X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-015-23423"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-015-23423
 
| Well ID: 37-015-23423
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.794283, -76.848539 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.794283, -76.848539 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/15/2018
+
| Spud Date: 2018-07-15
 
|-
 
|-
| Permit Date: 4/17/2018
+
| Permit Date: 2018-04-17
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 79: Line 104:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 84: Line 110:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-07
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[REPSOL OIL & GAS USA LLC]]
| style="text-align: right;" | 15.48 Tons
 
| LANDFILL
 
| 8-0728-0004/013
 
|-
 
| 2018-11
 
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.52 Tons
 
| style="text-align: right;" | 0.52 Tons
Line 96: Line 117:
 
| 8-0728-0004/013
 
| 8-0728-0004/013
 
|-
 
|-
| 2018-12
+
| 2018
 +
| [[REPSOL OIL & GAS USA LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 1,252.56 Tons
 
| style="text-align: right;" | 1,252.56 Tons
Line 102: Line 124:
 
| 101243
 
| 101243
 
|-
 
|-
| 2018-12
+
| 2018
 +
| [[REPSOL OIL & GAS USA LLC]]
 +
| Drill Cuttings (in Tons) RWC 810
 +
| style="text-align: right;" | 15.48 Tons
 +
| LANDFILL
 +
| 8-0728-0004/013
 +
|-
 +
| 2018
 +
| [[REPSOL OIL & GAS USA LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 48.23 Tons
 
| style="text-align: right;" | 48.23 Tons
Line 108: Line 138:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-01
+
| 2019
 +
| [[REPSOL OIL & GAS USA LLC]]
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.62 Tons
 
| style="text-align: right;" | 0.62 Tons
Line 114: Line 145:
 
| 8-0728-0004/013
 
| 8-0728-0004/013
 
|-
 
|-
| 2019-03
+
| 2019
 +
| [[REPSOL OIL & GAS USA LLC]]
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 0.04 Tons
 
| style="text-align: right;" | 0.04 Tons
Line 219: Line 251:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 14:39, 20 August 2019

Well Details

Well ID: 37-015-23423
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Columbia Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 155127
Farm/Lease Name: MONRO (03-142-06) G 6H
License Status: Active
Spud Date: 2018-07-15
Permit Date: 2018-04-17
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.794283
Longitude: -76.848539

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials (in Tons) RWC 806 0.52 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Drill Cuttings (in Tons) RWC 810 1,252.56 Tons LANDFILL 101243
2018 REPSOL OIL & GAS USA LLC Drill Cuttings (in Tons) RWC 810 15.48 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Drill Cuttings (in Tons) RWC 810 48.23 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials (in Tons) RWC 806 0.62 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2745555 Primary Facility 2018-06-26 Preoperation Inspection No Violations Noted Brubacher is working the access road with a dozer and roller today. Repsol plans to spud the future Marcellus Shale wells here soon. JLP
2752009 Primary Facility 2018-07-16 Routine/Complete Inspection No Violations Noted Warm/sunny at time of inspection.

Conductor only

2789132 Primary Facility 2018-10-16 Routine/Complete Inspection No Violations Noted Could not access well pad at time of visit due to construction/installation of production lines.

Inspection incomplete. Will revisit well pad in future days.

2810544 Primary Facility 2018-12-05 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of Repsol Oil & Gas's Monro (03-142) G Well Pad in Columbia Twp, Bradford County on 12/5/2018 at 0830 hours. The weather was 19 degrees and partly cloudy.

Tory Rogers, site safety supervisor, showed me around the site. They are currently drilling on the 6H with the Patterson Rig 805 and just recently started. The 40 gallon cement spill on containment that occurred on 12/3/2018 appeared to be cleaned up and remediated (see photo #1). All fluids observed were frozen, no issues were noted. No erosional issues were observed. All containment looked to be functioning properly. They are using double walled containment around there frac tanks which appeared to be working well. (photo #3). Tory was able to email me some photos taken on the day of the cement spill and a map to show the location (see photos #5, 6, 7, & 8).

No violations noted at this time. I departed the site at 0920 hours.

2816861 Primary Facility 2018-12-18 Drilling/Alteration No Violations Noted Arrived onsite to conduct a drilling inspection, located and entered the company mans quarters, the company man was not present, i did not conduct a full inspection due to company man was not present at time of inspection. I spoke to security guard at entrance of well site, he informed me that the company man had just left. I will return at a later date to conduct a full inspection.
2842195 Primary Facility 2019-02-20 Routine/Complete Inspection No Violations Noted I spoke with Shawn Callahan (REM Security & Safety) on site, and spoke with Rudy Yoder by phone. They explained the following: Repsol is rigging down Patterson 805 after drilling 8 Marcellus Shale wells from this pad. This morning ~0930 approx 1/2 quart of oil based drilling mud spilled on the pad. They removed the mud, and some pad material (photo 2) this morning.

I did not take electrical conductivity readings because i did not see any standing liquid on site (all frozen). Air temp 25F, snowing. JLP

For data sources see[6]

References