X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21667"

m
m
Line 113: Line 113:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 118: Line 119:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2017-M08
+
| 2017
| Drill Cuttings (in Tons) RWC 810
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 38.86 Tons
 
| LANDFILL
 
| 100955
 
|-
 
| 2017-M08
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 132.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M08
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 528.00 Bbl
+
| style="text-align: right;" | 578.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-M11
+
| 2017
| Drill Cuttings (in Tons) RWC 810
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 792.67 Tons
 
| LANDFILL
 
| 100955
 
|-
 
| 2017-M11
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 197.47 Bbl
+
| style="text-align: right;" | 302.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123
+
| WMGR123NC010
 
|-
 
|-
| 2017-M11
+
| 2017
 +
| [[INFLECTION ENERGY (PA) LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 70.00 Bbl
+
| style="text-align: right;" | 329.47 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR123
|-
 
| 2017-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 50.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
 
|-
 
|-
| 2017-M12
+
| 2017
 +
| [[INFLECTION ENERGY (PA) LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 1,635.74 Tons
+
| style="text-align: right;" | 2,467.27 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
 
|-
 
|-
| 2017-M12
+
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 232.00 Bbl
+
| style="text-align: right;" | 320.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018-M01
+
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 1,424.39 Tons
+
| style="text-align: right;" | 1,485.13 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
 
|-
 
|-
| 2018-M01
+
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 650.00 Bbl
 
| style="text-align: right;" | 650.00 Bbl
Line 184: Line 168:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2018-M01
+
| 2018
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 264.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2018-M01
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 628.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M01
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 6.02 Tons
 
| LANDFILL
 
| 100955
 
|-
 
| 2018-M02
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 60.74 Tons
 
| LANDFILL
 
| 100955
 
|-
 
| 2018-M02
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 195.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M02
 
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
| style="text-align: right;" | 25.37 Tons
+
| style="text-align: right;" | 31.39 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
 
|-
 
|-
| 2018-M04
+
| 2018
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 25.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2018-M05
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 31.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2018-M05
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 55.00 Bbl
+
| style="text-align: right;" | 878.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Revision as of 19:01, 21 August 2019

Well Details

Well ID: 37-081-21667
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Hepburn Township
Operator Name: INFLECTION ENERGY (PA) LLC
Well Pad ID: 153193
Farm/Lease Name: HENSLER 3
License Status: Active
Spud Date: 2017-08-21
Permit Date: 2017-05-08
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.302511
Longitude: -77.038069

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0
2019 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 578.00 Bbl REUSE (AT WELL PAD)
2017 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 302.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 329.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 INFLECTION ENERGY (PA) LLC Drill Cuttings (in Tons) RWC 810 2,467.27 Tons LANDFILL 100955
2018 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 320.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 INFLECTION ENERGY (PA) LLC Drill Cuttings (in Tons) RWC 810 1,485.13 Tons LANDFILL 100955
2018 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 650.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 INFLECTION ENERGY (PA) LLC Synthetic Liner Materials (in Tons) RWC 806 31.39 Tons LANDFILL 100955
2018 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 878.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2579464 Primary Facility 2017-04-05 Routine/Complete Inspection No Violations Noted Routine Inspection; 4/5/2017.

Rebecca Renner (DEP), Sean VanFleet (DEP), and I met with Donnie Stevenson, Greg Malekos, Gregg Saunders, and Jason DuPont all representing Inflection Energy at 08:55. We were invited to the site to look at the containment before drilling equipment is moved onto the site. The pad surface was graded and compacted toward the cellar then 10 oz. Geo. fabric was installed over the modified limestone material. The containment liner was then installed followed by a layer of thick rubber mats (see photos). The top of the containment berm is 9 inches higher than the elevation at the edge of the cellar. Overall, the containment looked good. Surface casing was being delivered and unloaded at the time of the inspection while conductor was already set on the Hensler 7 (081-21660). The site was well vegetated but would not be considered permanently stabilized. PCSM (Post Construction Stormwater Management) controls have been implemented. The fresh water impoundment currently contains

2588396 Primary Facility 2017-04-25 Complaint Inspection No Violations Noted Complaint inspection; 4/25/2017. I entered the site at 12:10. At the time of the inspection, the Orion 15 drill rig was onsite but being repaired. Earlier today the operator received complaint from a nearby landowner. After talking with the complainant, a request for water supply investigation (CID# 326420) was initiated. Samples were collected earlier today from the complainant’s water supply. The water in the water supply had a milky white appearance.

The area between the well pad and the complainant's water supply is well vegetated and no recent earth disturbance was noted. After entering the site I talked to Greg Malekos (Inflection) and I explained the purpose of my inspection. While discussing the complaint, Mr. Malekos explained that at 19:00-19:30 on 4/24/2017 (when the turbidity was first noticed in the complainant’swater supply) the Orion rig on the Hensler was reaming the surface hole on the Hensler 7 (081-21660). The total depth on the surface hole of the Hensler 7 was reached several

2594703 Primary Facility 2017-05-11 Routine/Complete Inspection No Violations Noted Spill Response Inspection; 5/11/2017. I entered the site at 12:55. At the time of the inspection, the Orion 15 drill rig was onsite drilling the production hole on the Hensler 7 (081-21660). Gregg Saunders (Inflection) called to report approximately 1 barrel of synthetic oil-based drill mud was spilled above the drill floor from the mud line on the Top Drive. Drill mud was sprayed on the rig and equipment on the south side. I found no evidence that drill mud left the containment and the volume estimate appears to be accurate. No Violations Noted.
2642613 Primary Facility 2017-10-02 Drilling/Alteration No Violations Noted Arrived at 11:45. Weather:cool snd clear. Met with company man Jerry Roberts. Zeigenfuss had just finished drilling the conductor for the plug and skid, at the time of my inspection. The skid well is 15'west of the 7H , which requires another plug in the casing across the surface casing shoe. Orion 15 was rigged up and being cleaned. Once the work on the new conductor is completed, the rig will walk across and finish the plug job and then get over to the new spud and start drillling. Hensler 3H is conductor only. Left at 13:00. No. Violations were observed during this inspection.
2645153 Primary Facility 2017-10-10 Drilling/Alteration No Violations Noted Arrived at 10:15. Weather: hot and humid. Met with company man Justin Foster. Hensler 7A is skid well, currently being drilled. Work going well. Orion 15 currently at 1184', drilling on air and soap. Surface section went very well drilled on air. Took MWD every 15' at first, then every 30'. At approx. 530' went over to directional because had started to deviate. Slid 100% to bottom of surface hole. Surface casing (18-5/8") set depth is 770'. Cement job went well. Hensler 7H is plugged. Hensler 3H, (081-20667), is conductor only. Left at 11:30. No. Violations were observed during this inspection.
2647768 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted I met Justin Foster when I arrived on-site. Orion rig #15 on location drilling the 7A well, at 2806'. Containments were in good condition, with some water built up in the mud tank containment and the chemical containment; Justin said he would see that these were addressed.
2650155 Primary Facility 2017-10-19 Drilling/Alteration No Violations Noted Arrived at 14:50 Weather, sunny and warm. Met with Habib Guerrero, drilling director, Greg Malekos, drilling superintendent, and Justin Foster, company man. Orion 15 on site. At the time of my inspection there was SOBM in the well bore (TD 4340'), and they were moving switchto a PDC bit. Previously drilling on air. Reviewed first IC cement log: pumped 30% excess but there were minimal returns to surface. Floats did not hold. Held pressure on cement head for 4 hours. Cement top at approx. 157', based on a tag from the top. HEnsler 3H is conductor only. No violations were observed at the time of my inspection
2655751 Primary Facility 2017-10-31 Drilling/Alteration No Violations Noted Arrived at 14:26. Weather: cloudy and cold. Hensler 3H is conductor only. Onsite were: Greg Malekos, Jerry Roberts and Jeff Whitehair. ORion 15 is on the skid well for the 7H. Halliburton Sperry onsite conducting managed pressure drilling. Baker onsite operating rotary directional. Hole depth was 6933' at the time of my inspection. Drilling pilot to 9842'. No violations were observed at the time of our inspection.
2658948 Primary Facility 2017-11-09 Drilling/Alteration No Violations Noted Arrived at 10:30 Weather: misty with light rain. Hensler 3H is conductor only. Onsite were: Justin Fowler and Carey Carr (Inflection). Orion 15 is on the skid well for the 7H. Halliburton Sperry onsite conducting managed pressure drilling. Baker onsite operating rotary directional. Pilot hole, plug back and kick off went well. Hole depth was 9258' at the time of my inspection. This was approximately half way towards building the curve. No violations were observed at the time of our inspection.
2663264 Primary Facility 2017-11-21 Drilling/Alteration No Violations Noted Arrived at 13:00. Weather: sunny, with temps in low 50s. Met with Company Man Jerry Rice. Orion 15 finished drilling the skid well for the 7H, and had moved to the 3H. At the time of my inspection, rig was preparing for a reamer run on the surface well bore (20"). Cellars were water filled for the 7H (plugged) and the 7A, Inflection's name for the finished skid well. No violations were observed at the time of my inspection.
2664768 Primary Facility 2017-11-28 Drilling/Alteration No Violations Noted Arrived at 13:40. Weather: sunny, with temps in low 50s. Met with Company Man Jerry Rice. Orion 15 was at 2810' on a reaming run for the 13-3/8" to be set at 2830'. Plan to run casing tonight and cement tomorrow morning. No violations were observed at the time of my inspection.
2671182 Primary Facility 2017-12-14 Drilling/Alteration No Violations Noted Arrived at 13:00. Weather: sunny, cold. Met with Company Man Justin Foster. Orion 15 on Hensler 3H, tripping in the hole and encoutering tight spots at 5653'. Last week ,severe washouts and steep dips at 4089'. Plugged back 600' to set cement plug approx. 100' up in first intermediate casing (13-3/8": 2810'). Sidetracked off about 100' below shoe at dogleg. Switched to oil-base prior to tripping in. Hensler 7H is plugged. Cellar filled with ice, no bubbling. 7H skid completed. Cellar iced over. No bubblung observed. No violations were observed at the time of my inspection.
2678498 Primary Facility 2018-01-03 Drilling/Alteration No Violations Noted Arrived at 16:00. Weather: sunny, calm, temps in high 20's. Met with Company Man Jerry Price. Orion 15 on Hensler 3H, at 6430'. Got stuck while reaming at approximately 6200' . Were stuck for a week over Christmas. Got unstuck by sending coiled tubing down drill pipe and trying to perf collars. Set second IC at 6255'. Large cuttings were coming from hole at the time of my inspection. Hensler 7H is plugged. Cellar filled with ice, no bubbling. 7H skid completed. Cellar iced over. No bubbling observed. No violations were observed at the time of my inspection.
2681909 Primary Facility 2018-01-11 Drilling/Alteration No Violations Noted Arrived at 14:00. Met with Company Man Jerry Price. Orion 15 on Hensler 3H, at 11869, running to 15005. Effective mud weight is 17 ppg, flare of approx. 1'.

Hensler 7H is plugged. Warm temps had partly melted the ice - no bubbling observed. 7H skid: completed. Cellar bubbling, source not determined. Returned to location on 1/12/18. Cellar was pumped down. Bubbling was from the 9-5/8" x 5-1/2", which was open to vent. No violations were observed at the time of my inspection.

2682525 Primary Facility 2018-01-03 Routine/Complete Inspection No Violations Noted The Orion 15 was onsite drilling the Hensler 3 well (081-21667). Air packs just came off the site but the liner remains onsite. Site containment is in good condition. The backyard and cuttings management look good especially considering cold conditions. No violations noted.
2689903 Primary Facility 2018-01-29 Routine/Complete Inspection No Violations Noted Arrived at 11:00. Weather: sunny, cold. Orion 15 has been laid down. Rig mats in place. Mud tanks being removed. Oil base on mats in many locations. Met with Mike Woodruff. Plans for DFIT in a few weeks. Drilling finished on Hensler 3H.

Hensler 7H is plugged. Hensler7H skid is drilled. Discussed condition of mats snd pad with Greg Malekos who said Inflection plans to remove mats and linear and evaluating the situation before fraccing the wells. No violations were observed at the time of my inspection.

2707883 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/15/2018.

At the time of the inspection I was alone onsite and two wells were onsite. Both the Hensler 3(081-21667) and Hensler 7 (081-21660) wells were onsite as well as the original Hensler 7 which was plugged but remains in a cellar. Overall, the site is cleaned-up from drilling operations and containment has been removed. No violations noted.

2709640 Primary Facility 2018-03-22 Plugging(Includes Plugged/Mined Through) No Violations Noted A routine inspection on the Hensler pad was conducted March 22, 2018. At the time of inspection, there were 3 wells on the pad; the 7H original hole, the new 7H hole drilled under that permit number after the original hole was plugged prior to reaching TD (plug and skid event), and the 3H. The 7H (plugged) original hole was capped, and had four annular vents. There was no flow or gas observed at any of the vents for this plugged well. The 7H new hole and 3H both were shut in on manual master valve atop wellhead assembly. All annuli had open vent pipes. No obvious issues were observed. Regarding the 7H original plugged hole; I spoke with the operator about permanent requirements for marking a plugged well and discussed that an erected or buried permanent marker may wait til after the other wells are completed for wellbore access and monitoring purposes during completion.
2819590 Primary Facility 2018-12-27 Routine/Complete Inspection No Violations Noted Two wells drilled and not staged for production. One well plugged and skidded(081-21660). No production equipment on location. One fresh water impoundment on location. The fresh water impoundment free board is maintained. One waste water storage container on location(see photo).

For data sources see[6]

References