X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-123-45978"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-123-45978
 
| Well ID: 37-123-45978
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.835075, -79.173292 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.835075, -79.173292 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: WEST END PROJ 10
+
| Farm/Lease Name: WEST END PROJ
 
|-
 
|-
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 2010-05-12
+
| Spud Date: 2010-06-15
 
|-
 
|-
 
| Permit Date: 2010-04-30
 
| Permit Date: 2010-04-30
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Deviated Well
 
| Configuration: Deviated Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.835075
 
| Latitude: 41.835075
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-04-30
 +
| New Permit Application
 +
|-
 +
| 2010-05-12
 +
| Performed Spud Operation
 +
|-
 +
| 2010-06-18
 +
| Perforation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 10 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 11 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 12 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 13 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 14 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 15 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 16 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2010-06-18
 +
| Performed Stage 9 of Stimulation
 +
|-
 +
| 2010-06-19
 +
| Drilling Completion
 +
|-
 +
| 2017-03-15
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 152:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 1
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 2
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 3
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 4
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 5
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 6
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 7
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 8
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 9
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 10
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 11
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 12
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 13
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 14
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 15
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2010-06-18
 +
| style="text-align: right;" | 16
 +
| SAND
 +
| style="text-align: right;" | 30,775
 +
| style="text-align: right;" | 1,135
 +
| style="text-align: right;" | 3,500
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Latest revision as of 22:20, 14 May 2020

Well Details

Well ID: 37-123-45978
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Warren City
Operator Name: BRANCH JOHN D
Well Pad ID:
Farm/Lease Name: WEST END PROJ
License Status: Active
Spud Date: 2010-06-15
Permit Date: 2010-04-30
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 41.835075
Longitude: -79.173292

For data sources see[1][2][3]

Well History

Date Event
2010-04-30 New Permit Application
2010-05-12 Performed Spud Operation
2010-06-18 Perforation
2010-06-18 Performed Stage 1 of Stimulation
2010-06-18 Performed Stage 10 of Stimulation
2010-06-18 Performed Stage 11 of Stimulation
2010-06-18 Performed Stage 12 of Stimulation
2010-06-18 Performed Stage 13 of Stimulation
2010-06-18 Performed Stage 14 of Stimulation
2010-06-18 Performed Stage 15 of Stimulation
2010-06-18 Performed Stage 16 of Stimulation
2010-06-18 Performed Stage 2 of Stimulation
2010-06-18 Performed Stage 3 of Stimulation
2010-06-18 Performed Stage 4 of Stimulation
2010-06-18 Performed Stage 5 of Stimulation
2010-06-18 Performed Stage 6 of Stimulation
2010-06-18 Performed Stage 7 of Stimulation
2010-06-18 Performed Stage 8 of Stimulation
2010-06-18 Performed Stage 9 of Stimulation
2010-06-19 Drilling Completion
2017-03-15 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-06-18 1 SAND 30,775 1,135 3,500
2010-06-18 2 SAND 30,775 1,135 3,500
2010-06-18 3 SAND 30,775 1,135 3,500
2010-06-18 4 SAND 30,775 1,135 3,500
2010-06-18 5 SAND 30,775 1,135 3,500
2010-06-18 6 SAND 30,775 1,135 3,500
2010-06-18 7 SAND 30,775 1,135 3,500
2010-06-18 8 SAND 30,775 1,135 3,500
2010-06-18 9 SAND 30,775 1,135 3,500
2010-06-18 10 SAND 30,775 1,135 3,500
2010-06-18 11 SAND 30,775 1,135 3,500
2010-06-18 12 SAND 30,775 1,135 3,500
2010-06-18 13 SAND 30,775 1,135 3,500
2010-06-18 14 SAND 30,775 1,135 3,500
2010-06-18 15 SAND 30,775 1,135 3,500
2010-06-18 16 SAND 30,775 1,135 3,500

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 BRANCH JOHN D 547.00 365 121.00 365 0.00 0
2018 BRANCH JOHN D 547.00 365 121.00 365 0.00 0

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1894592 Primary Facility 2010-06-16 Drilling/Alteration No Violations Noted
2102737 Primary Facility 2012-09-26 Routine/Complete Inspection No Violations Noted
2433907 Primary Facility 2015-12-18 Routine/Complete Inspection Violation(s) Noted
2501728 Primary Facility 2016-07-18 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2433907 741566 12/18/2015 2015-12-18 78.12 - COMPLIANCE WITH PERMITS - Failure to comply with terms and conditions of permit or registration while drilling, altering or operating an oil or gas well. Administrative
2433907 741567 12/18/2015 2015-12-18 OGA 3222(B) - Failure to submit well record / completion report. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
741566 333090 NOV - Notice of Violation
741567 333090 NOV - Notice of Violation

For data sources see[7]

References