X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-29879"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-29879
 
| Well ID: 37-063-29879
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.482720, -79.410298 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.482720, -79.410298 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Conemaugh Township,_Indiana_County,_Pennsylvania|Conemaugh Township]]
 
| Municipality: [[Conemaugh Township,_Indiana_County,_Pennsylvania|Conemaugh Township]]
 
|-
 
|-
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 19: Line 19:
 
| Farm/Lease Name: MELLON BK TRUSTEE FOR PAUL W. GRAFF 7
 
| Farm/Lease Name: MELLON BK TRUSTEE FOR PAUL W. GRAFF 7
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 11/21/1989
+
| Spud Date: 1989-11-21
 
|-
 
|-
| Permit Date: 10/2/1989
+
| Permit Date: 1989-10-02
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.482720
 
| Latitude: 40.482720
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1989-10-02
 +
| New Permit Application
 +
|-
 +
| 1989-11-21
 +
| Performed Spud Operation
 +
|-
 +
| 1989-11-29
 +
| Drilling Completion
 +
|-
 +
| 1989-12-06
 +
| Perforation
 +
|-
 +
| 1990-02-12
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 59: Line 125:
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
!scope="col" | Water Production Days
 +
|-
 +
| 1991
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 1772.00
 +
| style="text-align: right;" | 8
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 33,442.00
+
| style="text-align: right;" | 33442.00
 
| style="text-align: right;" | 139
 
| style="text-align: right;" | 139
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 42780.00
 +
| style="text-align: right;" | 160
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 20330.00
 +
| style="text-align: right;" | 75
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 40,173.00
+
| style="text-align: right;" | 40173
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 12,840.00
+
| style="text-align: right;" | 12840
 
| style="text-align: right;" | 52
 
| style="text-align: right;" | 52
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
Line 92: Line 185:
 
| style="text-align: right;" | 11
 
| style="text-align: right;" | 11
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 28,787.00
+
| style="text-align: right;" | 28787
 
| style="text-align: right;" | 135
 
| style="text-align: right;" | 135
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 39,103.00
+
| style="text-align: right;" | 39103
 
| style="text-align: right;" | 298
 
| style="text-align: right;" | 298
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 21,576.00
+
| style="text-align: right;" | 21576
 
| style="text-align: right;" | 234
 
| style="text-align: right;" | 234
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 19,540.00
+
| style="text-align: right;" | 19540
 
| style="text-align: right;" | 226
 
| style="text-align: right;" | 226
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 14,759.00
+
| style="text-align: right;" | 14759
 +
| style="text-align: right;" | 154
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 154
 
| style="text-align: right;" | 154
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |
+
| style="text-align: right;" | 0
| style="text-align: right;" | 0.00
 
| style="text-align: right;" |
 
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 13,874.00
+
| style="text-align: right;" | 13874
 
| style="text-align: right;" | 219
 
| style="text-align: right;" | 219
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 12,242.00
+
| style="text-align: right;" | 12242
 
| style="text-align: right;" | 294
 
| style="text-align: right;" | 294
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 164: Line 257:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 8,880.00
+
| style="text-align: right;" | 8880.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 7,825.00
+
| style="text-align: right;" | 7825.00
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 7,475.00
+
| style="text-align: right;" | 7475.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 293:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 302:
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 218: Line 311:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 227: Line 320:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 236: Line 329:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 245: Line 338:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 254: Line 347:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 3,049.00
 
| style="text-align: right;" | 3,049.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 3,363.00
 
| style="text-align: right;" | 3,363.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[ALLIANCE PETRO CO LLC]]
 +
| style="text-align: right;" | 2,784.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 286: Line 388:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 291: Line 394:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2003-0
+
| 2003
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0.00 Bbl
 
| style="text-align: right;" | 0.00 Bbl
Line 316: Line 420:
 
| 1870204
 
| 1870204
 
| Primary Facility
 
| Primary Facility
| 03/10/2010
+
| 2010-03-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 344: Line 448:
 
| 573515
 
| 573515
 
| Primary Facility
 
| Primary Facility
| 10/09/1996
+
| 1996-10-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 379: Line 483:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 19:27, 15 May 2020

Well Details

Well ID: 37-063-29879
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Conemaugh Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: MELLON BK TRUSTEE FOR PAUL W. GRAFF 7
License Status: ACTIVE
Spud Date: 1989-11-21
Permit Date: 1989-10-02
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.482720
Longitude: -79.410298

For data sources see[1][2][3]

Well History

Date Event
1989-10-02 New Permit Application
1989-11-21 Performed Spud Operation
1989-11-29 Drilling Completion
1989-12-06 Perforation
1990-02-12 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 PHILLIPS EXPLORATION INC 1772.00 8 0.00 0 0.00 0
1993 PHILLIPS EXPLORATION INC 33442.00 139 0.00 0 0.00 0
1994 PHILLIPS EXPLORATION INC 42780.00 160 0.00 0 0.00 0
1995 PHILLIPS EXPLORATION INC 20330.00 75 0.00 0 0.00 0
1996 PHILLIPS EXPLORATION INC 40173 365 0.00 0 0.00 0
1997 PHILLIPS EXPLORATION INC 12840 52 0.00 0 0.00 0
1998 PHILLIPS EXPLORATION INC 2,519.00 11 0.00 0 0.00 0
1999 PHILLIPS EXPLORATION INC 28787 135 0.00 0 0.00 0
2000 PHILLIPS EXPLORATION INC 39103 298 0.00 0 0.00 0
2001 PHILLIPS EXPLORATION INC 21576 234 0.00 0 0.00 0
2002 PHILLIPS EXPLORATION INC 19540 226 0.00 0 0.00 0
2003 PHILLIPS EXPLORATION INC 14759 154 0 154 0.00 0
2004 PHILLIPS EXPLORATION INC 13874 219 0.00 0 0.00 0
2005 PHILLIPS EXPLORATION INC 12242 294 0.00 0 0.00 0
2006 PHILLIPS EXPLORATION INC 10,931.00 365 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 8880.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 7825.00 352 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 7475.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 6,159.00 365 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 4,900.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 4,885.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 4,149.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 3,930.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 3,666.40 365 0.00 0 0.00 0
2016 XTO ENERGY INC 3,715.21 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 3,049.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 3,363.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 2,784.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 PHILLIPS EXPLORATION INC Brine 0.00 Bbl Brine or Industrial Waste Treatment Plt

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1870204 Primary Facility 2010-03-10 Routine/Complete Inspection No Violations Noted According to records, operator completed the well on 11/29/89 to depth of 3839 ft. WRAC submitted on 12/29/89. Well head consisted of 8¿ pipe to 4¿ to 2¿ production pipe with shut off valves. Production equipment consisted of separator; totalize meter (7588700 cubic feet) and 50 bbl brine tank (with < 25 bbl fluid). At the time of inspection, no IW and E&S issues at the site. No odor of gas leakage at well head. Well head was recently painted. The well tag was also covered. DEP is requesting a new well tag on the well head
2635077 Primary Facility 2017-09-12 Routine/Complete Inspection No Violations Noted At time of inspection, well drilled and appears equipped for production.
539914 Primary Facility 1989-11-22 Routine/Complete Inspection No Violations Noted NO WVR NEEDED; E&S OK
553856 Primary Facility 1990-11-29 Site Restoration No Violations Noted SITE RESTORED; TANK
573515 Primary Facility 1996-10-09 Routine/Complete Inspection No Violations Noted TANK; E&S OK

For data sources see[7]

References