X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-25998"

m
m
Line 212: Line 212:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 217: Line 218:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[MID EAST OIL CO]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 680.00 Bbl
 
| style="text-align: right;" | 680.00 Bbl
Line 223: Line 225:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[MID EAST OIL CO]]
 
| Drilling
 
| Drilling
 
| style="text-align: right;" | 640.00 Bbl
 
| style="text-align: right;" | 640.00 Bbl
Line 229: Line 232:
 
| PA0037966
 
| PA0037966
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[MID EAST OIL CO]]
 
| Fracking Fluid
 
| Fracking Fluid
 
| style="text-align: right;" | 320.00 Bbl
 
| style="text-align: right;" | 320.00 Bbl
Line 235: Line 239:
 
| PA0037966
 
| PA0037966
 
|-
 
|-
| 2012-A00
+
| 2012
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 241: Line 246:
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2012-A00
+
| 2012
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 247: Line 253:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2013-A00
+
| 2013
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 253: Line 260:
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2013-A00
+
| 2013
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 259: Line 267:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2014-A00
+
| 2014
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 265: Line 274:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2016-A00
+
| 2016
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 271: Line 281:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2017-A00
+
| 2017
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 277: Line 288:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2018-A00
+
| 2018
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl

Revision as of 05:23, 19 August 2019

Well Details

Well ID: 37-033-25998
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Huston Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: CHAGRIN BEL 63
License Status: Active
Spud Date: 2006-02-14
Permit Date: 2006-02-07
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.194257
Longitude: -78.623089

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 MID EAST OIL CO 8,270.00 272 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 8,848.00 304 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 5,095.00 334 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 3,650.00 365 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 1,785.00 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 2,409.00 334 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 959.00 184 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 1,399.00 365 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 1,581.00 365 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 1,996.53 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 2,128.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 1,231.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 1,642.80 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 MID EAST OIL CO Brine 680.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2006 MID EAST OIL CO Drilling 640.00 Bbl Municipal Sewage Treatment Plant PA0037966
2006 MID EAST OIL CO Fracking Fluid 320.00 Bbl Municipal Sewage Treatment Plant PA0037966
2012 DANNIC ENERGY CORP Produced Fluid (in Barrels) 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2012 DANNIC ENERGY CORP Produced Fluid (in Barrels) 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2013 DANNIC ENERGY CORP Produced Fluid (in Barrels) 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 DANNIC ENERGY CORP Produced Fluid (in Barrels) 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2014 DANNIC ENERGY CORP Produced Fluid (in Barrels) 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2017 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[5]

References