X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23873"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23873
 
| Well ID: 37-085-23873
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.421375, -80.4045 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.421375, -80.4045 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: SPENCER 1
 
| Farm/Lease Name: SPENCER 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2005-10-20
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2005-08-09
 
| Permit Date: 2005-08-09
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.421375
 
| Latitude: 41.421375
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-08-09
 +
| New Permit Application
 +
|-
 +
| 2005-10-20
 +
| Performed Spud Operation
 +
|-
 +
| 2005-10-25
 +
| Drilling Completion
 +
|-
 +
| 2005-11-07
 +
| Perforation
 +
|-
 +
| 2006-01-12
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2006
 
| 2006
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 13,165.00
+
| style="text-align: right;" | 13165.00
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 356.00
 
| style="text-align: right;" | 356.00
Line 96: Line 137:
 
| 2007
 
| 2007
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 7,768.00
+
| style="text-align: right;" | 7768.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 206.00
+
| style="text-align: right;" | 206
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 146:
 
| 2008
 
| 2008
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 4,598.00
+
| style="text-align: right;" | 4598.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 99.30
 
| style="text-align: right;" | 99.30
Line 114: Line 155:
 
| 2009
 
| 2009
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 3,588.00
+
| style="text-align: right;" | 3588.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 124.73
 
| style="text-align: right;" | 124.73
Line 198: Line 239:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 41.54
 
| style="text-align: right;" | 41.54
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| style="text-align: right;" | 2,063.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 82.30
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 221: Line 271:
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 838.00 Bbl
| Road Spreading
+
| Injection Disposal Well
 
|  
 
|  
 
|-
 
|-
Line 228: Line 278:
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 838.00 Bbl
+
| style="text-align: right;" | 80.00 Bbl
| Injection Disposal Well
+
| Road Spreading
 
|  
 
|  
 
|-
 
|-
Line 255: Line 305:
 
| 2010
 
| 2010
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 262: Line 312:
 
| 2010
 
| 2010
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| Reuse other than road spreading
 
| Reuse other than road spreading
Line 269: Line 319:
 
| 2011
 
| 2011
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 201.00 Bbl
 
| style="text-align: right;" | 201.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 276: Line 326:
 
| 2012
 
| 2012
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 215.00 Bbl
+
| style="text-align: right;" | 40.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-21893
+
| 34-155-23795
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 40.00 Bbl
+
| style="text-align: right;" | 215.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-23795
+
| 34-155-21893
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 75.00 Bbl
 
| style="text-align: right;" | 75.00 Bbl
 
| Road Spreading
 
| Road Spreading
Line 297: Line 347:
 
| 2013
 
| 2013
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 304: Line 354:
 
| 2014
 
| 2014
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 115.00 Bbl
+
| style="text-align: right;" | 25.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-23795
+
| 34-155-22403
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 318: Line 368:
 
| 2014
 
| 2014
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 25.00 Bbl
+
| style="text-align: right;" | 115.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-23795
 +
|-
 +
| 2015
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 54.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-20919
 +
|-
 +
| 2015
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 73.08 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-22403
+
| 34-007-23262
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 64.00 Bbl
 
| style="text-align: right;" | 64.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 332: Line 396:
 
| 2016
 
| 2016
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 69.00 Bbl
 
| style="text-align: right;" | 69.00 Bbl
 
| Road Spreading
 
| Road Spreading
Line 339: Line 403:
 
| 2017
 
| 2017
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 47.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-24063
 +
|-
 +
| 2017
 +
| [[L & B ENERGY LLP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 12.00 Bbl
 
| style="text-align: right;" | 12.00 Bbl
 
| Road Spreading
 
| Road Spreading
Line 346: Line 417:
 
| 2017
 
| 2017
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 47.00 Bbl
+
| style="text-align: right;" | 77.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-24063
+
| 34-007-21847
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2017
+
| 2018
 +
| [[L & B ENERGY LLP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 72.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-24523
 +
|-
 +
| 2019
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 77.00 Bbl
+
| style="text-align: right;" | 53.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-007-21847
 
| 34-007-21847
 
|-
 
|-
| 2018
+
| 2019
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 72.00 Bbl
+
| style="text-align: right;" | 82.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-007-24523
+
| 34-155-24063
 
|-
 
|-
 
|}
 
|}

Latest revision as of 09:36, 15 May 2020

Well Details

Well ID: 37-085-23873
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: West Salem Township
Operator Name: L & B ENERGY LLP
Well Pad ID:
Farm/Lease Name: SPENCER 1
License Status: ACTIVE
Spud Date:
Permit Date: 2005-08-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.421375
Longitude: -80.4045

For data sources see[1][2][3]

Well History

Date Event
2005-08-09 New Permit Application
2005-10-20 Performed Spud Operation
2005-10-25 Drilling Completion
2005-11-07 Perforation
2006-01-12 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 CEDAR VALLEY ENERGY INC 13165.00 305 356.00 305 0.00 0
2007 CEDAR VALLEY ENERGY INC 7768.00 365 206 365 0.00 0
2008 CEDAR VALLEY ENERGY INC 4598.00 365 99.30 365 0.00 0
2009 CEDAR VALLEY ENERGY INC 3588.00 365 124.73 365 0.00 0
2010 CEDAR VALLEY ENERGY INC 2,949.00 365 0.00 0 0.00 0
2011 CEDAR VALLEY ENERGY INC 2,424.00 365 47.89 365 0.00 0
2012 CEDAR VALLEY ENERGY INC 2,977.00 365 116.04 365 0.00 0
2013 CEDAR VALLEY ENERGY INC 2,870.00 365 86.66 365 0.00 0
2014 CEDAR VALLEY ENERGY INC 2,816.00 365 45.40 365 0.00 0
2015 CEDAR VALLEY ENERGY INC 2,179.00 365 41.21 365 0.00 0
2016 L & B ENERGY LLP 1,925.00 365 97.77 365 0.00 0
2017 L & B ENERGY LLP 1,132.00 365 0.00 0 0.00 0
2018 L & B ENERGY LLP 2,307.00 365 41.54 365 0.00 0
2019 L & B ENERGY LLP 2,063.00 365 82.30 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 CEDAR VALLEY ENERGY INC Brine 838.00 Bbl Injection Disposal Well
2006 CEDAR VALLEY ENERGY INC Brine 80.00 Bbl Road Spreading
2008 CEDAR VALLEY ENERGY INC Brine 150.00 Bbl Other 3415523795
2009 CEDAR VALLEY ENERGY INC Brine 80.00 Bbl Reuse other than road spreading 3101
2009 CEDAR VALLEY ENERGY INC Brine 40.00 Bbl Injection Disposal Well OH-3415523795
2010 CEDAR VALLEY ENERGY INC Produced Fluid 120.00 Bbl Injection Disposal Well 34-155-23795
2010 CEDAR VALLEY ENERGY INC Produced Fluid 80.00 Bbl Reuse other than road spreading
2011 CEDAR VALLEY ENERGY INC Produced Fluid 201.00 Bbl Injection Disposal Well 34-155-23795
2012 CEDAR VALLEY ENERGY INC Produced Fluid 40.00 Bbl Injection Disposal Well 34-155-23795
2012 CEDAR VALLEY ENERGY INC Produced Fluid 215.00 Bbl Injection Disposal Well 34-155-21893
2013 CEDAR VALLEY ENERGY INC Produced Fluid 75.00 Bbl Road Spreading
2013 CEDAR VALLEY ENERGY INC Produced Fluid 30.00 Bbl Injection Disposal Well 34-155-21893
2014 CEDAR VALLEY ENERGY INC Produced Fluid 25.00 Bbl Injection Disposal Well 34-155-22403
2014 CEDAR VALLEY ENERGY INC Produced Fluid 40.00 Bbl Injection Disposal Well 34-007-21847
2014 CEDAR VALLEY ENERGY INC Produced Fluid 115.00 Bbl Injection Disposal Well 34-155-23795
2015 CEDAR VALLEY ENERGY INC Produced Fluid 54.00 Bbl Injection Disposal Well 34-007-20919
2015 CEDAR VALLEY ENERGY INC Produced Fluid 73.08 Bbl Injection Disposal Well 34-007-23262
2016 L & B ENERGY LLP Produced Fluid 64.00 Bbl Injection Disposal Well 34-007-20919
2016 L & B ENERGY LLP Produced Fluid 69.00 Bbl Road Spreading
2017 L & B ENERGY LLP Produced Fluid 47.00 Bbl Injection Disposal Well 34-155-24063
2017 L & B ENERGY LLP Produced Fluid 12.00 Bbl Road Spreading
2017 L & B ENERGY LLP Produced Fluid 77.00 Bbl Injection Disposal Well 34-007-21847
2017 L & B ENERGY LLP Produced Fluid 70.00 Bbl Injection Disposal Well 34-007-20919
2018 L & B ENERGY LLP Produced Fluid 72.00 Bbl Injection Disposal Well 34-007-24523
2019 L & B ENERGY LLP Produced Fluid 53.00 Bbl Injection Disposal Well 34-007-21847
2019 L & B ENERGY LLP Produced Fluid 82.00 Bbl Injection Disposal Well 34-155-24063

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1489861 Primary Facility 2005-10-26 Drilling/Alteration Violation(s) Noted
1491235 Primary Facility 2005-10-31 Compliance Evaluation No Violations Noted
1492582 Primary Facility 2005-11-07 Drilling/Alteration No Violations Noted
2574396 Primary Facility 2017-03-21 Routine/Partial Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1489861 476401 10/26/2005 2005-10-26 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
476401 201719 NOV - Notice of Violation Comply/Closed 2005-10-31

For data sources see[7]

References