X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-27642"

m
m
Line 86: Line 86:
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[KRIEBEL MINERALS INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 95: Line 95:
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[KRIEBEL MINERALS INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 113: Line 113:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity

Revision as of 04:03, 21 August 2019

Well Details

Well ID: 37-129-27642
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: East Huntingdon Township
Operator Name: KRIEBEL MINERALS INC
Well Pad ID:
Farm/Lease Name: BIELECKI UNIT 002
License Status:
Spud Date:
Permit Date: 2008-09-08
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.169939
Longitude: -79.581503

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 KRIEBEL MINERALS INC 0.00 0 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1734533 Primary Facility 2008-08-26 Routine/Complete Inspection No Violations Noted Performed site inspection 08/26/08. Well staked, site not constructed. Proposed E&S plan should minimize accelerated E&S, provided the plan is implemented & maintained properly.

For data sources see[5]

References