X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22100"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22100
 
| Well ID: 37-003-22100
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.460964, -79.766869 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.460964, -79.766869 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/10/2010
+
| Spud Date: 2010-09-10
 
|-
 
|-
| Permit Date: 12/15/2009
+
| Permit Date: 2009-12-15
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[PENNECO OIL CO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 74: Line 99:
 
| style="text-align: right;" | 153
 
| style="text-align: right;" | 153
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 83: Line 108:
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 92: Line 117:
 
| style="text-align: right;" | 273
 
| style="text-align: right;" | 273
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 110: Line 135:
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 119: Line 144:
 
| style="text-align: right;" | 243
 
| style="text-align: right;" | 243
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 139: Line 164:
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 151: Line 176:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 156: Line 182:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[PENNECO OIL CO INC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,509.52 Bbl
 
| style="text-align: right;" | 2,509.52 Bbl
Line 162: Line 189:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[PENNECO OIL CO INC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 168: Line 196:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[PENNECO OIL CO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 73.00 Bbl
 
| style="text-align: right;" | 73.00 Bbl
Line 193: Line 222:
 
| 1915436
 
| 1915436
 
| Primary Facility
 
| Primary Facility
| 09/13/2010
+
| 2010-09-13
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 200: Line 229:
 
| 1917112
 
| 1917112
 
| Primary Facility
 
| Primary Facility
| 09/16/2010
+
| 2010-09-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 207: Line 236:
 
| 1928566
 
| 1928566
 
| Primary Facility
 
| Primary Facility
| 10/05/2010
+
| 2010-10-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 214: Line 243:
 
| 1937888
 
| 1937888
 
| Primary Facility
 
| Primary Facility
| 12/16/2010
+
| 2010-12-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 221: Line 250:
 
| 1940318
 
| 1940318
 
| Primary Facility
 
| Primary Facility
| 12/28/2010
+
| 2010-12-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 228: Line 257:
 
| 1986518
 
| 1986518
 
| Primary Facility
 
| Primary Facility
| 06/14/2011
+
| 2011-06-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 263: Line 292:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 07:57, 19 August 2019

Well Details

Well ID: 37-003-22100
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Monroeville Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: J MARTIN 1
License Status: Active
Spud Date: 2010-09-10
Permit Date: 2009-12-15
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.460964
Longitude: -79.766869

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2011 PENNECO OIL CO INC 2,668.00 153 0.00 0 0.00 0
2012 PENNECO OIL CO INC 2,021.00 304 0.00 0 0.00 0
2013 PENNECO OIL CO INC 5,478.00 273 0.00 0 0.00 0
2014 PENNECO OIL CO INC 7,699.00 365 0.00 0 0.00 0
2015 PENNECO OIL CO INC 4,850.00 242 0.00 0 0.00 0
2016 PENNECO OIL CO INC 4,179.00 243 0.00 0 0.00 0
2017 PENNECO OIL CO INC 3,375.00 334 0.00 0 0.00 0
2018 PENNECO OIL CO INC 5,688.00 365 24.48 31 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Drilling Fluid Waste (in Barrels) 2,509.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Fracing Fluid Waste (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2013 PENNECO OIL CO INC Produced Fluid (in Barrels) 73.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1915436 Primary Facility 2010-09-13 Drilling/Alteration No Violations Noted USE RIG 5 IS DRILLING. UNIVERSAL IS ON SITE TO CEMENT 95/8" CASING. THE SITE, PIT, ACCESS IS O.K..
1917112 Primary Facility 2010-09-16 Routine/Complete Inspection No Violations Noted On September 16th, 2010 I conducted a routine inspection of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were posted on site. The site was previously altered/stripped. E&S controls were in place according to the plan. The pits displayed more than sufficient freeboard. Some dust was being created by the drilling but it was not leaving site at the time of the inspection.
1928566 Primary Facility 2010-10-05 Routine/Complete Inspection No Violations Noted On October 5th, 2010 I conducted a routine inspection of the above site. Drilling was completed. The frac was alos completed. The access road was in good condition. A site ID sign and E&S plan were posted on site. The pits remained open. The site was previously altered/stripped. E&S controls were in place according to the plan. Some slips were starting to develop on the cut slope.
1937888 Primary Facility 2010-12-16 Drilling/Alteration No Violations Noted DRILLING COMPLETE. THE SITE IS GRADED, THE PIT IS GONE, AND THE ACCESS IS GATED.
1940318 Primary Facility 2010-12-28 Routine/Complete Inspection No Violations Noted On December 28th, 2010 I conducted a routine inspection of the above site. Drilling was completed. The well was not yet in production. The access road was in good condition. A site ID sign and E&S plan were posted on site. The pits were closed and filled. E&S controls were in place. Some slips were still evident on the cut slope.
1986518 Primary Facility 2011-06-14 Routine/Complete Inspection No Violations Noted On June 14th, 2011 I conducted a routine inspection of the above site. The well was now in production. The access road was in good condition. A site ID sign and E&S plan were still posted on site. A well tag was present. E&S controls were in place. Some slips were still evident on the cut slope. Property owner is storing construction debris and heavy equipment on the pad.

For data sources see[6]

References