND 86,232 5,861 0
2015-12-12 14 SAND 86,232 8,236 0
2015-12-13 15 SAND 86,232 8,201 0
2015-12-13 16 SAND 86,232 8,019 0
2015-12-14 17 SAND 86,232 7,973 0
2015-12-14 18 SAND 86,232 8,014 0
2015-12-15 19 SAND 86,232 8,203 0
2015-12-15 20 SAND 86,232 8,113 0
2015-12-16 21 SAND 86,232 7,977 0
2015-12-17 22 SAND 86,232 7,802 0
2015-12-17 23 SAND 86,232 8,122 0
2015-12-18 24 SAND 86,232 8,077 0
2015-12-18 25 SAND 86,232 8,019 0
2015-12-19 26 SAND 86,232 8,084 0
2015-12-19 27 SAND 86,232 7,984 0
2015-12-20 28 SAND 86,232 7,857 0
2015-12-21 29 SAND 86,232 7,506 0
2015-12-21 30 SAND 86,232 7,505 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 2,158,212.64 344 0.00 0 0.00 0
2017 SWEPI LP 1,383,257.87 365 0.00 0 0.00 0
2018 SWEPI LP 998,000.25 365 0.00 0 0.00 0
2019 SWEPI LP 774,945.97 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 SWEPI LP Fracing Fluid Waste 334.63 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SWEPI LP Drill Cuttings 503.06 Tons LANDFILL 301358
2015 SWEPI LP Drilling Fluid Waste 48.65 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWEPI LP Produced Fluid 124.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SWEPI LP Drill Cuttings 221.85 Tons LANDFILL 301358
2015 SWEPI LP Drill Cuttings 364.22 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR097R017
2015 SWEPI LP Fracing Fluid Waste 2.18 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SWEPI LP Fracing Fluid Waste 119.85 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWEPI LP Drilling Fluid Waste 73.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SWEPI LP Waste Water Treatment Sludge 13.72 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 SWEPI LP Fracturing Fluid Waste 8,941.12 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWEPI LP Produced Fluid 633.27 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 SWEPI LP Produced Fluid 933.24 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC011
2016 SWEPI LP Produced Fluid 113.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SWEPI LP Produced Fluid 3,129.70 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWEPI LP Produced Fluid 35.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 SWEPI LP Waste Water Treatment Sludge 8.24 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 SWEPI LP Produced Fluid 701.66 Bbl REUSE (AT WELL PAD)
2017 SWEPI LP Produced Fluid 226.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2018 SWEPI LP Produced Fluid 367.67 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Produced Fluid 233.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2018 SWEPI LP Produced Fluid 79.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 SWEPI LP Produced Fluid 250.65 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2275147 Primary Facility 2014-05-27 Routine/Partial Inspection No Violations Noted Preconstruction meeting. TLT
2294628 Primary Facility 2014-08-11 Preoperation Inspection No Violations Noted Preoperational inspection. Perimeter controls installed and site construction nearly complete. TLT
2294741 Primary Facility 2014-08-13 Drilling/Alteration No Violations Noted
2334557 Primary Facility 2015-01-07 Routine/Complete Inspection No Violations Noted
2353541 Primary Facility 2015-03-18 Routine/Complete Inspection No Violations Noted
2530606 Primary Facility 2016-10-20 Routine/Partial Inspection No Violations Noted 3 Marcellus Shale wells producing natural gas. Highest EC of puddle on pad 1.1 mS/cm today
2569250 Primary Facility 2017-03-08 Routine/Partial Inspection No Violations Noted 2 electrical conductivity readings w/ a PCSTestr 35:

inside wheelie trailer containment--0.27 mS/cm puddle on pad--0.36 mS/cm Air temp: 49 D F

2625836 Primary Facility 2017-08-10 Site Restoration No Violations Noted EC of puddle on pad w Oakton PCSTestr 35: 1.5 mS/cm
2644716 Primary Facility 2017-09-29 Site Restoration No Violations Noted No electrical conductivity readings obtained because I did not see any standing liquid on site. JLP
2836498 Primary Facility 2019-02-06 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of SWEPI's Shughart 534 Well Pad in Richmond Twp, Tioga County on 2/6/2019 at 1320 hours. The weather was cloudy with rain and 36 degrees. The E&S Plan was found in the mailbox by the site entrance sign. The onsite inspection log was found in the mailbox by the production tank. Last self-inspection was conducted on 2/5/2019 and noted no issues.

There are currently three wells (1H, 3H & 5H) producing onsite. All fluids field measured on the pad surface and in PCSM BMPs were within normal conductivity ranges. All PCSM BMPs were in place and functioning. The pad remains well vegetated and stabilized. No erosion issues were observed. The water bars along the steep portions of the access road are holding up well.

No violations noted today, I departed the site at 1355.

For data sources see[9]

References