X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-22528"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-22528
 
| Well ID: 37-115-22528
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.701878, -75.985344 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.701878, -75.985344 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BURKE G 005
 
| Farm/Lease Name: BURKE G 005
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 02/09/2019
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 8/1/2018
+
| Permit Date: 2018-08-01
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.701878
 
| Latitude: 41.701878
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-08-01
 +
| New Permit Application
 +
|-
 +
| 2019-02-09
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 119:
 
| 2019
 
| 2019
 
| [[CABOT OIL & GAS CORP]]
 
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 3,009,892.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 104
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 79: Line 136:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 84: Line 142:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2019-02
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 4.21 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 1,167.17 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 
|-
 
|-
| 2019-03
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 227.83 Tons
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 0.16 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301333
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 15.50 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 23.28 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE004
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Unused Fracturing Fluid Waste
 +
| style="text-align: right;" | 2.27 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 56.99 Tons
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8,852.74 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 7.78 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101714
 
|-
 
|-
 
|}
 
|}
Line 181: Line 283:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 00:22, 16 May 2020

Well Details

Well ID: 37-115-22528
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 155260
Farm/Lease Name: BURKE G 005
License Status:
Spud Date:
Permit Date: 2018-08-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.701878
Longitude: -75.985344

For data sources see[1][2][3]

Well History

Date Event
2018-08-01 New Permit Application
2019-02-09 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 3,009,892.00 104 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 CABOT OIL & GAS CORP Drill Cuttings 1,167.17 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.16 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 15.50 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 23.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 2.27 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 56.99 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 8,852.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 7.78 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2818854 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted I arrived on site at 1140 to conduct a routine complete inspection of the pad.

The pad was currently under construction, and the access road was only partially completed. Three excavators were being operated during the time of the inspection, all of them working in the vicinity of the pad surface itself (as opposed to the access road), and they appeared to be leveling out all the excavated material.

I noticed a section of riprap rock on the slope along the access road. Upon closer inspection, I observed running water flowing down the section of rock armor and into the rock-lined swale along the access road. A review of the plans on site indicated this section of riprap was added as a red line modification.

All E&S controls on site appeared to be in good condition and installed properly with the exception of one CFS section which was overtopping with water and had accumulated sediment that reached above the maintenance level (i.e. halfway point) of the sock's disturbed side. Operator, please consult your p

2844180 Primary Facility 2019-02-07 Preoperation Inspection No Violations Noted I arrived onsite at 1229 hours accompanied by Briana Cunningham to perform a pre-operational inspection of the pad. The weather was cloudy with moderate fog and a mild 45 degrees F.

During the inspection, there was a construction crew onsite removing large hay bails from a trailer; presumably for additional temporary stabilization as several of the slopes onsite containing erodible material had not yet been mulched and seeded.

After performing a site inspection and reviewing the redlined plan onsite, I agree that all perimeter E&S BMPs, namely CFS sections #1-#16, are installed properly and according to plan specifications.

No violations were noted. Please feel free to contact me with any questions.

2850691 Primary Facility 2019-03-08 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection, accompanied by Eric Miller (OGI trainee for the Department). There were 8 wells on site with conductors drilled and set at 118'. There were rig mats in place and drilling equipment being hauled to the well site. We took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[7]

References