If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-27561 | | Well ID: 37-125-27561 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.124081, -80.092425 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: | + | | State: Pennsylvania |
+ | |- | ||
+ | | County: [[Washington_County,_Pennsylvania|Washington]] | ||
+ | |- | ||
+ | | Municipality: [[North Bethlehem Township,_Washington_County,_Pennsylvania|North Bethlehem Township]] | ||
|- | |- | ||
| Operator Name: [[RICE DRILLING B LLC]] | | Operator Name: [[RICE DRILLING B LLC]] | ||
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: [[152183]] |
|- | |- | ||
− | | Farm/Lease Name: GOLDEN GOOSE | + | | Farm/Lease Name: GOLDEN GOOSE |
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: 2015-02-10 |
|- | |- | ||
− | | | + | | Permit Date: 2015-01-14 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | Well | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
| Latitude: 40.124081 | | Latitude: 40.124081 | ||
|- | |- | ||
| Longitude: -80.092425 | | Longitude: -80.092425 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2015-01-14 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2015-02-09 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2015-05-26 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2015-07-06 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2015-07-07 | ||
+ | | Performed Stimulation | ||
+ | |- | ||
+ | | 2016-04-08 | ||
+ | | DEVIATED | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | | + | !scope="col" | True Vertical Depth (ft) |
− | !scope="col" | | + | !scope="col" | Total Water Volume (gal) |
− | !scope="col" | | + | !scope="col" | Total Non-Water Volume (gal) |
− | |||
|- | |- | ||
− | | | + | |}--> |
− | | | + | <!--==== Fluid Composition Data ==== |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" | Job Number |
− | | | + | !scope="col" | Trade Name |
− | + | !scope="col" | Supplier | |
− | + | !scope="col" | Purpose | |
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
|- | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
− | | 2015- | + | | 2015-07-07 |
− | + | | style="text-align: right;" | | |
− | | style="text-align:right;" | | + | |
− | + | | style="text-align: right;" | 12,473,751 | |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Completion Reports - Stimulations |
− | | publisher = | + | | publisher = Pennsylvania Department of Conservation and Natural Resources |
− | + | | date = 2020-03-02 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2020-03-02 }}</ref> |
− | == | + | == Production Data == |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Water Production Days |
− | + | |- | |
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 1,427,264.00 | ||
+ | | style="text-align: right;" | 129 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 3,047,391.82 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 1,222,113.01 | ||
+ | | style="text-align: right;" | 293 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 937,113.00 | ||
+ | | style="text-align: right;" | 309 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 983,689.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Production Reports |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-03-31 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == | + | == Waste Data == |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | |||
|- | |- | ||
− | | | + | | 2015 |
− | | 2015- | + | | [[RICE DRILLING B LLC]] |
− | | | + | | Fracing Fluid Waste |
− | | | + | | style="text-align: right;" | 5,461.57 Bbl |
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 20.78 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 2014-541 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 92.78 Tons | ||
+ | | LANDFILL | ||
+ | | 100663 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 7,940.06 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 3,384.35 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 25.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 295.69 Tons | ||
+ | | LANDFILL | ||
+ | | 06-08438 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 391.65 Tons | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | 301071 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 63.58 Tons | ||
+ | | LANDFILL | ||
+ | | PAD059087072 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 0.75 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-157-25511 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 57.50 Tons | ||
+ | | LANDFILL | ||
+ | | 100592 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 9,382.65 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 947.18 Tons | ||
+ | | LANDFILL | ||
+ | | 100172 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 118.18 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 7.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 175.24 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | | + | | Other Oil & Gas Wastes |
− | | | + | | style="text-align: right;" | 67.20 Bbl |
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,125.39 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 14,822.23 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Filter Socks | ||
+ | | style="text-align: right;" | 0.07 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301280 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Waste Water Treatment Sludge | ||
+ | | style="text-align: right;" | 2.89 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 2014-541 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 196.45 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 630.50 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Servicing Fluid | ||
+ | | style="text-align: right;" | 0.61 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 2014-541 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 544.86 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Synthetic Liner Materials | ||
+ | | style="text-align: right;" | 2.68 Tons | ||
+ | | LANDFILL | ||
+ | | 100663 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Soil Contaminated by Oil & Gas Related Spills | ||
+ | | style="text-align: right;" | 0.14 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301280 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 0.36 Tons | ||
+ | | LANDFILL | ||
+ | | 100663 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 44.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
| | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Synthetic Liner Materials | ||
+ | | style="text-align: right;" | 7.79 Tons | ||
+ | | LANDFILL | ||
+ | | 100663 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Filter Socks | ||
+ | | style="text-align: right;" | 0.03 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301280 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 10.68 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-157-25511 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Waste Water Treatment Sludge | ||
+ | | style="text-align: right;" | 3.27 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | ODNR 2015-511 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 1,044.68 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 203.35 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 99.85 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 12.07 Tons | ||
+ | | LANDFILL | ||
+ | | 100172 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 9.76 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | ODNR 2015-511 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 102.81 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | ODNR 2014-4 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 139.87 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 153.08 Bbl |
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 2.16 Tons | ||
+ | | LANDFILL | ||
+ | | 100620 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 716.62 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Soil Contaminated by Oil | ||
+ | | style="text-align: right;" | 0.14 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301280 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 32.99 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1.31 Tons | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | 101532 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Servicing Fluid | ||
+ | | style="text-align: right;" | 2.11 Tons | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | 101532 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 21.44 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 740.94 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 1.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW010 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 113.42 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 4.44 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 119.97 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Servicing Fluid | ||
+ | | style="text-align: right;" | 13.68 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 30.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 276.34 Bbl |
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Servicing Fluid | ||
+ | | style="text-align: right;" | 6.54 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Servicing Fluid | ||
+ | | style="text-align: right;" | 24.39 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 12.70 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 28.46 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-167-29543 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 5.90 Bbl | ||
+ | | SURFACE IMPOUNDMENT | ||
+ | | 95-7-37312-19 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 40.88 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-009-23823 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 11.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 795.79 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 49.82 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW010 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 11.39 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | N/A | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 12.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-167-29543 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 128.01 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Inspection Category | ||
+ | !scope="col" | Inspection Date | ||
+ | !scope="col" | Inspection Type | ||
+ | !scope="col" | Inspection Result | ||
+ | !scope="col" | Inspection Comments | ||
+ | |- | ||
+ | | 2343123 | ||
+ | | Primary Facility | ||
+ | | 2015-02-11 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Express Energy Services auger rig | ||
+ | |- | ||
+ | | 2344782 | ||
+ | | Primary Facility | ||
+ | | 2015-02-13 | ||
+ | | Preoperation Inspection | ||
+ | | No Violations Noted | ||
+ | | The pre-operation inspection for the Golden Goose well site was conducted on Friday, February 13, 2015 pursuant to 58 Pa C.S. Section 3258 (a.1). | ||
+ | |- | ||
+ | | 2354052 | ||
+ | | Primary Facility | ||
+ | | 2015-03-20 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson-UTI Drilling Rig #312 | ||
+ | |- | ||
+ | | 2355660 | ||
+ | | Primary Facility | ||
+ | | 2015-03-27 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson-UTI Drilling Rig #312 | ||
+ | |- | ||
+ | | 2358260 | ||
+ | | Primary Facility | ||
+ | | 2015-04-03 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson-UTI Drilling Rig #312 | ||
|- | |- | ||
| 2361489 | | 2361489 | ||
+ | | Primary Facility | ||
| 2015-04-15 | | 2015-04-15 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson-UTI Drilling Rig #312 | ||
+ | |- | ||
+ | | 2377426 | ||
+ | | Primary Facility | ||
+ | | 2015-06-08 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson-UTI Drilling Rig #312 | ||
+ | |- | ||
+ | | 2816786 | ||
+ | | Primary Facility | ||
+ | | 2018-12-14 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | | + | | On Friday December 14, 2018 I conducted a routine-complete inspection at the Golden Goose Well Site located in North Bethlehem Township, Washington County. |
− | + | ||
− | + | The gas well and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification. | |
− | + | ||
+ | No Violations were identified during the inspection. | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-125-27561 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.124081,"lon":-80.092425,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Bethlehem Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 152183 | |
Farm/Lease Name: GOLDEN GOOSE | |
License Status: | |
Spud Date: 2015-02-10 | |
Permit Date: 2015-01-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.124081 | |
Longitude: -80.092425 |
Date | Event |
---|---|
2015-01-14 | New Permit Application |
2015-02-09 | Performed Spud Operation |
2015-05-26 | Drilling Completion |
2015-07-06 | Perforation |
2015-07-07 | Performed Stimulation |
2016-04-08 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-07-07 | 12,473,751 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 1,427,264.00 | 129 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 3,047,391.82 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 1,222,113.01 | 293 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 937,113.00 | 309 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 983,689.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Fracing Fluid Waste | 5,461.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 20.78 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 92.78 Tons | LANDFILL | 100663 |
2015 | RICE DRILLING B LLC | Fracing Fluid Waste | 7,940.06 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Produced Fluid | 3,384.35 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 25.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 295.69 Tons | LANDFILL | 06-08438 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 391.65 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 63.58 Tons | LANDFILL | PAD059087072 |
2015 | RICE DRILLING B LLC | Produced Fluid | 0.75 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 57.50 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 9,382.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 947.18 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 118.18 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 7.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 175.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 67.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 1,125.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 14,822.23 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Filter Socks | 0.07 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.89 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 196.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 630.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Servicing Fluid | 0.61 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 544.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 2.68 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.14 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 0.36 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 44.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 7.79 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.03 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 10.68 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 3.27 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1,044.68 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 203.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 99.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 12.07 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 9.76 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 102.81 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2014-4 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 139.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 153.08 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Drill Cuttings | 2.16 Tons | LANDFILL | 100620 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 716.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.14 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 32.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1.31 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Servicing Fluid | 2.11 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 21.44 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Produced Fluid | 740.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | RICE DRILLING B LLC | Produced Fluid | 113.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 4.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 119.97 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 13.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 30.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 276.34 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 6.54 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 24.39 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Produced Fluid | 12.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 28.46 Bbl | INJECTION DISPOSAL WELL | 34-167-29543 |
2019 | RICE DRILLING B LLC | Produced Fluid | 5.90 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Produced Fluid | 40.88 Bbl | INJECTION DISPOSAL WELL | 34-009-23823 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 11.00 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 795.79 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 49.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 11.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | N/A |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 12.00 Bbl | INJECTION DISPOSAL WELL | 34-167-29543 |
2019 | RICE DRILLING B LLC | Produced Fluid | 128.01 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2343123 | Primary Facility | 2015-02-11 | Drilling/Alteration | No Violations Noted | Express Energy Services auger rig |
2344782 | Primary Facility | 2015-02-13 | Preoperation Inspection | No Violations Noted | The pre-operation inspection for the Golden Goose well site was conducted on Friday, February 13, 2015 pursuant to 58 Pa C.S. Section 3258 (a.1). |
2354052 | Primary Facility | 2015-03-20 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #312 |
2355660 | Primary Facility | 2015-03-27 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #312 |
2358260 | Primary Facility | 2015-04-03 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #312 |
2361489 | Primary Facility | 2015-04-15 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #312 |
2377426 | Primary Facility | 2015-06-08 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #312 |
2816786 | Primary Facility | 2018-12-14 | Routine/Complete Inspection | No Violations Noted | On Friday December 14, 2018 I conducted a routine-complete inspection at the Golden Goose Well Site located in North Bethlehem Township, Washington County.
The gas well and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification. No Violations were identified during the inspection. |
For data sources see[8]