X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21168"

m
m
Line 262: Line 262:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ANADARKO E&P ONSHORE LLC]]
+
| [[ARD OPR LLC]]
 
| style="text-align: right;" | 472,560.15
 
| style="text-align: right;" | 472,560.15
 
| style="text-align: right;" | 350
 
| style="text-align: right;" | 350
Line 298: Line 298:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 303: Line 304:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
| style="text-align: right;" | 405.91 Tons
+
| style="text-align: right;" | 1,075.57 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
 
|-
 
|-
| 2013-S02
+
| 2013
| Drill Cuttings (in Tons)
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 669.66 Tons
 
| LANDFILL
 
| 100955
 
|-
 
| 2013-S02
 
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 21.59 Tons
 
| style="text-align: right;" | 21.59 Tons
Line 321: Line 318:
 
| 301626
 
| 301626
 
|-
 
|-
| 2014-S01
+
| 2014
 +
| [[ANADARKO E&P ONSHORE LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 27,733.79 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 43.65 Tons
 
| style="text-align: right;" | 43.65 Tons
Line 327: Line 332:
 
| 301626
 
| 301626
 
|-
 
|-
| 2014-S01
+
| 2015
| Produced Fluid (in Barrels)
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 19,489.82 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 8,243.97 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S01
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 13,214.63 Bbl
 
| style="text-align: right;" | 13,214.63 Bbl
Line 345: Line 339:
 
|  
 
|  
 
|-
 
|-
| 2016-M09
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 313.89 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
|-
 
| 2016-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 239.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
|-
 
| 2016-M10
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 145.00 Bbl
 
| style="text-align: right;" | 145.00 Bbl
Line 363: Line 346:
 
|  
 
|  
 
|-
 
|-
| 2016-M11
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 239.00 Bbl
+
| style="text-align: right;" | 2,241.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NC010
+
| WMGR123
 
|-
 
|-
| 2016-M12
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 76.00 Bbl
+
| style="text-align: right;" | 1,326.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2016-M12
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 188.00 Bbl
 
| style="text-align: right;" | 188.00 Bbl
Line 381: Line 367:
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2016-S01
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 713.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW005
 
|-
 
| 2016-S01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
Line 393: Line 374:
 
| 34-031-27177
 
| 34-031-27177
 
|-
 
|-
| 2016-S01
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 1,326.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
|-
 
| 2016-S01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,241.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
|-
 
| 2016-S02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 440.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
|-
 
| 2017-M01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 76.00 Bbl
 
| style="text-align: right;" | 76.00 Bbl
Line 417: Line 381:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2017-M01
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 188.00 Bbl
+
| style="text-align: right;" | 713.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123NC010
 
|-
 
| 2017-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 135.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 86.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 157.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 61.77 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-031-27177
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 139.04 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 58.89 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2017-M05
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 131.00 Bbl
+
| style="text-align: right;" | 1,231.89 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2017-M05
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 112.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 44.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-031-27177
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 87.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 81.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 86.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 75.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 123.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 38.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 161.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 10.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 97.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M12
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 107.74 Bbl
 
| style="text-align: right;" | 107.74 Bbl
Line 555: Line 402:
 
|  
 
|  
 
|-
 
|-
| 2018-M01
+
| 2017
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 89.59 Bbl
+
| style="text-align: right;" | 463.00 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 7.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR123
 
|-
 
|-
| 2018-M02
+
| 2017
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 51.00 Bbl
+
| style="text-align: right;" | 105.77 Bbl
| REUSE (AT WELL PAD)
+
| INJECTION DISPOSAL WELL
|  
+
| 34-031-27177
 
|-
 
|-
| 2018-M03
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 314.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 225.95 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M05
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 251.78 Bbl
+
| style="text-align: right;" | 1,234.04 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 41.20 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 258.51 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 217.49 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 293.80 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018-M09
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 39.39 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M10
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 239.17 Bbl
+
| style="text-align: right;" | 326.89 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR123NW005
 
|-
 
|-
| 2018-M11
+
| 2017
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 129.31 Bbl
+
| style="text-align: right;" | 76.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR119
 
|-
 
|-
| 2019-M01
+
| 2018
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 5.43 Bbl
+
| style="text-align: right;" | 1,488.91 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 147.52 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2018
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 35.70 Bbl
+
| style="text-align: right;" | 669.28 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2019-M02
+
| 2019
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 179.67 Bbl
+
| style="text-align: right;" | 551.91 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[ARD OPR LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 81.40 Bbl
 
| style="text-align: right;" | 81.40 Bbl
Line 663: Line 465:
 
|  
 
|  
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 89.48 Bbl
+
| style="text-align: right;" | 130.61 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 224.72 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
 
|-
 
|-
 
|}
 
|}

Revision as of 18:09, 21 August 2019

Well Details

Well ID: 37-081-21168
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: ARD OPR LLC
Well Pad ID: 147015
Farm/Lease Name: ELBOW F&G CLUB B 8H
License Status: Active
Spud Date: 2013-05-27
Permit Date: 2013-05-15
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.366411
Longitude: -77.236814

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-04 2013-12-19 8540 8,150,590.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Aqucar DB 100 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 97 0.00268131 2003.59
2,2-Dibromomalonamide 73003-80-2 0.2 0.00000553 4.131
FR-15 Trican Well Service Friction Reducer Paraffinic, Naphthenic Solvent 64742-47-8 25 0.024738 18485.3
Proprietary Amide Proprietary 2.5 0.0024738 1848.53
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100 91.0236 68,016,700.0
Aqucar DB 5 Trican Well Service Biocide Polyethylene glycol 25322-68-3 65.2 0.00357655 2672.55
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.000274275 204.95
Sodium bromide 7647-15-6 1.5 0.00008228 61.485
Dibromoacetonitrile 3252-43-5 50 0.00274275 2049.5
Hydrochloric Acid (7.5%) Trican Well Service Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0226482 16923.7
Water 7732-18-5 92.5 0.279327 208725
Sand (Proppant) Trican Well Service Proppant Quartz 14808-60-7 99 8.47769 6,334,890.0
Hexamethylenetretramine 100-97-0 1 0.0856333 63988.8
FEAC-20 Trican Well Service Iron Control Acetic Acid 64-19-7 50 0.0013705 1024.1
Citric Acid 77-92-9 30 0.000822302 614.459
AI-7NR Trican Well Service Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00001161 8.679

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 1,200,465.00 303 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 319,314.00 121 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 884,111.00 365 0.00 0 0.00 0
2017 ARD OPR LLC 472,560.15 350 0.00 0 0.00 0
2018 ARD OPR LLC 372,618.37 328 0.00 0 0.00 0
2019 ARD OPR LLC 88,132.45 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 ANADARKO E&P ONSHORE LLC Drill Cuttings (in Tons) 1,075.57 Tons LANDFILL 100955
2013 ANADARKO E&P ONSHORE LLC Drill Cuttings (in Tons) 21.59 Tons LANDFILL 301626
2014 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 27,733.79 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Drill Cuttings (in Tons) 43.65 Tons LANDFILL 301626
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 13,214.63 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 145.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 2,241.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 1,326.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 188.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 55.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 76.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 713.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 1,231.89 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 107.74 Bbl REUSE (AT WELL PAD)
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 463.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 105.77 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 1,234.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 326.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 76.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 1,488.91 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 669.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 551.91 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes (in Barrels) RWC 899 81.40 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 130.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2171172 Primary Facility 2013-05-31 Drilling/Alteration No Violations Noted
2181913 Primary Facility 2013-07-09 Drilling/Alteration No Violations Noted
2214262 Primary Facility 2013-10-08 Drilling/Alteration No Violations Noted
2230388 Primary Facility 2013-12-18 Routine/Complete Inspection No Violations Noted
2243233 Primary Facility 2014-01-30 Routine/Partial Inspection No Violations Noted Precision coiled tubing rig onsite drilling out plugs. No Vio.
2247678 Primary Facility 2014-02-19 Routine/Partial Inspection No Violations Noted installing prod. equipment before flow-back. containment in poor cond. to be replaced before flowback
2259745 Primary Facility 2014-04-03 Routine/Complete Inspection No Violations Noted
2678262 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted The weather is 10 Deg. F and cloudy, windy at time of inspection.

Routine inspection of Alta Resources, LLC., Elbow Fish &Game Club Pad B, Well # 8H on January 3, 2018. There are 8 producing wells on this pad. 5-1/5¿x 9-5/8¿annulus is closed and digital gauge reads 8 PSI Digital gauge reads 1022 PSI on the production tubing and 1223 PSI on production casing at time of inspection. 0% combustible gas was detected at the annulus vent or in the area immediately surrounding the well. Well site looks neat and well organized. No violations noted.

2728255 Primary Facility 2018-05-09 Routine/Complete Inspection No Violations Noted Weather was 65° and sunny at time of inspection. There were no ARD representatives on location during inspection. Well has 3 digital gauges attached to the Production tubing, the production casing and to the 9 5/8" x 5 1/2" annulus vent. There is only one annulus vent plumbed to surface and it was closed in at time of inspection. The tubing pressure was 952 psi, the casing pressure was 1205 psi and the annulus vent pressure was 6 psi at time of inspection. Well tag was in place and legible and displayed the proper information. No violations were noted at time of inspection.
2775837 Primary Facility 2018-09-17 Routine/Complete Inspection No Violations Noted Eight wells staged for production phase. Eight each sand and water separators. No leaks detected from production equipment. Methanol tanks located near well heads. No violations noted.

For data sources see[7]

References