X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20056"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-20056
 
| Well ID: 37-081-20056
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.376698, -77.137140 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.376698, -77.137140 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/23/2007
+
| Spud Date: 2007-07-23
 
|-
 
|-
| Permit Date: 5/31/2007
+
| Permit Date: 2007-05-31
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 229: Line 254:
 
| 1639987
 
| 1639987
 
| Primary Facility
 
| Primary Facility
| 07/27/2007
+
| 2007-07-27
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 236: Line 261:
 
| 1679632
 
| 1679632
 
| Primary Facility
 
| Primary Facility
| 01/16/2008
+
| 2008-01-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 243: Line 268:
 
| 1700196
 
| 1700196
 
| Primary Facility
 
| Primary Facility
| 04/17/2008
+
| 2008-04-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 250: Line 275:
 
| 1701007
 
| 1701007
 
| Primary Facility
 
| Primary Facility
| 04/17/2008
+
| 2008-04-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 257: Line 282:
 
| 1704372
 
| 1704372
 
| Primary Facility
 
| Primary Facility
| 05/06/2008
+
| 2008-05-06
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 264: Line 289:
 
| 1704671
 
| 1704671
 
| Primary Facility
 
| Primary Facility
| 04/30/2008
+
| 2008-04-30
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 271: Line 296:
 
| 1709898
 
| 1709898
 
| Primary Facility
 
| Primary Facility
| 05/21/2008
+
| 2008-05-21
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 278: Line 303:
 
| 1713344
 
| 1713344
 
| Primary Facility
 
| Primary Facility
| 06/04/2008
+
| 2008-06-04
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 285: Line 310:
 
| 1741014
 
| 1741014
 
| Primary Facility
 
| Primary Facility
| 10/08/2008
+
| 2008-10-08
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 292: Line 317:
 
| 1814221
 
| 1814221
 
| Primary Facility
 
| Primary Facility
| 06/15/2009
+
| 2009-06-15
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 299: Line 324:
 
| 1832353
 
| 1832353
 
| Primary Facility
 
| Primary Facility
| 09/25/2009
+
| 2009-09-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 306: Line 331:
 
| 2006688
 
| 2006688
 
| Primary Facility
 
| Primary Facility
| 09/29/2011
+
| 2011-09-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 313: Line 338:
 
| 2023689
 
| 2023689
 
| Primary Facility
 
| Primary Facility
| 12/01/2011
+
| 2011-12-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 320: Line 345:
 
| 2064650
 
| 2064650
 
| Primary Facility
 
| Primary Facility
| 04/26/2012
+
| 2012-04-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 327: Line 352:
 
| 2093024
 
| 2093024
 
| Primary Facility
 
| Primary Facility
| 08/17/2012
+
| 2012-08-17
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 334: Line 359:
 
| 2104798
 
| 2104798
 
| Primary Facility
 
| Primary Facility
| 10/03/2012
+
| 2012-10-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 341: Line 366:
 
| 2166574
 
| 2166574
 
| Primary Facility
 
| Primary Facility
| 05/13/2013
+
| 2013-05-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 348: Line 373:
 
| 2354911
 
| 2354911
 
| Primary Facility
 
| Primary Facility
| 03/23/2015
+
| 2015-03-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 389: Line 414:
 
| 537085
 
| 537085
 
| 04/17/2008
 
| 04/17/2008
| 05/06/2008
+
| 2008-04-17
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 397: Line 422:
 
| 540054
 
| 540054
 
| 05/21/2008
 
| 05/21/2008
| 06/04/2008
+
| 2008-05-21
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 405: Line 430:
 
| 561053
 
| 561053
 
| 05/21/2008
 
| 05/21/2008
| 06/04/2008
+
| 2008-05-21
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| Administrative
 
| Administrative
Line 427: Line 452:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/06/2008
+
| 2008-05-06
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 436: Line 461:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/02/2008
+
| 2008-10-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 444: Line 469:
 
| COA - Consent Order and Agreement
 
| COA - Consent Order and Agreement
 
| Comply/Closed
 
| Comply/Closed
| 04/20/2009
+
| 2009-04-20
| 07/07/2009
+
| 2009-07-07
 
| style="text-align: right;" | $64,000.00
 
| style="text-align: right;" | $64,000.00
 
| style="text-align: right;" | $64,000.00
 
| style="text-align: right;" | $64,000.00
Line 453: Line 478:
 
| COA - Consent Order and Agreement
 
| COA - Consent Order and Agreement
 
| Comply/Closed
 
| Comply/Closed
| 04/20/2009
+
| 2009-04-20
| 07/07/2009
+
| 2009-07-07
 
| style="text-align: right;" | $64,000.00
 
| style="text-align: right;" | $64,000.00
 
| style="text-align: right;" | $64,000.00
 
| style="text-align: right;" | $64,000.00
Line 465: Line 490:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 22:53, 1 August 2019

Well Details

Well ID: 37-081-20056
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 147833
Farm/Lease Name: BOBST MTN HUNTING CLUB 1
License Status: Active
Spud Date: 2007-07-23
Permit Date: 2007-05-31
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 41.376698
Longitude: -77.137140

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 0.00 0 0.00 0 0.00 0
2008 0.00 0 0.00 0 0.00 0
2009 0.00 0 0.00 0 0.00 0
2010 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 RANGE RESOURCES APPALACHIA LLC 5,172.00 17 0.00 0 0.00 0
2013 RANGE RESOURCES APPALACHIA LLC 76,763.00 365 0.00 0 0.00 0
2014 RANGE RESOURCES APPALACHIA LLC 15,214.00 347 0.00 0 0.00 0
2015 RANGE RESOURCES APPALACHIA LLC 8,447.00 249 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 8,579.53 284 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 6,790.78 266 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 4,794.16 184 0.00 0 0.00 0
2019 RANGE RESOURCES APPALACHIA LLC 1,025.62 32 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S02 Produced Fluid (in Barrels) 276.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 488.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-S02 Produced Fluid (in Barrels) 101.88 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1639987 Primary Facility 2007-07-27 Drilling/Alteration No Violations Noted
1679632 Primary Facility 2008-01-16 Routine/Complete Inspection No Violations Noted
1700196 Primary Facility 2008-04-17 Routine/Complete Inspection Violation(s) Noted
1701007 Primary Facility 2008-04-17 Routine/Complete Inspection No Violations Noted
1704372 Primary Facility 2008-05-06 Compliance Evaluation No Violations Noted
1704671 Primary Facility 2008-04-30 Drilling/Alteration No Violations Noted
1709898 Primary Facility 2008-05-21 Routine/Complete Inspection Violation(s) Noted
1713344 Primary Facility 2008-06-04 Compliance Evaluation No Violations Noted
1741014 Primary Facility 2008-10-08 Site Restoration No Violations Noted
1814221 Primary Facility 2009-06-15 Site Restoration No Violations Noted Site restored, >70% vegetative growth.
1832353 Primary Facility 2009-09-25 Routine/Complete Inspection No Violations Noted
2006688 Primary Facility 2011-09-29 Drilling/Alteration No Violations Noted
2023689 Primary Facility 2011-12-01 Routine/Complete Inspection No Violations Noted pre-construction to rebuild the existing reclaimed pad to add the Bobst 34-37H
2064650 Primary Facility 2012-04-26 Routine/Complete Inspection No Violations Noted pad reconstructed, 4 new wells have conductor and cellars installed. No E&S issues, No Vio.
2093024 Primary Facility 2012-08-17 Drilling/Alteration No Violations Noted
2104798 Primary Facility 2012-10-03 Routine/Complete Inspection No Violations Noted rig onsite drilling 37H No Vios.
2166574 Primary Facility 2013-05-13 Routine/Complete Inspection No Violations Noted
2354911 Primary Facility 2015-03-23 Routine/Complete Inspection No Violations Noted At the time of inspection sunny sky, no snow cover and ~20° F.
2520209 Primary Facility 2016-09-13 Routine/Complete Inspection No Violations Noted Arrived @ 10:05. Weather: sunny. Five producing wells, no personnel onsite.

Bobst Mtn HC 01: 5-1/2”: 670 psi (0-1500 psi, analog), could not read top gauge. 9-5/8” x 5-1/2”: to individual polytank, no gas. No 13-3/8” x 9-5/8” annulus visible. Bobst Unit 34H: foam injection, 5-1/2”: 660 psi (0-2000psi, analog), top gauge: 600psi (0-5000psi), 9-5/8” x 5-1/2”: plumbed to common polytank, no 13-3/8” x 9-5/8” annulus visible. Bobst Unit 35H: 5-1/2”: 660 psi (0-2000psi, analog), top gauge: 600psi (0-5000psi), 9-5/8” x 5-1/2”: plumbed to common polytank, no 13-3/8” x 9-5/8” annulus visible. Bobst Unit 36H: foam injection, 5-1/2”: 700 psi (0-2000psi, analog), top gauge: 640psi (0-5000psi), 9-5/8” x 5-1/2”: plumbed to common polytank, no 13-3/8” x 9-5/8” annulus visible. Bobst Unit 37H: 5-1/2”: 700 psi (0-2000psi, analog), top gauge: 620psi (0-1500psi), 9-5/8” x 5-1/2”: plumbed to common polytank, no 13-3/8” x 9-5/8” annulus visible. Common polytank monitored with Altair 5X gas meter (calibrated 09/13/16). 3

2847624 Primary Facility 2018-12-07 Routine/Complete Inspection No Violations Noted Note: This inspection was conducted on 12/7/2018

Five wells staged for production phase. Five each water separator not within containment. No leaks detected from production equipment. Methanol tanks located near well heads. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1700196 537085 04/17/2008 2008-04-17 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety BMPs not implemented
1709898 540054 05/21/2008 2008-05-21 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Disturbed areas need seeded and mulched.
1709898 561053 05/21/2008 2008-05-21 102.4NOPLAN - No E&S plan developed, plan not on site Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
537085 232924 NOV - Notice of Violation Comply/Closed 2008-05-06
540054 234973 NOV - Notice of Violation Comply/Closed 2008-10-02
540054 245102 COA - Consent Order and Agreement Comply/Closed 2009-04-20 2009-07-07 $64,000.00 $64,000.00
561053 245102 COA - Consent Order and Agreement Comply/Closed 2009-04-20 2009-07-07 $64,000.00 $64,000.00

For data sources see[6]

References