X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-24426"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-24426
 
| Well ID: 37-085-24426
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.418898, -80.433185 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.418898, -80.433185 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: KOSNAC STEPHEN UNIT 1
 
| Farm/Lease Name: KOSNAC STEPHEN UNIT 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2008-07-25
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2008-06-12
 
| Permit Date: 2008-06-12
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.418898
 
| Latitude: 41.418898
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-06-12
 +
| New Permit Application
 +
|-
 +
| 2008-07-25
 +
| Performed Spud Operation
 +
|-
 +
| 2008-07-31
 +
| Drilling Completion
 +
|-
 +
| 2008-09-30
 +
| Perforation
 +
|-
 +
| 2008-11-05
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 96: Line 137:
 
| 2009
 
| 2009
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 9,651.00
+
| style="text-align: right;" | 9651.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 507.13
 
| style="text-align: right;" | 507.13
Line 180: Line 221:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 68.22
 
| style="text-align: right;" | 68.22
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| style="text-align: right;" | 1,850.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 34.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 251: Line 301:
 
| 2010
 
| 2010
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 292.00 Bbl
 
| style="text-align: right;" | 292.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 258: Line 308:
 
| 2012
 
| 2012
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 265: Line 315:
 
| 2013
 
| 2013
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 13.00 Bbl
 
| style="text-align: right;" | 13.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 272: Line 322:
 
| 2014
 
| 2014
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 36.00 Bbl
 
| style="text-align: right;" | 36.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 279: Line 329:
 
| 2014
 
| 2014
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 42.00 Bbl
 
| style="text-align: right;" | 42.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-155-22403
 
| 34-155-22403
 +
|-
 +
| 2015
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 63.72 Bbl
 +
| Injection Disposal Well
 +
| 34-007-23262
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 24.00 Bbl
 
| style="text-align: right;" | 24.00 Bbl
 
| Road Spreading
 
| Road Spreading
Line 293: Line 350:
 
| 2017
 
| 2017
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 13.00 Bbl
 
| style="text-align: right;" | 13.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 300: Line 357:
 
| 2018
 
| 2018
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-21847
 +
|-
 +
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 34.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-007-21847
 
| 34-007-21847

Latest revision as of 10:35, 15 May 2020

Well Details

Well ID: 37-085-24426
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: West Salem Township
Operator Name: L & B ENERGY LLP
Well Pad ID:
Farm/Lease Name: KOSNAC STEPHEN UNIT 1
License Status: ACTIVE
Spud Date:
Permit Date: 2008-06-12
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.418898
Longitude: -80.433185

For data sources see[1][2][3]

Well History

Date Event
2008-06-12 New Permit Application
2008-07-25 Performed Spud Operation
2008-07-31 Drilling Completion
2008-09-30 Perforation
2008-11-05 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 CEDAR VALLEY ENERGY INC 0.00 0 0.00 0 0.00 0
2009 CEDAR VALLEY ENERGY INC 9651.00 365 507.13 365 0.00 0
2010 CEDAR VALLEY ENERGY INC 5,872.00 365 225.50 365 0.00 0
2011 CEDAR VALLEY ENERGY INC 3,532.00 365 89.08 365 0.00 0
2012 CEDAR VALLEY ENERGY INC 2,704.00 365 72.89 365 0.00 0
2013 CEDAR VALLEY ENERGY INC 1,859.00 365 65.64 365 0.00 0
2014 CEDAR VALLEY ENERGY INC 2,122.00 365 102.11 365 0.00 0
2015 CEDAR VALLEY ENERGY INC 2,346.96 365 54.82 365 0.00 0
2016 L & B ENERGY LLP 2,056.00 365 82.05 365 0.00 0
2017 L & B ENERGY LLP 1,369.00 365 0.00 0 0.00 0
2018 L & B ENERGY LLP 2,275.00 365 68.22 365 0.00 0
2019 L & B ENERGY LLP 1,850.00 365 34.00 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 CEDAR VALLEY ENERGY INC Brine 896.00 Bbl Other 0525
2008 CEDAR VALLEY ENERGY INC Brine 1,357.00 Bbl Injection Disposal Well OH-1893,1894,32
2008 CEDAR VALLEY ENERGY INC Brine 115.00 Bbl Road Spreading
2009 CEDAR VALLEY ENERGY INC Brine 75.00 Bbl Injection Disposal Well OH-1893,1894,32
2009 CEDAR VALLEY ENERGY INC Brine 60.00 Bbl Road Spreading
2009 CEDAR VALLEY ENERGY INC Brine 599.00 Bbl Injection Disposal Well OH-3415523795
2009 CEDAR VALLEY ENERGY INC Brine 45.00 Bbl Reuse other than road spreading 2090
2010 CEDAR VALLEY ENERGY INC Produced Fluid 292.00 Bbl Injection Disposal Well 34-155-23795
2012 CEDAR VALLEY ENERGY INC Produced Fluid 50.00 Bbl Injection Disposal Well 34-155-23795
2013 CEDAR VALLEY ENERGY INC Produced Fluid 13.00 Bbl Injection Disposal Well 34-155-23795
2014 CEDAR VALLEY ENERGY INC Produced Fluid 36.00 Bbl Injection Disposal Well 34-133-20525
2014 CEDAR VALLEY ENERGY INC Produced Fluid 42.00 Bbl Injection Disposal Well 34-155-22403
2015 CEDAR VALLEY ENERGY INC Produced Fluid 63.72 Bbl Injection Disposal Well 34-007-23262
2016 L & B ENERGY LLP Produced Fluid 24.00 Bbl Road Spreading
2017 L & B ENERGY LLP Produced Fluid 13.00 Bbl Injection Disposal Well 34-155-24063
2018 L & B ENERGY LLP Produced Fluid 60.00 Bbl Injection Disposal Well 34-007-21847
2019 L & B ENERGY LLP Produced Fluid 34.00 Bbl Injection Disposal Well 34-007-21847

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1723544 Primary Facility 2008-07-28 Drilling/Alteration No Violations Noted

For data sources see[7]

References