X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-24645"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-033-24645
 
| Well ID: 37-033-24645
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.891528, -78.491944 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.891528, -78.491944 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: ROBBINS/CHASE 3
 
| Farm/Lease Name: ROBBINS/CHASE 3
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2000-06-26
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2000-06-21
 
| Permit Date: 2000-06-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.891528
 
| Latitude: 40.891528
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2000-06-21
 +
| New Permit Application
 +
|-
 +
| 2000-06-26
 +
| Performed Spud Operation
 +
|-
 +
| 2000-07-14
 +
| Drilling Completion
 +
|-
 +
| 2000-07-26
 +
| Perforation
 +
|-
 +
| 2000-12-15
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 86: Line 127:
 
|-
 
|-
 
| 2000
 
| 2000
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 6,807.00
+
| style="text-align: right;" | 6807
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 95: Line 136:
 
|-
 
|-
 
| 2002
 
| 2002
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 5,737.00
+
| style="text-align: right;" | 5737
 
| style="text-align: right;" | 341
 
| style="text-align: right;" | 341
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 104: Line 145:
 
|-
 
|-
 
| 2003
 
| 2003
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,824.00
+
| style="text-align: right;" | 4824
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 113: Line 154:
 
|-
 
|-
 
| 2004
 
| 2004
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,139.00
+
| style="text-align: right;" | 4139
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 122: Line 163:
 
|-
 
|-
 
| 2005
 
| 2005
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,634.00
+
| style="text-align: right;" | 3634
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 131: Line 172:
 
|-
 
|-
 
| 2006
 
| 2006
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 2,967.00
+
| style="text-align: right;" | 2967.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 140: Line 181:
 
|-
 
|-
 
| 2007
 
| 2007
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 2,710.00
+
| style="text-align: right;" | 2710.00
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 149: Line 190:
 
|-
 
|-
 
| 2008
 
| 2008
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 2,393.00
+
| style="text-align: right;" | 2393.00
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 158: Line 199:
 
|-
 
|-
 
| 2009
 
| 2009
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 2,635.00
+
| style="text-align: right;" | 2635.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 257: Line 298:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 262: Line 304:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2002-A00
+
| 2002
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 268: Line 311:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2003-A00
+
| 2003
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
Line 274: Line 318:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2004-A00
+
| 2004
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 280: Line 325:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2005-A00
+
| 2005
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 286: Line 332:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 292: Line 339:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl

Latest revision as of 11:36, 14 May 2020

Well Details

Well ID: 37-033-24645
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Knox Township
Operator Name: GREYLOCK OPCO LLC
Well Pad ID:
Farm/Lease Name: ROBBINS/CHASE 3
License Status: ACTIVE
Spud Date:
Permit Date: 2000-06-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.891528
Longitude: -78.491944

For data sources see[1][2][3]

Well History

Date Event
2000-06-21 New Permit Application
2000-06-26 Performed Spud Operation
2000-07-14 Drilling Completion
2000-07-26 Perforation
2000-12-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 ENERGY CORP OF AMER 6807 122 0.00 0 0.00 0
2002 ENERGY CORP OF AMER 5737 341 0.00 0 0.00 0
2003 ENERGY CORP OF AMER 4824 346 0.00 0 0.00 0
2004 ENERGY CORP OF AMER 4139 366 0.00 0 0.00 0
2005 ENERGY CORP OF AMER 3634 365 0.00 0 0.00 0
2006 ENERGY CORP OF AMER 2967.00 365 0.00 0 0.00 0
2007 ENERGY CORP OF AMER 2710.00 364 0.00 0 0.00 0
2008 ENERGY CORP OF AMER 2393.00 304 0.00 0 0.00 0
2009 ENERGY CORP OF AMER 2635.00 365 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 2,253.00 365 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 1,836.00 365 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 1,636.00 366 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 1,494.00 365 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 1,425.00 365 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 1,327.00 365 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 1,450.00 366 0.00 0 0.00 0
2017 ENERGY CORP OF AMER 1,460.00 365 0.00 0 0.00 0
2018 GREYLOCK OPCO LLC 1,431.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2002 ENERGY CORP OF AMER Brine 40.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
2003 ENERGY CORP OF AMER Brine 50.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
2004 ENERGY CORP OF AMER Brine 20.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
2005 ENERGY CORP OF AMER Brine 30.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
2006 ENERGY CORP OF AMER Brine 25.00 Bbl Municipal Sewage Treatment Plant PA0026310
2008 ENERGY CORP OF AMER Brine 30.00 Bbl Municipal Sewage Treatment Plant PA0026310

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
950531 Primary Facility 2000-06-28 Drilling/Alteration No Violations Noted drilling @ 537 feet. e&S OK
955494 Primary Facility 2000-07-06 Drilling/Alteration No Violations Noted Rig shut down; E&S, pits OK

For data sources see[7]

References