X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-24166"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-24166
 
| Well ID: 37-085-24166
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.427150, -80.171223 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.427150, -80.171223 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: EPISCOPAL CHURCH 1 270
 
| Farm/Lease Name: EPISCOPAL CHURCH 1 270
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2007-08-20
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2006-08-24
 
| Permit Date: 2006-08-24
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.427150
 
| Latitude: 41.427150
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-08-24
 +
| New Permit Application
 +
|-
 +
| 2007-08-20
 +
| Performed Spud Operation
 +
|-
 +
| 2007-08-25
 +
| Drilling Completion
 +
|-
 +
| 2007-08-29
 +
| Perforation
 +
|-
 +
| 2008-03-20
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2007
 
| 2007
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 3,546.00
+
| style="text-align: right;" | 3546.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 137:
 
| 2008
 
| 2008
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 14,834.00
+
| style="text-align: right;" | 14834.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 146:
 
| 2009
 
| 2009
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 7,726.00
+
| style="text-align: right;" | 7726.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 225: Line 266:
 
| 2010
 
| 2010
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 232: Line 273:
 
| 2016
 
| 2016
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 42.00 Bbl
 
| style="text-align: right;" | 42.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING

Latest revision as of 10:07, 15 May 2020

Well Details

Well ID: 37-085-24166
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: New Vernon Township
Operator Name: VISTA OPR INC
Well Pad ID:
Farm/Lease Name: EPISCOPAL CHURCH 1 270
License Status: ACTIVE
Spud Date:
Permit Date: 2006-08-24
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.427150
Longitude: -80.171223

For data sources see[1][2][3]

Well History

Date Event
2006-08-24 New Permit Application
2007-08-20 Performed Spud Operation
2007-08-25 Drilling Completion
2007-08-29 Perforation
2008-03-20 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 VISTA OPR INC 3546.00 365 0.00 0 0.00 0
2008 VISTA OPR INC 14834.00 365 0.00 0 0.00 0
2009 VISTA OPR INC 7726.00 365 0.00 0 0.00 0
2010 VISTA OPR INC 6,050.00 365 0.00 0 0.00 0
2011 VISTA OPR INC 4,727.00 365 0.00 0 0.00 0
2012 VISTA OPR INC 5,744.00 365 0.00 0 0.00 0
2013 VISTA OPR INC 4,069.00 365 0.00 0 0.00 0
2014 VISTA OPR INC 3,607.00 365 0.00 0 0.00 0
2015 VISTA OPR INC 3,445.00 365 0.00 0 0.00 0
2016 VISTA OPR INC 3,273.00 365 0.00 0 0.00 0
2017 VISTA OPR INC 2,789.00 365 0.00 0 0.00 0
2018 VISTA OPR INC 2,148.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 VISTA OPR INC Brine 100.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 VISTA OPR INC Brine 100.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 VISTA OPR INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2016 VISTA OPR INC Produced Fluid 42.00 Bbl ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1646158 Primary Facility 2007-08-24 Drilling/Alteration No Violations Noted
1977250 Primary Facility 2011-06-01 Routine/Complete Inspection No Violations Noted
2234638 Primary Facility 2014-01-08 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References