X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20148"

m
m
Line 86: Line 86:
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[ANADARKO E&P ONSHORE LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 158: Line 158:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ANADARKO E&P ONSHORE LLC]]
+
| [[ARD OPR LLC]]
 
| style="text-align: right;" | 213,996.51
 
| style="text-align: right;" | 213,996.51
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
Line 194: Line 194:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 199: Line 200:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,266.56 Bbl
 
| style="text-align: right;" | 1,266.56 Bbl
Line 205: Line 207:
 
|  
 
|  
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 346.30 Bbl
+
| style="text-align: right;" | 995.37 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-S02
+
| 2014
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 649.07 Bbl
+
| style="text-align: right;" | 1,315.30 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S01
+
| 2015
| Produced Fluid (in Barrels)
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 813.25 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 502.05 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 460.77 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 195.00 Bbl
 
| style="text-align: right;" | 195.00 Bbl
Line 241: Line 228:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2015-S02
+
| 2015
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 131.00 Bbl
 
| style="text-align: right;" | 131.00 Bbl
Line 247: Line 235:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2016-M10
+
| 2015
 +
| [[ANADARKO E&P ONSHORE LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 460.77 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 27.00 Bbl
 
| style="text-align: right;" | 27.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2016-M10
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 39.00 Bbl
+
| style="text-align: right;" | 122.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NC010
+
| WMGR123
 
|-
 
|-
| 2016-M11
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 27.00 Bbl
+
| style="text-align: right;" | 90.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2016-M11
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 39.00 Bbl
+
| style="text-align: right;" | 186.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123NC010
+
| WMGR123NW005
 
|-
 
|-
| 2016-M12
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 27.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR119
 
|-
 
| 2016-M12
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 283: Line 277:
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2016-S01
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 186.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW005
 
|-
 
| 2016-S01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
|-
 
| 2016-S01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 122.00 Bbl
+
| style="text-align: right;" | 172.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
|-
 
| 2016-S02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 94.00 Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2017-M01
+
| 2017
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 27.00 Bbl
+
| style="text-align: right;" | 38.10 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE (AT WELL PAD)
| WMGR119
+
|  
 
|-
 
|-
| 2017-M01
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 25.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 56.00 Bbl
+
| style="text-align: right;" | 74.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2017-M03
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 18.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 46.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M04
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 63.00 Bbl
+
| style="text-align: right;" | 114.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 61.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2017-M06
+
| 2017
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 27.00 Bbl
 
| style="text-align: right;" | 27.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR119
 
|-
 
|-
| 2017-M06
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 28.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 54.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M11
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 385: Line 319:
 
| 34-031-27177
 
| 34-031-27177
 
|-
 
|-
| 2017-M11
+
| 2017
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 25.00 Bbl
+
| style="text-align: right;" | 327.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NW005
+
| WMGR123NC010
 
|-
 
|-
| 2017-M12
+
| 2018
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 38.10 Bbl
+
| style="text-align: right;" | 307.21 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M01
+
| 2018
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 46.58 Bbl
+
| style="text-align: right;" | 52.88 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| WMGR123NC010
 
|-
 
|-
| 2018-M02
+
| 2019
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 31.00 Bbl
+
| style="text-align: right;" | 41.01 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M03
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 44.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 44.36 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 48.10 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 42.91 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.26 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 52.88 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2019-M01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 47.16 Bbl
 
| style="text-align: right;" | 47.16 Bbl
Line 451: Line 354:
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 6.73 Bbl
 
| style="text-align: right;" | 6.73 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR119
 
| WMGR119
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 41.01 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
 
|-
 
|-
 
|}
 
|}

Revision as of 16:00, 21 August 2019

Well Details

Well ID: 37-081-20148
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cummings Township
Operator Name: ARD OPR LLC
Well Pad ID: 148731
Farm/Lease Name: LARRY S CREEK F & G 3H
License Status: Active
Spud Date: 2009-09-22
Permit Date: 2009-02-25
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.343832
Longitude: -77.258747

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2010 ANADARKO E&P ONSHORE LLC 74,347.00 11 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 406,454.00 98 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 710,546.00 364 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 386,991.00 329 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 347,474.00 341 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 308,745.00 358 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 261,266.00 366 0.00 0 0.00 0
2017 ARD OPR LLC 213,996.51 334 0.00 0 0.00 0
2018 ARD OPR LLC 199,863.98 365 0.00 0 0.00 0
2019 ARD OPR LLC 44,764.36 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 1,266.56 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 995.37 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 1,315.30 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 195.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 131.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 460.77 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 27.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 122.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 90.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 186.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 172.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 38.10 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 74.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 114.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 27.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 25.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 327.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 307.21 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 52.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 41.01 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 47.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 6.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1816459 Primary Facility 2009-07-27 Routine/Complete Inspection No Violations Noted Site construction recently completed.
1832673 Primary Facility 2009-09-23 Drilling/Alteration No Violations Noted well site id sign to be on location 09/24/2009 in truck on other location.
1856856 Primary Facility 2010-01-12 Routine/Partial Inspection Violation(s) Noted
1872810 Primary Facility 2010-03-25 Routine/Complete Inspection Violation(s) Noted See Insp ID 1878137 done 4/20/2010, 78.56FRBRD viol corrected, NOV closed.
1878137 Primary Facility 2010-04-20 Follow-up Inspection No Violations Noted
1918227 Primary Facility 2010-09-22 Compliance Evaluation No Violations Noted
1918381 Primary Facility 2010-10-04 Follow-up Inspection No Violations Noted
1928428 Primary Facility 2010-11-04 Follow-up Inspection No Violations Noted
1950058 Primary Facility 2011-02-11 Routine/Complete Inspection No Violations Noted
1952610 Primary Facility 2011-02-22 Routine/Partial Inspection No Violations Noted
2010270 Primary Facility 2011-10-13 Follow-up Inspection No Violations Noted
2060435 Primary Facility 2012-04-11 Routine/Complete Inspection No Violations Noted
2504662 Primary Facility 2016-07-19 Routine/Complete Inspection No Violations Noted
2776106 Primary Facility 2018-09-18 Routine/Complete Inspection No Violations Noted Six wells staged for production phase. Six each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Methanol tanks located near well heads. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1856856 579702 01/12/2010 2010-01-12 78.57 - Failure to post pit approval number Administrative EDF 3/26/10 e-mail states past 78.57 viol closed.
1872810 584007 03/25/2010 2010-03-25 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative See Insp ID 1878137 done 4/20/2010, 78.56FRBRD viol corrected, NOV closed.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
579702 254371 NOV - Notice of Violation Comply/Closed 2010-03-26
584007 256415 NOV - Notice of Violation Comply/Closed 2010-04-20

For data sources see[6]

References