If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 104: | Line 104: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 109: | Line 110: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings (in Tons) RWC 810 |
− | | | + | | style="text-align: right;" | 658.50 Tons |
− | | | + | | LANDFILL |
+ | | 100172 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
| style="text-align: right;" | 78.32 Tons | | style="text-align: right;" | 78.32 Tons | ||
Line 121: | Line 124: | ||
| 06-08438 | | 06-08438 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes (in Tons) RWC 899 |
+ | | style="text-align: right;" | 3.18 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100172 | | 100172 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[RICE DRILLING B LLC]] | ||
| Other Oil & Gas Wastes (in Barrels) RWC 899 | | Other Oil & Gas Wastes (in Barrels) RWC 899 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 349.38 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} |
Well ID: 37-059-27801 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.828347,"lon":-80.477908,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Aleppo Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153339 | |
Farm/Lease Name: GREAT TIGER NFR4H5 | |
License Status: Active | |
Spud Date: 2019-02-27 | |
Permit Date: 2019-02-25 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.828347 | |
Longitude: -80.477908 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 658.50 Tons | LANDFILL | 100172 |
2019 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 78.32 Tons | LANDFILL | 06-08438 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Tons) RWC 899 | 3.18 Tons | LANDFILL | 100172 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 349.38 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2846706 | Primary Facility | 2019-02-28 | Drilling/Alteration | No Violations Noted | The well was spud on 2/27/19. The operator augered a 36" hole to 40' and set and cemented a 26" conductor. The conductor was cemented from the seat to the surface through 1-inch tubing. The well cellar has been installed. |
For data sources see[6]