If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-115-22528 | | Well ID: 37-115-22528 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.701878, -75.985344 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: BURKE G 005 | | Farm/Lease Name: BURKE G 005 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2018-08-01 | | Permit Date: 2018-08-01 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.701878 | | Latitude: 41.701878 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2018-08-01 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2019-02-09 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 92: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 87: | Line 119: | ||
| 2019 | | 2019 | ||
| [[CABOT OIL & GAS CORP]] | | [[CABOT OIL & GAS CORP]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3,009,892.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 104 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 112: | Line 144: | ||
| 2019 | | 2019 | ||
| [[CABOT OIL & GAS CORP]] | | [[CABOT OIL & GAS CORP]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,167.17 Tons |
| LANDFILL | | LANDFILL | ||
| 101247 | | 101247 | ||
Line 119: | Line 151: | ||
| 2019 | | 2019 | ||
| [[CABOT OIL & GAS CORP]] | | [[CABOT OIL & GAS CORP]] | ||
− | | Synthetic Liner Materials | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.16 Tons |
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301333 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Synthetic Liner Materials | ||
+ | | style="text-align: right;" | 15.50 Tons | ||
| LANDFILL | | LANDFILL | ||
| 101247 | | 101247 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 23.28 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE004 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Unused Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 2.27 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Waste Water Treatment Sludge | ||
+ | | style="text-align: right;" | 56.99 Tons | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 8,852.74 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE002 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Synthetic Liner Materials | ||
+ | | style="text-align: right;" | 7.78 Tons | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | 101714 | ||
|- | |- | ||
|} | |} |
Well ID: 37-115-22528 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.701878,"lon":-75.985344,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 155260 | |
Farm/Lease Name: BURKE G 005 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-08-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.701878 | |
Longitude: -75.985344 |
Date | Event |
---|---|
2018-08-01 | New Permit Application |
2019-02-09 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 3,009,892.00 | 104 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 1,167.17 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.16 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 15.50 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 23.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 2.27 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 56.99 Tons | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 8,852.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 7.78 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2818854 | Primary Facility | 2018-12-18 | Routine/Complete Inspection | No Violations Noted | I arrived on site at 1140 to conduct a routine complete inspection of the pad.
The pad was currently under construction, and the access road was only partially completed. Three excavators were being operated during the time of the inspection, all of them working in the vicinity of the pad surface itself (as opposed to the access road), and they appeared to be leveling out all the excavated material. I noticed a section of riprap rock on the slope along the access road. Upon closer inspection, I observed running water flowing down the section of rock armor and into the rock-lined swale along the access road. A review of the plans on site indicated this section of riprap was added as a red line modification. All E&S controls on site appeared to be in good condition and installed properly with the exception of one CFS section which was overtopping with water and had accumulated sediment that reached above the maintenance level (i.e. halfway point) of the sock's disturbed side. Operator, please consult your p |
2844180 | Primary Facility | 2019-02-07 | Preoperation Inspection | No Violations Noted | I arrived onsite at 1229 hours accompanied by Briana Cunningham to perform a pre-operational inspection of the pad. The weather was cloudy with moderate fog and a mild 45 degrees F.
During the inspection, there was a construction crew onsite removing large hay bails from a trailer; presumably for additional temporary stabilization as several of the slopes onsite containing erodible material had not yet been mulched and seeded. After performing a site inspection and reviewing the redlined plan onsite, I agree that all perimeter E&S BMPs, namely CFS sections #1-#16, are installed properly and according to plan specifications. No violations were noted. Please feel free to contact me with any questions. |
2850691 | Primary Facility | 2019-03-08 | Drilling/Alteration | No Violations Noted | At time of inspection.
On site for a new spud inspection, accompanied by Eric Miller (OGI trainee for the Department). There were 8 wells on site with conductors drilled and set at 118'. There were rig mats in place and drilling equipment being hauled to the well site. We took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[7]