If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-27816 | | Well ID: 37-125-27816 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.0974, -80.099672 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 17: | Line 17: | ||
| Well Pad ID: [[152318]] | | Well Pad ID: [[152318]] | ||
|- | |- | ||
− | | Farm/Lease Name: CAPTAIN USA | + | | Farm/Lease Name: CAPTAIN USA |
|- | |- | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 2015-12- | + | | Spud Date: 2015-12-07 |
|- | |- | ||
| Permit Date: 2015-12-01 | | Permit Date: 2015-12-01 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 40.0974 | | Latitude: 40.0974 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2015-12-01 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2015-12-05 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2015-12-21 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2016-05-02 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-03 | ||
+ | | Performed Stage 1 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-04 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-04 | ||
+ | | Performed Stage 2 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-05 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-05 | ||
+ | | Performed Stage 3 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | Performed Stage 4 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-07 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-07 | ||
+ | | Performed Stage 5 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-07 | ||
+ | | Performed Stage 6 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-08 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-08 | ||
+ | | Performed Stage 7 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-08 | ||
+ | | Performed Stage 8 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-09 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-09 | ||
+ | | Performed Stage 9 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-10 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-10 | ||
+ | | Performed Stage 10 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-11 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-11 | ||
+ | | Performed Stage 11 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-11 | ||
+ | | Performed Stage 12 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-12 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-12 | ||
+ | | Performed Stage 13 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-13 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-13 | ||
+ | | Performed Stage 14 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-13 | ||
+ | | Performed Stage 15 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-14 | ||
+ | | Performed Stage 16 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-15 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-15 | ||
+ | | Performed Stage 17 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-16 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-16 | ||
+ | | Performed Stage 18 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-17 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-17 | ||
+ | | Performed Stage 19 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-18 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-18 | ||
+ | | Performed Stage 20 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-19 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-19 | ||
+ | | Performed Stage 21 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-20 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-20 | ||
+ | | Performed Stage 22 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-21 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-21 | ||
+ | | Performed Stage 23 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-22 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-22 | ||
+ | | Performed Stage 24 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-23 | ||
+ | | Performed Stage 25 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-24 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-24 | ||
+ | | Performed Stage 26 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-24 | ||
+ | | Performed Stage 27 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-25 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-25 | ||
+ | | Performed Stage 28 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-26 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-26 | ||
+ | | Performed Stage 29 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-27 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-27 | ||
+ | | Performed Stage 30 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-28 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-28 | ||
+ | | Performed Stage 31 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-29 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-29 | ||
+ | | Performed Stage 32 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-30 | ||
+ | | Performed Stage 33 of Stimulation | ||
+ | |- | ||
+ | | 2018-07-19 | ||
+ | | Deviated | ||
+ | |- | ||
+ | | 2018-07-19 | ||
+ | | Newly Drilled | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 269: | ||
| 2016-06-01 | | 2016-06-01 | ||
| 2016-07-02 | | 2016-07-02 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7,695 |
− | | style="text-align: right;" | 10,488, | + | | style="text-align: right;" | 10,488,000 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 404: | Line 611: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2016-06-03 | ||
+ | | style="text-align: right;" | 1 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,073 | ||
+ | | style="text-align: right;" | 9,765 | ||
+ | |- | ||
+ | | 2016-06-04 | ||
+ | | style="text-align: right;" | 2 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,107 | ||
+ | | style="text-align: right;" | 9,472 | ||
+ | |- | ||
+ | | 2016-06-05 | ||
+ | | style="text-align: right;" | 3 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,076 | ||
+ | | style="text-align: right;" | 9,282 | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | style="text-align: right;" | 4 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,080 | ||
+ | | style="text-align: right;" | 9,467 | ||
+ | |- | ||
+ | | 2016-06-07 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,060 | ||
+ | | style="text-align: right;" | 9,469 | ||
+ | |- | ||
+ | | 2016-06-07 | ||
+ | | style="text-align: right;" | 6 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,168 | ||
+ | | style="text-align: right;" | 9,483 | ||
+ | |- | ||
+ | | 2016-06-08 | ||
+ | | style="text-align: right;" | 7 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,059 | ||
+ | | style="text-align: right;" | 9,293 | ||
+ | |- | ||
+ | | 2016-06-08 | ||
+ | | style="text-align: right;" | 8 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,134 | ||
+ | | style="text-align: right;" | 9,574 | ||
+ | |- | ||
+ | | 2016-06-09 | ||
+ | | style="text-align: right;" | 9 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,137 | ||
+ | | style="text-align: right;" | 9,274 | ||
+ | |- | ||
+ | | 2016-06-10 | ||
+ | | style="text-align: right;" | 10 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,127 | ||
+ | | style="text-align: right;" | 9,303 | ||
+ | |- | ||
+ | | 2016-06-11 | ||
+ | | style="text-align: right;" | 11 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,059 | ||
+ | | style="text-align: right;" | 9,425 | ||
+ | |- | ||
+ | | 2016-06-11 | ||
+ | | style="text-align: right;" | 12 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,922 | ||
+ | | style="text-align: right;" | 9,491 | ||
+ | |- | ||
+ | | 2016-06-12 | ||
+ | | style="text-align: right;" | 13 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,029 | ||
+ | | style="text-align: right;" | 9,386 | ||
+ | |- | ||
+ | | 2016-06-13 | ||
+ | | style="text-align: right;" | 14 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,940 | ||
+ | | style="text-align: right;" | 9,440 | ||
+ | |- | ||
+ | | 2016-06-13 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,983 | ||
+ | | style="text-align: right;" | 9,333 | ||
+ | |- | ||
+ | | 2016-06-14 | ||
+ | | style="text-align: right;" | 16 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,727 | ||
+ | | style="text-align: right;" | 9,416 | ||
+ | |- | ||
+ | | 2016-06-15 | ||
+ | | style="text-align: right;" | 17 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,005 | ||
+ | | style="text-align: right;" | 9,282 | ||
+ | |- | ||
+ | | 2016-06-16 | ||
+ | | style="text-align: right;" | 18 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,046 | ||
+ | | style="text-align: right;" | 9,297 | ||
+ | |- | ||
+ | | 2016-06-17 | ||
+ | | style="text-align: right;" | 19 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,018 | ||
+ | | style="text-align: right;" | 9,290 | ||
+ | |- | ||
+ | | 2016-06-18 | ||
+ | | style="text-align: right;" | 20 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,099 | ||
+ | | style="text-align: right;" | 9,311 | ||
+ | |- | ||
+ | | 2016-06-19 | ||
+ | | style="text-align: right;" | 21 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 9,044 | ||
+ | | style="text-align: right;" | 9,293 | ||
+ | |- | ||
+ | | 2016-06-20 | ||
+ | | style="text-align: right;" | 22 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,919 | ||
+ | | style="text-align: right;" | 9,182 | ||
+ | |- | ||
+ | | 2016-06-21 | ||
+ | | style="text-align: right;" | 23 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,930 | ||
+ | | style="text-align: right;" | 9,376 | ||
+ | |- | ||
+ | | 2016-06-22 | ||
+ | | style="text-align: right;" | 24 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,639 | ||
+ | | style="text-align: right;" | 9,094 | ||
+ | |- | ||
+ | | 2016-06-23 | ||
+ | | style="text-align: right;" | 25 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,910 | ||
+ | | style="text-align: right;" | 9,441 | ||
+ | |- | ||
+ | | 2016-06-24 | ||
+ | | style="text-align: right;" | 26 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,901 | ||
+ | | style="text-align: right;" | 9,414 | ||
+ | |- | ||
+ | | 2016-06-24 | ||
+ | | style="text-align: right;" | 27 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,984 | ||
+ | | style="text-align: right;" | 9,562 | ||
+ | |- | ||
+ | | 2016-06-25 | ||
+ | | style="text-align: right;" | 28 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,800 | ||
+ | | style="text-align: right;" | 9,409 | ||
+ | |- | ||
+ | | 2016-06-26 | ||
+ | | style="text-align: right;" | 29 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,655 | ||
+ | | style="text-align: right;" | 9,099 | ||
+ | |- | ||
+ | | 2016-06-27 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,992 | ||
+ | | style="text-align: right;" | 9,543 | ||
+ | |- | ||
+ | | 2016-06-28 | ||
+ | | style="text-align: right;" | 31 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,731 | ||
+ | | style="text-align: right;" | 9,160 | ||
+ | |- | ||
+ | | 2016-06-29 | ||
+ | | style="text-align: right;" | 32 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,967 | ||
+ | | style="text-align: right;" | 9,348 | ||
+ | |- | ||
+ | | 2016-06-30 | ||
+ | | style="text-align: right;" | 33 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 8,644,638 | ||
+ | | style="text-align: right;" | 8,864 | ||
+ | | style="text-align: right;" | 9,428 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 453: | Line 907: | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 982,080.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 324 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 470: | Line 924: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 475: | Line 930: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2015 | + | | 2015 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drilling Fluid Waste |
− | | | + | | style="text-align: right;" | 31.67 Bbl |
− | | | + | | REUSE OTHER THAN ROAD SPREADING |
+ | | | ||
|- | |- | ||
− | | 2015 | + | | 2015 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Drilling Fluid Waste | |
− | |||
− | |||
− | |||
− | |||
− | | Drilling Fluid Waste | ||
| style="text-align: right;" | 2,313.33 Bbl | | style="text-align: right;" | 2,313.33 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2015 | + | | 2015 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings |
− | | | + | | style="text-align: right;" | 54.78 Tons |
− | | | + | | LANDFILL |
+ | | 100663 | ||
|- | |- | ||
− | | 2015 | + | | 2015 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 38.33 Bbl | | style="text-align: right;" | 38.33 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2015 |
− | | Drill Cuttings | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings |
+ | | style="text-align: right;" | 226.00 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100172 | | 100172 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Drilling Fluid Waste | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Drilling Fluid Waste | ||
| style="text-align: right;" | 46.67 Bbl | | style="text-align: right;" | 46.67 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes |
+ | | style="text-align: right;" | 331.30 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2016- | + | | 2016 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 7.33 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 2.88 Bbl | | style="text-align: right;" | 2.88 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| WMGR123SW019 | | WMGR123SW019 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Drilling Fluid Waste | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Drilling Fluid Waste | ||
| style="text-align: right;" | 443.17 Bbl | | style="text-align: right;" | 443.17 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | RESIDUAL WASTE | + | | style="text-align: right;" | 2.50 Bbl |
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2016- | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings |
− | | | + | | style="text-align: right;" | 253.84 Tons |
− | | | + | | RESIDUAL WASTE TRANSFER FACILITY |
+ | | 301071 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 16.76 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-157-25511 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Servicing Fluid |
+ | | style="text-align: right;" | 0.55 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100592 | | 100592 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | + | | [[RICE DRILLING B LLC]] | |
− | + | | Fracturing Fluid Waste | |
− | | | + | | style="text-align: right;" | 3,929.64 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | style="text-align: right;" | | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Produced Fluid | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 1,898.45 Bbl | | style="text-align: right;" | 1,898.45 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW019 | | WMGR123SW019 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drilling Fluid Waste |
− | | | + | | style="text-align: right;" | 793.92 Bbl |
− | | | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) |
+ | | WMGR123SW005 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | Soil Contaminated by Oil & Gas Related Spills | + | | [[RICE DRILLING B LLC]] |
+ | | Soil Contaminated by Oil & Gas Related Spills | ||
| style="text-align: right;" | 0.90 Tons | | style="text-align: right;" | 0.90 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100663 | | 100663 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Soil Contaminated by Oil |
+ | | style="text-align: right;" | 0.90 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100663 | | 100663 | ||
|- | |- | ||
− | | 2016- | + | | 2016 |
− | | Waste | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Fracturing Fluid Waste |
+ | | style="text-align: right;" | 551.57 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 31.17 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100592 | | 100592 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | Waste Water Treatment Sludge | + | | [[RICE DRILLING B LLC]] |
+ | | Waste Water Treatment Sludge | ||
| style="text-align: right;" | 22.75 Tons | | style="text-align: right;" | 22.75 Tons | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| 2014-541 | | 2014-541 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Waste Water Treatment Sludge |
− | | | + | | style="text-align: right;" | 0.78 Tons |
− | | | + | | LANDFILL |
+ | | 100592 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes |
+ | | style="text-align: right;" | 63.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings |
− | | | + | | style="text-align: right;" | 363.67 Tons |
− | | | + | | LANDFILL |
+ | | 100663 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 687.44 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
+ | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | REUSE | + | | style="text-align: right;" | 9,911.55 Bbl |
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Synthetic Liner Materials |
− | | | + | | style="text-align: right;" | 13.99 Tons |
− | | | + | | LANDFILL |
+ | | 100663 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings |
− | | | + | | style="text-align: right;" | 206.68 Tons |
− | | | + | | LANDFILL |
+ | | 100172 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | REUSE | + | | style="text-align: right;" | 28.51 Bbl |
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | + | | [[RICE DRILLING B LLC]] | |
− | + | | Other Oil & Gas Wastes | |
− | + | | style="text-align: right;" | 86.55 Bbl | |
− | |||
− | | | ||
− | |||
− | | Other Oil & Gas Wastes | ||
− | | style="text-align: right;" | | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 37.10 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW019 |
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Other Oil & Gas Wastes | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Other Oil & Gas Wastes | ||
| style="text-align: right;" | 21.37 Bbl | | style="text-align: right;" | 21.37 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Soil Contaminated by Oil & Gas Related Spills |
+ | | style="text-align: right;" | 0.13 Tons | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | 301280 |
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Produced Fluid | |
− | + | | style="text-align: right;" | 2,993.80 Bbl | |
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
− | | style="text-align: right;" | | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Soil Contaminated by Oil |
+ | | style="text-align: right;" | 0.13 Tons | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | 301280 |
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 17.85 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
+ | | WMGR123SW010 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Synthetic Liner Materials |
− | | | + | | style="text-align: right;" | 3.29 Tons |
− | | | + | | LANDFILL |
+ | | 100663 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 2,989.19 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 739.04 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | | + | | 2018 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | REUSE | + | | style="text-align: right;" | 175.13 Bbl |
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
− | | | + | | 2018 |
− | | Other Oil & Gas Wastes | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes |
+ | | style="text-align: right;" | 38.33 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | | + | | 2018 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 376.94 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2019 |
− | + | | [[RICE DRILLING B LLC]] | |
− | + | | Other Oil & Gas Wastes | |
− | + | | style="text-align: right;" | 10.56 Bbl | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | style="text-align: right;" | | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Produced Fluid | |
− | + | | style="text-align: right;" | 22.64 Bbl | |
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
− | | style="text-align: right;" | | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW010 |
|- | |- | ||
− | | | + | | 2019 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | + | | Produced Fluid | |
− | + | | style="text-align: right;" | 20.60 Bbl | |
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
− | | style="text-align: right;" | | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
− | | | + | | 2019 |
− | | Produced Fluid | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 42.63 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | + | | 2019 | |
− | + | | [[RICE DRILLING B LLC]] | |
− | + | | Produced Fluid | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | 2019 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | Produced Fluid | ||
| style="text-align: right;" | 25.54 Bbl | | style="text-align: right;" | 25.54 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW019 | | WMGR123SW019 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes |
+ | | style="text-align: right;" | 134.00 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | + | | [[RICE DRILLING B LLC]] | |
− | | | + | | Produced Fluid |
− | + | | style="text-align: right;" | 1,149.72 Bbl | |
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
− | | style="text-align: right;" | | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
Line 1,088: | Line 1,365: | ||
| No Violations Noted | | No Violations Noted | ||
| On 11/18/15, I performed a follow up inspection for the Captain USA site and made the following observations: | | On 11/18/15, I performed a follow up inspection for the Captain USA site and made the following observations: | ||
+ | |- | ||
+ | | 2473440 | ||
+ | | Primary Facility | ||
+ | | 2015-11-04 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | On 11/4/2015, I performed a complaint response inspection at the Captain USA site in response to reports of increased erosion and sedimentation impacting the waters of the commonwealth as well as possible petroleum contamination. | ||
+ | |- | ||
+ | | 2476811 | ||
+ | | Primary Facility | ||
+ | | 2015-11-10 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | On 11/10/15, I performed a complaint response inspection of the Captain USA well site accompanied by WQS Bryon Miller and Environmental Trainee John Parry in response to reports of increased erosion and sedimentation impacting the waters of the commonwealth, water samples were taken for UVIR analysis. | ||
+ | |- | ||
+ | | 2477332 | ||
+ | | Primary Facility | ||
+ | | 2015-11-12 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | On 11/12/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation affecting the waters of the commonwealth. | ||
+ | |- | ||
+ | | 2477614 | ||
+ | | Primary Facility | ||
+ | | 2015-11-25 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On 11/25/15, I performed a routine complete inspection accompanied by Rice representative Jovan Rohena of the Captain USA Well Site in response to a request from the operator for a pre-operation inspection and made the following observations: | ||
+ | -operation inspection could not be completed for the site as the perimeter controls near the entrance including a large diversion ditch were under construction at the time of inspection. No violation. Pre-operation inspection not completed, site not ready for drilling. | ||
+ | |||
+ | -40 05 32.154N; 80 06 01.818W | ||
+ | -40 05 30.066N; 80 06 03.768W | ||
+ | -40 05 44.916N; 80 05 57.714W | ||
+ | |||
+ | |||
+ | |- | ||
+ | | 2478242 | ||
+ | | Primary Facility | ||
+ | | 2015-12-02 | ||
+ | | Preoperation Inspection | ||
+ | | No Violations Noted | ||
+ | | On 12/2/15, I completed a pre-operation inspection for the Captain USA Well Site in response to an operator request and made the following observations: | ||
+ | -operations inspection to be completed. | ||
+ | -Clay sediments observed in rock lined diversion channel may indicate insufficient lining thickness. No violation, inspection and remediation recommended. | ||
+ | -accumulating immediately beyond perimeter controls on the northwest side of the area and may be causing accelerated erosion. | ||
+ | -Samples taken from water pooled on site and from runoff taken for MBAS analysis due to significant observed foaming in the stream channel and in water pooling at site controls. | ||
+ | Conclusion: | ||
+ | |||
+ | |- | ||
+ | | 2478547 | ||
+ | | Primary Facility | ||
+ | | 2015-12-17 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | On 12/17/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation. | ||
+ | |- | ||
+ | | 2478902 | ||
+ | | Primary Facility | ||
+ | | 2015-12-22 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | On 12/22/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation. | ||
+ | |- | ||
+ | | 2479428 | ||
+ | | Primary Facility | ||
+ | | 2015-12-24 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | On 12/24/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation. | ||
+ | |- | ||
+ | | 2480387 | ||
+ | | Primary Facility | ||
+ | | 2015-12-31 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | On 12/31/15, I performed a complaint response inspection of the Captain USA well site in response to reports of oily material running off of the site and made the following observations: | ||
+ | |||
+ | |||
+ | |||
|- | |- | ||
| 2481416 | | 2481416 |
Well ID: 37-125-27816 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.0974,"lon":-80.099672,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Bethlehem Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 152318 | |
Farm/Lease Name: CAPTAIN USA | |
License Status: Active | |
Spud Date: 2015-12-07 | |
Permit Date: 2015-12-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.0974 | |
Longitude: -80.099672 |
Date | Event |
---|---|
2015-12-01 | New Permit Application |
2015-12-05 | Performed Spud Operation |
2015-12-21 | Drilling Completion |
2016-05-02 | Perforation |
2016-06-03 | Performed Stage 1 of Stimulation |
2016-06-04 | Perforation |
2016-06-04 | Performed Stage 2 of Stimulation |
2016-06-05 | Perforation |
2016-06-05 | Performed Stage 3 of Stimulation |
2016-06-06 | Perforation |
2016-06-06 | Performed Stage 4 of Stimulation |
2016-06-07 | Perforation |
2016-06-07 | Performed Stage 5 of Stimulation |
2016-06-07 | Performed Stage 6 of Stimulation |
2016-06-08 | Perforation |
2016-06-08 | Performed Stage 7 of Stimulation |
2016-06-08 | Performed Stage 8 of Stimulation |
2016-06-09 | Perforation |
2016-06-09 | Performed Stage 9 of Stimulation |
2016-06-10 | Perforation |
2016-06-10 | Performed Stage 10 of Stimulation |
2016-06-11 | Perforation |
2016-06-11 | Performed Stage 11 of Stimulation |
2016-06-11 | Performed Stage 12 of Stimulation |
2016-06-12 | Perforation |
2016-06-12 | Performed Stage 13 of Stimulation |
2016-06-13 | Perforation |
2016-06-13 | Performed Stage 14 of Stimulation |
2016-06-13 | Performed Stage 15 of Stimulation |
2016-06-14 | Perforation |
2016-06-14 | Performed Stage 16 of Stimulation |
2016-06-15 | Perforation |
2016-06-15 | Performed Stage 17 of Stimulation |
2016-06-16 | Perforation |
2016-06-16 | Performed Stage 18 of Stimulation |
2016-06-17 | Perforation |
2016-06-17 | Performed Stage 19 of Stimulation |
2016-06-18 | Perforation |
2016-06-18 | Performed Stage 20 of Stimulation |
2016-06-19 | Perforation |
2016-06-19 | Performed Stage 21 of Stimulation |
2016-06-20 | Perforation |
2016-06-20 | Performed Stage 22 of Stimulation |
2016-06-21 | Perforation |
2016-06-21 | Performed Stage 23 of Stimulation |
2016-06-22 | Perforation |
2016-06-22 | Performed Stage 24 of Stimulation |
2016-06-23 | Performed Stage 25 of Stimulation |
2016-06-24 | Perforation |
2016-06-24 | Performed Stage 26 of Stimulation |
2016-06-24 | Performed Stage 27 of Stimulation |
2016-06-25 | Perforation |
2016-06-25 | Performed Stage 28 of Stimulation |
2016-06-26 | Perforation |
2016-06-26 | Performed Stage 29 of Stimulation |
2016-06-27 | Perforation |
2016-06-27 | Performed Stage 30 of Stimulation |
2016-06-28 | Perforation |
2016-06-28 | Performed Stage 31 of Stimulation |
2016-06-29 | Perforation |
2016-06-29 | Performed Stage 32 of Stimulation |
2016-06-30 | Performed Stage 33 of Stimulation |
2018-07-19 | Deviated |
2018-07-19 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-06-01 | 2016-07-02 | 7,695 | 10,488,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FE-100L | FTSI | Iron Control | Water | 7732-18-5 | 65 | 0.000516834 | 514.761 |
Iminodiacetate disodium salt | 17593-73-6 | 0.2 | 0.00000159 | 1.584 | ||||
Trisodium Nitrilotriacetic acid | 5064-31-3 | 2 | 0.00001590 | 15.839 | ||||
Ethylenediaminetriaceticacid, trisodium salt | 19019-43-3 | 0.8 | 0.00000636 | 6.336 | ||||
Sodium Hydroxide | 1310-73-2 | 2 | 0.00001590 | 15.839 | ||||
Sodium formate | 141-53-7 | 0.6 | 0.00000477 | 4.752 | ||||
Tetrasodium EDTA | 64-02-8 | 41 | 0.000326003 | 324.696 | ||||
Sodium glycolate | 2836-32-0 | 1.5 | 0.00001193 | 11.879 | ||||
CI-150 | FTSI | Acid Corrosion Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.000359643 | 358.201 | |
Polyalkylene glycol | Proprietary | 10 | 0.000119881 | 119.4 | ||||
Quarternary ammonium compound | Proprietary | 10 | 0.000119881 | 119.4 | ||||
Organic amine resin salt | Proprietary | 30 | 0.000359643 | 358.201 | ||||
Aromatic aldehyde | Proprietary | 30 | 0.000359643 | 358.201 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.000119881 | 119.4 | ||||
Isopropanol | 67-63-0 | 30 | 0.000359643 | 358.201 | ||||
Hydrochloric Acid (HCl) | FTSI | Acid | Hydrogen Chloride | 7647-01-0 | 15 | 0.0490839 | 48887.1 | |
FRW-600 | FTSI | Friction Reducer | Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00002551 | 25.411 | |
Hydrotreated light distillate | 64742-47-8 | 30 | 0.000153077 | 152.463 | ||||
Ammonium acetate | 631-61-8 | 10 | 0.00005103 | 50.821 | ||||
Acrylamide Polymer | Proprietary | 30 | 0.000153077 | 152.463 | ||||
Water | 7732-18-5 | 40 | 0.000204103 | 203.284 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00002551 | 25.411 | ||||
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00002551 | 25.411 | ||||
K-Bac 1020 DBNPA | WST | Bacteriacide | Water | 7732-18-5 | 30 | 0.000967728 | 963.848 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 21 | 0.00067741 | 674.693 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.00161288 | 1606.41 | ||||
Insitucide | Silver Creek | Biocide | Water | 7732-18-5 | 87.5 | 0.0109353 | 10891.5 | |
Hypochlorous Acid, Sodium Salt | 7681-52-9 | 12.5 | 0.00156219 | 1555.93 | ||||
Sand (Proppant) | Silver Creek | Proppant | Silica Substrate | 14808-60-7 | 87 | 10.1914 | 10,150,500.0 | |
UFR-47 | Silver Creek Services | Friction Reducer | Alcohols, C-12-16, ethoxylated | 68551-12-2 | 5 | 0.000537956 | 535.799 | |
Hydrotreated light distillate (petroleum) | 64742-47-8 | 30 | 0.00322774 | 3214.79 | ||||
Cationic Copolymer of acrylamide | 69418-26-4 | 30 | 0.00322774 | 3214.79 | ||||
Proprietary Ingredient | Proprietary | 5 | 0.000537956 | 535.799 | ||||
FR NI 200 | ECM | Friction Reducer | Alcohols, ethoxylated | 68551-12-2 | 2 | 0.000559764 | 557.519 | |
Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.000559764 | 557.519 | ||||
Petroleum Distillate | 64742-47-8 | 20 | 0.00559764 | 5575.19 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000279882 | 278.76 | ||||
Water | 7732-18-5 | 50 | 0.0139941 | 13938 | ||||
Copolymer of Two Propenamide | 69418-26-4 | 30 | 0.00839646 | 8362.79 | ||||
SI-800 | Silverback Chemical | Scale Inhibitor | POLYCARBOXYLIC ACID SALT MIXTURE | Proprietary | 40 | 0.0107251 | 10682.1 | |
NE-100 | FTSI | Non-emulsifier | 2-Butoxyethanol | 111-76-2 | 10 | 0.00003069 | 30.568 | |
Water | 7732-18-5 | 90 | 0.000276217 | 275.11 | ||||
2-Propanol | 67-63-0 | 10 | 0.00003069 | 30.568 | ||||
Dodecylbenzenesulfonic acid | 27176-87-0 | 5 | 0.00001535 | 15.284 | ||||
Water | Rice Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.8744 | 87,522,000.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-06-03 | 1 | Silica Sand | 8,644,638 | 9,073 | 9,765 |
2016-06-04 | 2 | Silica Sand | 8,644,638 | 9,107 | 9,472 |
2016-06-05 | 3 | Silica Sand | 8,644,638 | 9,076 | 9,282 |
2016-06-06 | 4 | Silica Sand | 8,644,638 | 9,080 | 9,467 |
2016-06-07 | 5 | Silica Sand | 8,644,638 | 9,060 | 9,469 |
2016-06-07 | 6 | Silica Sand | 8,644,638 | 9,168 | 9,483 |
2016-06-08 | 7 | Silica Sand | 8,644,638 | 9,059 | 9,293 |
2016-06-08 | 8 | Silica Sand | 8,644,638 | 9,134 | 9,574 |
2016-06-09 | 9 | Silica Sand | 8,644,638 | 9,137 | 9,274 |
2016-06-10 | 10 | Silica Sand | 8,644,638 | 9,127 | 9,303 |
2016-06-11 | 11 | Silica Sand | 8,644,638 | 9,059 | 9,425 |
2016-06-11 | 12 | Silica Sand | 8,644,638 | 8,922 | 9,491 |
2016-06-12 | 13 | Silica Sand | 8,644,638 | 9,029 | 9,386 |
2016-06-13 | 14 | Silica Sand | 8,644,638 | 8,940 | 9,440 |
2016-06-13 | 15 | Silica Sand | 8,644,638 | 8,983 | 9,333 |
2016-06-14 | 16 | Silica Sand | 8,644,638 | 8,727 | 9,416 |
2016-06-15 | 17 | Silica Sand | 8,644,638 | 9,005 | 9,282 |
2016-06-16 | 18 | Silica Sand | 8,644,638 | 9,046 | 9,297 |
2016-06-17 | 19 | Silica Sand | 8,644,638 | 9,018 | 9,290 |
2016-06-18 | 20 | Silica Sand | 8,644,638 | 9,099 | 9,311 |
2016-06-19 | 21 | Silica Sand | 8,644,638 | 9,044 | 9,293 |
2016-06-20 | 22 | Silica Sand | 8,644,638 | 8,919 | 9,182 |
2016-06-21 | 23 | Silica Sand | 8,644,638 | 8,930 | 9,376 |
2016-06-22 | 24 | Silica Sand | 8,644,638 | 8,639 | 9,094 |
2016-06-23 | 25 | Silica Sand | 8,644,638 | 8,910 | 9,441 |
2016-06-24 | 26 | Silica Sand | 8,644,638 | 8,901 | 9,414 |
2016-06-24 | 27 | Silica Sand | 8,644,638 | 8,984 | 9,562 |
2016-06-25 | 28 | Silica Sand | 8,644,638 | 8,800 | 9,409 |
2016-06-26 | 29 | Silica Sand | 8,644,638 | 8,655 | 9,099 |
2016-06-27 | 30 | Silica Sand | 8,644,638 | 8,992 | 9,543 |
2016-06-28 | 31 | Silica Sand | 8,644,638 | 8,731 | 9,160 |
2016-06-29 | 32 | Silica Sand | 8,644,638 | 8,967 | 9,348 |
2016-06-30 | 33 | Silica Sand | 8,644,638 | 8,864 | 9,428 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 730,151.41 | 90 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,464,470.63 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,362,668.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 982,080.00 | 324 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 31.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 2,313.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 54.78 Tons | LANDFILL | 100663 |
2015 | RICE DRILLING B LLC | Produced Fluid | 38.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 226.00 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 46.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 331.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 7.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 2.88 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 443.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 2.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 253.84 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2016 | RICE DRILLING B LLC | Produced Fluid | 16.76 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RICE DRILLING B LLC | Servicing Fluid | 0.55 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3,929.64 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 1,898.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 793.92 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.90 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.90 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 551.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 31.17 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 22.75 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 0.78 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 63.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 363.67 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Produced Fluid | 687.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 9,911.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 13.99 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 206.68 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 28.51 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 86.55 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 37.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 21.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.13 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 2,993.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.13 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 17.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 3.29 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 2,989.19 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 739.04 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 175.13 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 38.33 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 376.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 10.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 22.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 20.60 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Produced Fluid | 42.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 25.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 134.00 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,149.72 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2424348 | Primary Facility | 2015-10-30 | Routine/Complete Inspection | No Violations Noted | |
2431587 | Primary Facility | 2015-12-09 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Service auger rig |
2434231 | Primary Facility | 2015-12-18 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2436550 | Primary Facility | 2015-12-24 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2449351 | Primary Facility | 2016-02-12 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Moved onto this well on 2/10/15 and resumed drilling at 7406 ft. KB. Operator drilled to 7990 ft. on 2/11/16. The top of the Marcellus Formation was found at 7676 ft. The Onondaga Formation was tagged at 7807 ft. Currently TIH with 3 ½” fiberglass tubing to plug back to KOP. Note: This is a Conservation Well. |
2454239 | Primary Facility | 2015-11-09 | Routine/Complete Inspection | No Violations Noted | On 11/9/15, I performed a routine complete inspection of the Captain USA well site and made the following observations: |
2454528 | Primary Facility | 2015-11-13 | Follow-up Inspection | No Violations Noted | On 11/13/15, I performed a follow up inspection of the Captain USA well site in response to issues noted in an 11/9/15 inspection of the same site and made the following observations: |
2454763 | Primary Facility | 2016-02-29 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Reentered this well on 2/19/16 and tagged cement plug at 6912 ft. KB. KOP was at 7188 ft. EOB on the curve was at 8237 ft. MD (7781 ft. TVD). TD was at 13,163 ft. MD (7684 ft. TVD) on 2/22/16. The 5 ½” casing was set at 13,153 ft. and cemented to surface with 10 bbls returned. Note: This is a Conservation Well. |
2454865 | Primary Facility | 2015-11-18 | Follow-up Inspection | No Violations Noted | On 11/18/15, I performed a follow up inspection for the Captain USA site and made the following observations: |
2473440 | Primary Facility | 2015-11-04 | Complaint Inspection | No Violations Noted | On 11/4/2015, I performed a complaint response inspection at the Captain USA site in response to reports of increased erosion and sedimentation impacting the waters of the commonwealth as well as possible petroleum contamination. |
2476811 | Primary Facility | 2015-11-10 | Complaint Inspection | No Violations Noted | On 11/10/15, I performed a complaint response inspection of the Captain USA well site accompanied by WQS Bryon Miller and Environmental Trainee John Parry in response to reports of increased erosion and sedimentation impacting the waters of the commonwealth, water samples were taken for UVIR analysis. |
2477332 | Primary Facility | 2015-11-12 | Complaint Inspection | No Violations Noted | On 11/12/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation affecting the waters of the commonwealth. |
2477614 | Primary Facility | 2015-11-25 | Routine/Complete Inspection | No Violations Noted | On 11/25/15, I performed a routine complete inspection accompanied by Rice representative Jovan Rohena of the Captain USA Well Site in response to a request from the operator for a pre-operation inspection and made the following observations:
-operation inspection could not be completed for the site as the perimeter controls near the entrance including a large diversion ditch were under construction at the time of inspection. No violation. Pre-operation inspection not completed, site not ready for drilling. -40 05 32.154N; 80 06 01.818W -40 05 30.066N; 80 06 03.768W -40 05 44.916N; 80 05 57.714W
|
2478242 | Primary Facility | 2015-12-02 | Preoperation Inspection | No Violations Noted | On 12/2/15, I completed a pre-operation inspection for the Captain USA Well Site in response to an operator request and made the following observations:
-operations inspection to be completed. -Clay sediments observed in rock lined diversion channel may indicate insufficient lining thickness. No violation, inspection and remediation recommended. -accumulating immediately beyond perimeter controls on the northwest side of the area and may be causing accelerated erosion. -Samples taken from water pooled on site and from runoff taken for MBAS analysis due to significant observed foaming in the stream channel and in water pooling at site controls. Conclusion: |
2478547 | Primary Facility | 2015-12-17 | Complaint Inspection | No Violations Noted | On 12/17/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation. |
2478902 | Primary Facility | 2015-12-22 | Complaint Inspection | No Violations Noted | On 12/22/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation. |
2479428 | Primary Facility | 2015-12-24 | Complaint Inspection | No Violations Noted | On 12/24/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation. |
2480387 | Primary Facility | 2015-12-31 | Complaint Inspection | No Violations Noted | On 12/31/15, I performed a complaint response inspection of the Captain USA well site in response to reports of oily material running off of the site and made the following observations:
|
2481416 | Primary Facility | 2016-01-21 | Follow-up Inspection | No Violations Noted | On 1/21/16, I performed a follow up inspection of the Captain USA well site accompanied by DEP Engineer Emmanuel Nwaobilo in response to previously observed issues with increased erosion and sedimentation and potential undelineated streams. Snow cover in the area of concerned prevented effective inspection of the site. |
2483822 | Primary Facility | 2016-03-08 | Follow-up Inspection | No Violations Noted | On 3/8/16, I performed a follow up inspection with DEP engineer Emmanuel Nwaobilo for the Captain USA site in response to an ongoing issue with site E&S controls and made the following observations:
•Along the access road, where it crosses the last saddle before the pad, E&S controls have been heavily reinforced partially in response to department recommendations. •Inspection of the area below the reinforced controls found multiple streams and waterways not shown in the site plans or in the original streams and wetlands report for the site. Due to this the site is not in compliance with §102.4(b)(4)(ii),(iv), §102.8(b)(2),(3),(5), and (8), §102.4(b)(5)(v) and §102.5(m)(2)(ii). •Many of the stream channels in the area adjacent to the site appear to be undergoing increased erosion and sedimentation. This is a violation of §102.2(a), (b); §102.11(a)(1),(2) and 35 P.S. § 691.401 •The site was also noted to be in in the drilling/PCSM phase at the time of inspection and primary site construction was completed t |
2499166 | Primary Facility | 2016-06-14 | Routine/Partial Inspection | No Violations Noted | A routine/partial inspection of the well site was conducted. |
2530274 | Primary Facility | 2016-10-05 | Incident- Response to Accident or Event | In Compliance with Policy | Incident response conducted as a result of an operator notification. |
2789326 | Primary Facility | 2018-10-15 | Routine/Complete Inspection | No Violations Noted | On Monday October 15, 2018 I conducted a routine-complete inspection at the Captain USA Well Site located in North Bethlehem Township, Washington County.
Each gas well Captain USA 11H (125-27816) and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification. No violations were identified during the inspection. |
For data sources see[9]