X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30849"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30849
 
| Well ID: 37-005-30849
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.804128, -79.550142 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.804128, -79.550142 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 11/04/2011
+
| Spud Date: 2011-11-04
 
|-
 
|-
| Permit Date: 7/6/2011
+
| Permit Date: 2011-07-06
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 97: Line 122:
 
|-
 
|-
 
| 2015
 
| 2015
| [[MDS ENERGY LTD]]
+
| [[MDS ENERGY DEV LLC]]
 
| style="text-align: right;" | 7,042.00
 
| style="text-align: right;" | 7,042.00
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 354
Line 151: Line 176:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 156: Line 182:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 15APRU
+
| 2011
| Produced Fluid (in Barrels)
+
| [[MDS ENERGY LTD]]
| style="text-align: right;" | 110.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
|-
 
| 2011-2
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,185.00 Bbl
 
| style="text-align: right;" | 2,185.00 Bbl
Line 168: Line 189:
 
| PA0254185
 
| PA0254185
 
|-
 
|-
| 2011-2
+
| 2011
 +
| [[MDS ENERGY LTD]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 90.00 Bbl
+
| style="text-align: right;" | 750.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-22523
+
| 34-155-23795
 
|-
 
|-
| 2011-2
+
| 2011
 +
| [[MDS ENERGY LTD]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 180.00 Bbl
 
| style="text-align: right;" | 180.00 Bbl
Line 180: Line 203:
 
| 34-155-21893
 
| 34-155-21893
 
|-
 
|-
| 2011-2
+
| 2011
 +
| [[MDS ENERGY LTD]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 750.00 Bbl
+
| style="text-align: right;" | 90.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-133-22523
 
|-
 
|-
| 2012-1
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[MDS ENERGY LTD]]
| style="text-align: right;" | 90.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 76.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 525-1
 
| 525-1
 
|-
 
|-
| 2012-1
+
| 2012
 +
| [[MDS ENERGY LTD]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 258.00 Bbl
+
| style="text-align: right;" | 90.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-155-21893
 
|-
 
| 2012-1
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 482.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
|-
 
| 2012-1
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 76.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 525-1
 
| 525-1
 
|-
 
|-
| 2012-1
+
| 2012
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 216.00 Bbl
+
| style="text-align: right;" | 326.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW008
 
| WMGR123SW008
 
|-
 
|-
| 2012-1
+
| 2012
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 160.00 Bbl
+
| style="text-align: right;" | 866.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21438
+
| 34-155-23795
 
|-
 
|-
| 2012-1
+
| 2012
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 318.00 Bbl
+
| style="text-align: right;" | 398.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23584
 
| 34-155-23584
 
|-
 
|-
| 2012-1
+
| 2012
| Produced Fluid (in Barrels)
+
| [[MDS ENERGY LTD]]
| style="text-align: right;" | 626.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 482.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
| 34-155-23795
 
|-
 
|-
| 2012-2
+
| 2012
| Produced Fluid (in Barrels)
+
| [[MDS ENERGY LTD]]
| style="text-align: right;" | 110.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW008
 
|-
 
| 2012-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 160.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
|-
 
| 2012-2
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 252: Line 259:
 
| 34-155-21447
 
| 34-155-21447
 
|-
 
|-
| 2012-2
+
| 2012
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 320.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23584
+
| 34-155-21438
 
|-
 
|-
| 2012-2
+
| 2012
| Produced Fluid (in Barrels)
+
| [[MDS ENERGY LTD]]
| style="text-align: right;" | 240.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 258.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-155-21893
 
|-
 
|-
| 2013-1
+
| 2013
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 93.00 Bbl
+
| style="text-align: right;" | 172.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-20525
+
| 34-155-23223
 
|-
 
|-
| 2013-1
+
| 2013
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 320.00 Bbl
+
| style="text-align: right;" | 486.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
| 34-155-21438
 
|-
 
|-
| 2013-2
+
| 2013
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 166.00 Bbl
+
| style="text-align: right;" | 93.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21438
+
| 34-133-20525
 
|-
 
|-
| 2013-2
+
| 2013
| Produced Fluid (in Barrels)
+
| [[MDS ENERGY LTD]]
| style="text-align: right;" | 172.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
|-
 
| 2013-2
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 167.00 Bbl
 
| style="text-align: right;" | 167.00 Bbl
Line 294: Line 301:
 
| 34-155-23732
 
| 34-155-23732
 
|-
 
|-
| 2014-1
+
| 2014
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 300.00 Bbl
+
| style="text-align: right;" | 90.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NW009
+
| WMGR123SW005
 
|-
 
|-
| 2014-2
+
| 2014
 +
| [[MDS ENERGY LTD]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 220.00 Bbl
+
| style="text-align: right;" | 520.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2014-2
+
| 2015
| Produced Fluid (in Barrels)
+
|  
| style="text-align: right;" | 90.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 2015-04
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 110.00 Bbl
 
| style="text-align: right;" | 110.00 Bbl
Line 337: Line 341:
 
| 2017962
 
| 2017962
 
| Primary Facility
 
| Primary Facility
| 11/02/2011
+
| 2011-11-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 344: Line 348:
 
| 2018459
 
| 2018459
 
| Primary Facility
 
| Primary Facility
| 11/09/2011
+
| 2011-11-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 351: Line 355:
 
| 2026185
 
| 2026185
 
| Primary Facility
 
| Primary Facility
| 12/13/2011
+
| 2011-12-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 358: Line 362:
 
| 2130020
 
| 2130020
 
| Primary Facility
 
| Primary Facility
| 12/21/2012
+
| 2012-12-21
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 365: Line 369:
 
| 2173546
 
| 2173546
 
| Primary Facility
 
| Primary Facility
| 06/07/2013
+
| 2013-06-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 372: Line 376:
 
| 2393698
 
| 2393698
 
| Primary Facility
 
| Primary Facility
| 07/29/2015
+
| 2015-07-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 414: Line 418:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:09, 20 August 2019

Well Details

Well ID: 37-005-30849
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 146372
Farm/Lease Name: TMH DEVELOPMENT COMPANY LLC 1M
License Status: Active
Spud Date: 2011-11-04
Permit Date: 2011-07-06
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 40.804128
Longitude: -79.550142

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 MDS ENERGY LTD 2,197.00 8 0.00 0 0.00 0
2012 MDS ENERGY LTD 42,151.00 352 0.00 0 0.00 0
2013 MDS ENERGY LTD 19,218.00 336 0.00 0 0.00 0
2014 MDS ENERGY LTD 14,691.00 358 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 7,042.00 354 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 3,966.00 339 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 3,385.00 333 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 2,703.00 250 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 469.00 74 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 MDS ENERGY LTD Fracing Fluid Waste (in Barrels) 2,185.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 MDS ENERGY LTD Fracing Fluid Waste (in Barrels) 750.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2011 MDS ENERGY LTD Fracing Fluid Waste (in Barrels) 180.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 MDS ENERGY LTD Fracing Fluid Waste (in Barrels) 90.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2012 MDS ENERGY LTD Produced Fluid (in Barrels) 76.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012 MDS ENERGY LTD Fracing Fluid Waste (in Barrels) 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012 MDS ENERGY LTD Produced Fluid (in Barrels) 326.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 MDS ENERGY LTD Produced Fluid (in Barrels) 866.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 MDS ENERGY LTD Produced Fluid (in Barrels) 398.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 MDS ENERGY LTD Fracing Fluid Waste (in Barrels) 482.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 MDS ENERGY LTD Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 MDS ENERGY LTD Produced Fluid (in Barrels) 320.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 MDS ENERGY LTD Fracing Fluid Waste (in Barrels) 258.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 MDS ENERGY LTD Produced Fluid (in Barrels) 172.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 MDS ENERGY LTD Produced Fluid (in Barrels) 486.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 MDS ENERGY LTD Produced Fluid (in Barrels) 93.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2013 MDS ENERGY LTD Produced Fluid (in Barrels) 167.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 MDS ENERGY LTD Produced Fluid (in Barrels) 90.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 MDS ENERGY LTD Produced Fluid (in Barrels) 520.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2017962 Primary Facility 2011-11-02 Routine/Complete Inspection No Violations Noted Site construction had been completed, driling had not commenced at the time of the inspection. Noted that the site had been cinstructed in a maner that there was an area near the well stake which was about 2 feet lower tha the remainder of the pad. This would result in an accumulation of runoff flow from the well pad and concentration of the runoff flowing off the pad. It was noted that this may have already occurred and that the operator had maintained the eisting erosion controls as neccesary as a result of this runoff flow. Touched base with MDS Enegry via phone regarding this site and the recommendation that some action be taken to bring this low level area up to meet the remainder of the well pad. Drill pit onsite, it contained fluids and it had more than the reqired two feet of lined freeboard.
2018459 Primary Facility 2011-11-09 Drilling/Alteration No Violations Noted First Class Energy Rig#1 Schramm drilled to 7000' TD at time of inspection. Pit lined and freeboard maintained.
2026185 Primary Facility 2011-12-13 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed at the time of the inspection. Drill pit located onsite and it contained drill cuttings and drill fluids. Drill pit had more than the required two feet of lined freeboard. Access road and erosion controls had been implented and maintained properly. There was no observed accelerated erosion or sedimentation related to the access road or site.
2130020 Primary Facility 2012-12-21 Site Restoration No Violations Noted Site was drilled and appeared not to be equipped for production. Site had been re-graded and seeded. Vegetative cover appeared to be uniform and approaching 70 percent. Erosion and sedimentation controls appeared to be properly installed. No erosion or sedimentation issues were evident.
2173546 Primary Facility 2013-06-07 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well-site ahd been appropriately restored and the was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road.
2393698 Primary Facility 2015-07-29 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. There was no observed accelrated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition.
2630028 Primary Facility 2017-08-29 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the access road.

For data sources see[6]

References